Operator

Good afternoon. Thank you for attending today's Wolfspeed Inc. Q2 Fiscal Year 20 24 Earnings Call. I would now like to pass the conference over to Tyler Grunbach, VP of External Affairs. You may proceed.

Speaker 1

Thank you, operator, and good afternoon, everyone. Welcome to Wolfspeed's Q2 fiscal 2024 conference call. Today, Wolfspeed's CEO, Greg Lowe and Wolfspeed's CFO, Neil Reynolds, will report on the results for the Q2 of fiscal year 2024. Please note that we will be presenting non GAAP financial results during today's call, which we believe provides useful information to our investors. Non GAAP results are not in accordance with GAAP and may not be comparable to non GAAP information provided by other companies.

Speaker 1

Non GAAP information should be considered a supplement to and not a substitute for financial statements prepared in accordance with GAAP. A reconciliation to the most directly comparable GAAP measures is in our press release and posted in the Investor Relations section of our website, along with a historical summary of other key metrics. Today's discussion includes forward looking statements about our business outlook, and we may make other forward looking statements during the call. Such forward looking statements are subject to numerous risks and uncertainties. Our press release today and the SEC filings noted in the release mention important factors that could cause actual results to differ materially.

Speaker 1

Lastly, I would also like to note that this quarter we completed the sale of our RF business to MACOM. The results of our RF business are classified as discontinued operations and all discussions today will be on a continuing operations basis. During the Q and A session, we would ask that you limit yourself to one question so that we can accommodate as many questions as possible during today's call. And now I'd like to turn the call over to Greg.

Speaker 2

Thanks, Tyler, and good afternoon, everyone. As the world's only pure play vertically integrated silicon carbide company, Wolfspeed is leading the industry shift from silicon to silicon carbide across both materials and devices. Our focus remains on scaling operations effectively and executing on the long term investment plan that we have in place. While there are still challenges ahead of us, we are proud of the strong progress we've made on our strategic initiatives over the past Couple of quarters. Importantly, we're encouraged by the developments across key internal metrics.

Speaker 2

The Mohawk Valley fab delivered improved performance and is on track to achieve 20% utilization in the June quarter. From a 200 millimeter substrate perspective, there is now ample runway to not only meet, but exceed our original utilization target from Building 10 on the Durham campus as we're consistently producing high quality, high yielding 200 millimeter wafers out of this facility. The additional flexibility will be important as we begin producing substrates in the latter half of this year at the JP. Overall, I'm confident about our execution of our near term operational goals and optimistic around our long term financial prospects. Showing our unwavering focus on execution, the 2nd quarter continued the solid momentum from the Q1.

Speaker 2

We've said time and time again that all roads lead to Mohawk Valley and this past quarter was no exception. The fab contributed approximately $12,000,000 to our quarterly revenue, roughly triple last quarter's levels and at the midpoint of our guidance. I spent a lot of time at Mohawk Valley this past quarter and witnessed the dedication of our team firsthand, who along with our incredible tool suppliers are working around the clock on tool optimization activities related to this first of its kind grant. Wolfspeed at its core is an innovative company full of problem solvers and I'm very grateful to the entire team that we are heads down and focused on execution at this fab. To give you a sense for the progress at Mohawk Valley, So far, we've qualified over a dozen customer parts, including 2 of our most complicated automotive devices, as well as the largest device we are currently producing at the facility.

Speaker 2

This gives us more than enough qualified parts to achieve our 20% utilization goal and we expect to continue to qualify more parts between now and the end of June, further supporting the Mohawk Valley revenue ramp. Additionally, we received our IATF Automotive Certification at Mohawk Valley, which is an industry standard to ship to OEMs and Tier 1s. This is an important milestone and we are pleased to have achieved it on our first attempt. On the material side of our operations, At Building 10, we've now installed all crystal growers necessary to achieve 20% utilization at the Mohawk Valley fab by June of 2024. Wafers out of Building 10 are yielding very well and we now have plenty of 200 millimeter capacity to achieve our 20% utilization target.

Speaker 2

In fact, the quality of the material and the current yield Give us confidence that Building 10 will be able to support approximately 25% wafer start utilization at Mohawk Valley by the end of calendar 2024, well above our original expectations. However, We'd still like to remind everyone that the ramp cadence at Mohawk Valley has not changed based on this development. And to be clear, The normal challenges of ramping a brand new 200 millimeter fab remain and we are well aware that this ramp will not be linear. While we're pleased with the fab performance, our Mohawk Valley team continues to work on optimizing Factory tool utilization and availability. It's important to remember that this is the first time these tools have processed 200 millimeter silicon carbide wafers and tool integration is a critical step as we ramp production.

Speaker 2

Lastly, as it relates to our materials facility at the JP in Seiler City, we will begin installing Crystal Growers in early February and would expect to begin qualifying furnaces in the September quarter of this year. All the learnings with 100 millimeter crystal growth at Building 10 will better position us to hit the ground running in Shiloh City and we anticipate Blue production starting by the end of calendar 2024. And finally, before I hand the call over to Neil, I'd like to share a few observations about the internal combustion engine to electric vehicle transition. The shift of course is well underway, but it's happening at a more modest pace than some had previously anticipated. This really has no impact on our business outlook as we were still very early in the adoption phase of our silicon carbide devices across numerous car models that were being introduced to the market in the next 2 years.

Speaker 2

Underscoring this is our strong design ins and design win performance this quarter. As a reminder, a design in represents business we've been awarded. And the conversion to design win happens when the customer places production orders for 20% of the 1st year production volume. In other words, the design win indicates that the customer is beginning to ramp their production with our devices. We achieved $2,100,000,000 in design ends this quarter, marking our 3rd highest quarter on record, which clearly indicates continuing and growing robust demand for silicon carbide.

Speaker 2

More importantly, We posted a record of $2,900,000,000 of design wins, which were heavily weighted towards EVs and included 28 different electric vehicle models. This diverse customer base across the global Electric vehicle industry with multiple OEMs and Tier 1s gives us confidence to continue with our expansion plans and further illustrates why we believe our supply will be continuing to work to catch up with demand over the next few years. And these design wins are just the beginning. Over the next 5 years based on our current design ends, The number of EVs leveraging Wolfspeed devices will increase to nearly 120 different models across 30 different OEMs. This represents a significant growth on the small number of vehicles on the road using our silicon carbide devices today and demonstrates the opportunity ahead for us.

Speaker 2

As we continue to pioneer 200 millimeter silicon carbide and embark on our unprecedented greenfield capacity expansion plans, we maintain conviction in our strategy. It is exciting to see what is on the horizon and we look forward to continuing this promising momentum, particularly at Mohawk Valley throughout the second half of this fiscal year and beyond. I'll now turn it over to Neil, who will provide an overview of our financial results and our outlook. Neil?

Speaker 3

Thanks, Greg. Before I jump into the financial results for the quarter, I'd like to remind you all that during the Q2, we completed the sale of our RF business to MACOM. As such, all results reported below will be on a continuing operations basis and exclude the impact of RF in our results. We're very pleased that during the Q2 revenue, gross margins and EPS all came in at the high end of our stated guidance ranges for the 2nd straight quarter. We generated revenue of $208,000,000 for the quarter, a 5.6% increase sequentially and a nearly 20% increase year over year.

Speaker 3

During the quarter, we generated record power revenue of $108,000,000 driven largely by the $12,000,000 of contribution from Mohawk Valley and strong demand we see for our products. Looking at the power device revenue performance in more depth, We saw a sharp increase in EV revenue quarter over quarter, fueled by the additional EV device products shipping out of Mohawk Valley. However, this was partially offset by lower demand and persisted weakness in our industrial and energy markets, particularly in China and across Asia. We had yet another solid revenue performance for Materials above our guidance expectations. Materials benefited from an additional week of product shipments compared to the prior quarter and prior year, but also from continued strong manufacturing execution resulting in approximately 29% growth versus prior year.

Speaker 3

Non GAAP gross margin in the 2nd quarter was 16.4%, representing an 80 basis point improvement from the prior quarter, driven by increased revenues for Mohawk Valley and solid execution in our Materials business. Our gross margin includes $35,600,000 or approximately 1700 basis points of underutilization costs related to the ramp of Mohawk Valley in the 2nd quarter. As a result of the gross margin improvement, as well as tighter cost controls and higher interest income. Our non GAAP EPS of negative $0.55 surpassed our guidance. EPS, in addition to the underutilization costs mentioned above, also includes the impact of $10,500,000 of factory start up costs related to the construction of the JP and our materials expansion efforts.

Speaker 3

Before I get into guidance, a quick update on our balance sheet. We ended the quarter with over $2,600,000,000 of cash and liquidity on hand to support our ramp and growth plans. We expect to draw down the remaining $1,000,000,000 related to our RINESYS supply agreement in the first half of this year, which will build our cash position. DSO was 43 days, while inventory days on hand was 199 days. Free cash flow during the quarter was negative $755,000,000 comprised of $183,000,000 of negative operating cash flow and $572,000,000 of capital expenditures.

Speaker 3

As it relates to funding plans, given our strong cash and liquidity position, Our current focus is on government funding to further support our capacity expansion plans. We continue to have constructive discussions and correspondence with government authorities, including U. S. Chips Act officials. We are on track with all necessary incentive considerations and are targeting to have our full applications complete within this quarter.

Speaker 3

As always, we will continue to seek out ways to manage and optimize our balance sheet and capital structure. Moving on to our guidance for the Q3. We target revenue from continuing operations of 185,000,000 to $215,000,000 with a midpoint of $200,000,000 I think it would be helpful to break down the 200,000,000 dollar revenue midpoint guidance for modeling purposes. Revenue for power devices at the midpoint of our guidance will be relatively flat As increases in EV revenue supported by additional output for Mohawk Valley will largely be offset by lower industrial and energy revenue. Revenue from materials will be at our previously stated capacity range of $90,000,000 to $95,000,000 down from $101,000,000 in the prior quarter.

Speaker 3

As stated earlier, in Q2, materials revenue benefited from an additional week of shipments in combination with strong operating execution. Our production line is now balanced and at capacity. Therefore, we anticipate this being our materials capacity capabilities for the immediate future. This stated guidance would result in revenue growth in both Power Devices and Materials year over year. We are targeting $20,000,000 to $30,000,000 of revenue to come from Mohawk Valley next quarter, approximately doubling revenue at the midpoint.

Speaker 3

This will largely offset the decrease in revenue coming from the Durham top, which generates approximately $90,000,000 to $100,000,000 of quarterly revenue, but we'll be below that range this quarter due to the continued softness and uncertainty in the industrial energy markets in China and across Asia. The impact from the industrial and energy softness is expected to be persistent, at least until the second half of this calendar year. But as we said last quarter, much of the product we freighted to ship there has a notch elsewhere in our pipeline and we continue to work through that inventory now. Continuing with our Q3 guidance, we target non GAAP gross margins of 13% to 20% with a midpoint of 16.5%, driven by greater contribution from Mohawk Valley. At the midpoint, this includes $36,000,000 or 1800 basis points of underutilization related to the Mohawk Valley FAB.

Speaker 3

We target non GAAP operating expenses of approximately 109,000,000 inclusive of $13,000,000 of start up costs primarily related to the JP. We target Q3 net non operating expense of approximately $27,000,000 As I have mentioned previously, we expect non operating expenses to increase as the year progresses, as we earn less interest income on our short term investments in connection with our U. S. Capacity expansion plans. We target Q3 non GAAP net loss to be between $87,000,000 $71,000,000 Our Q3 targets are based on several factors that could affect them significantly, including supply chain dynamics, overall demand, product mix, factory productivity and the competitive environment.

Speaker 3

Before I hand the call back to Greg for closing remarks, I would like to remind you of a few data points pertaining to our facility ramps that may help with your modeling. First, while we are on track for 20% utilization at Mohawk Valley by the end of the June quarter, the full revenue benefit of $100,000,000 per quarter from that 20% utilization level would be realized in the December quarter. As we have said, there is roughly a 2 quarter lag between labor starts and revenue contribution. In addition, as Mohawk Valley's gas utilization increases, we will start to see incrementally less underutilization. However, as the JP moves towards being ready for production, we will see incrementally more startup costs, which hit different lines on our P and L.

Speaker 3

Once the JP Phase 1 construction is complete, those start up costs will come down and we will start to incur underutilization costs at the JP similar to what has occurred at Mohawk Valley. Now, I'll turn it back over to Greg.

Speaker 2

Thanks, Neil. While we remain confident there is a significant and long term demand for our products, we also understand that the silicon carbide marketplace will continue to evolve for the next several years. During transformative industry shifts, There will always be many twists and turns, but we believe we are uniquely positioned to leverage the deep domain expertise We have compiled over the last several decades into a clear advantage. Today, We are the world's largest producer of silicon carbide material. We have long term supply agreements With the major power device producers from around the globe, 4 of those customers signed an initial agreement with us several years ago, then expanded those agreements a few years ago and expanded once again more recently, 2 of which happened in the last 90 days.

Speaker 2

And this demonstrated ability to service and grow the silicon carbide materials market The last couple of years didn't go unnoticed as we secured what I believe to be is the largest capacity reservation deposit In the history of semiconductors, the $2,000,000,000 agreement with Renesas to supply 150 millimeter and 200 millimeter substrates beginning in 2025. We know from the more than 30 years of experience of working with this material That the significant ramp required to create high quality materials consistently at scale gives us a competitive advantage today and for the foreseeable future, especially as we begin producing 200 millimeter at the JP. The demand for silicon carbide remains significant, underscored by the 2 recent announced expansions of long term supply agreements with existing customers. We expect to remain an important partner to other silicon carbide device manufacturers through the end of this decade. And we believe our leadership in materials provides a strong foundation for us to continue to grow our device business.

Speaker 3

We're working

Speaker 2

closely across a diverse set of customers, which gives us good visibility into how the markets are evolving and where we can capitalize on the opportunity. Being the leader in silicon carbide, a truly transformative technology is no easy task And we are executing on this opportunity with efficiency, purposefulness and thoughtfulness. We look forward to bringing this vision into reality and generating long term value for all stakeholders. I'll now turn it back to the operator for

Operator

The first question is from the line of Brian Lee with Goldman Sachs. You may proceed. Hey,

Speaker 4

guys. Good afternoon. Thanks for taking the questions. I know you get asked this every quarter, but it sounds like the tone, the confidence, So the data points you're throwing out there, Greg, are as positive sounding as we heard about the internal operationals. So given Building 10, it seems like you're ahead of plan.

Speaker 4

What is the potential for Mohawk to maybe pull ahead in the ramp 20%. I know you're super confident in being able to hit it, but how do you potentially see upside to any of these medium term targets? I think you've talked about $100,000,000 of revenue from that facility by the December quarter. So are there still internal bottlenecks operationally keeping you from accelerating? Or is it a customer eval issue?

Speaker 4

Just wondering as you think about the upstream sort of not being as much of a limiting factor, how you could potentially maybe translate that moving Mohawk Valley a little bit faster. Thanks guys.

Speaker 2

Yes. Thanks a lot, Brian. So first off, the team has done the team up in Mohawk Valley Combined with several teams from Durham that have gone up to Mohawk Valley have done an incredible job of relieving bottlenecks and fine tuning the processes, etcetera. So I'm very pleased with the progress we're making, still have a lot to do, but obviously tripling the revenue and then doubling it again Next quarter is fantastic. We feel great about where we're at with Building 10.

Speaker 2

Obviously, now having an ability to support a greater ramp of 25% is fantastic as well. But as I said in the prepared remarks, we're going to keep the pace of the fab itself At the pace of 20% utilization in the June quarter, dollars 100,000,000 of revenue in the December quarter. We feel real good about that. But again, from a longer term perspective, ability to get more out of the facilities on the Durham campus in terms of supplying Mohawk Valley, It gives us really good confidence in being able to take that number up higher out in time.

Operator

Thank you. The next question is from the line of Samik Chatterjee with JPMorgan. You may proceed.

Speaker 5

Hi. Thanks for taking my question. I guess, Greg, you did mention the design in pipeline, which continues remain quite robust on the EV front. I was just wondering, I mean, what are you seeing change in terms of conversion of design wins to design wins, obviously, with The design ends picking up in pace and potentially the launch of these sort of vehicles also coming more closer. Are you seeing a bit of Any changes in the conversion rates of these design wins eventually?

Speaker 5

And just any color there you can share will be helpful. I have a quick follow-up after that. Thank you.

Speaker 2

Sure. Good question. So this past quarter, we had a record conversion of $2,900,000,000 to design win. That represented, as I mentioned, there's 28 different unique electric vehicle models that are in there and a whole bunch of other product as well, including a number of industrial and energy applications. So we're really happy and been very quite frankly, the design win conversion we just had is a stunning number of $2,900,000,000 So I feel real good about that conversion.

Speaker 2

And then the $2,100,000,000 of design in It gives us confidence that customers are still very excited about our technology and our capability.

Operator

Thank you. The next question is from the line of Jed Dorsheimer with William Blair. You may proceed.

Speaker 6

Hi, thanks for taking my question. I have one question and a follow-up. I guess for my question, Greg, if I look at today's announcement on the material agreement, it's identical to your December announcement that turned out to be Rome. So I'm wondering if you might be able to comment as I know that, That customer wasn't named in the previous, but you've since been able to comment on that and assuming the terms Are still the same? And then I have a follow-up question too.

Speaker 1

Jed, this is Tyler. Yes, we can confirm that today's announcement, the customer is Rome. And your follow-up?

Speaker 2

And I just might add, sorry, Just to add a couple of things. We have had a great long term relationship with them and we're very excited about this partnership with them going forward helping us convert the market to silicon carbide. In the prepared remarks, I did have one typo in there. We had 3 long term agreements that had original agreements, extensions and then further extensions and this was one of those.

Speaker 6

Great, Jeff. Well, congratulations. My follow-up question, so it's similar to what Brian asked you, but with a slight nuance. So if I look at what Building 10 is outputting in terms of wafer starts and what you're pulling down on that in Mohawk Valley. My calculation would be that you will have an inventory of wafers over $200,000,000 by June, assuming that $25,000,000 a midpoint and maybe a $50,000,000 to $60,000,000 or $55,000,000 in June, my estimates on that.

Speaker 6

So my question is, as you look through the rest of the year, clearly that gives you some Glide in terms of Siler City ramp from a buffer perspective. But what are the is it Missy kind of getting the second of kind tools, what are the gating factors as you think about moving around that utilization to debottleneck and capture either more or less in back half of this year or next?

Speaker 2

Yes. Thanks for the question, Jed. And I'll kind of talk first about my perspective on this and then hand it over to Neil. So you're exactly right that we are shipping out of the Durham facilities up to Mohawk Valley and obviously We have inventory building up there in anticipation of the ramp. So no question about that as we're trying to get ahead of things.

Speaker 2

So that's actually good news. And the way that we have the overhead track system and the storage up there, it makes it perfect for that situation, Number 1. Probably the more important aspect as it relates to buffering for the JP is the ability to ship up to 25% right now. We have very high confidence to 25% utilization out of the Durham campus. So that obviously gives us really good confidence.

Speaker 2

At this point, in the fab itself, about 75% of the tools have second of a kind tools and we anticipate that the vast majority of the tools will have second of a kind tools by the June quarter of this year. So that will help debottleneck things because if a tool goes down, It basically stops production if there's not a second of a kind tool. So that's kind of what's happening there. Maybe I'll hand it over to Neil if you want to add any Additional color?

Speaker 3

Yes. So I think Jed what that means then is no real change to the outlook right now. The key driver here as we just talked about is just ramping the revenue to $100,000,000 by December quarter coming out of Mohawk Valley. And clearly the inventory that we see coming out of Durham and Building gives us good strength and good confidence that we'll have an available number of substrates to drive that revenue through. So it'll really be about how quickly can we get that throughput through the fab and out to customers over that period.

Speaker 3

Now one other thing I'll mention is we also mentioned on the call here is, we should be able to see derm go from 20% to 25% equivalent utilization by December or towards the end of the year. So what that means is we'll be able to go above the $100,000,000 a quarter as you get out into kind of that March, June 2025 timeframe. So and then when the JP starts making meaningful substrate deliveries to Mohawk Valley, probably in the back half of calendar twenty twenty five, we should have a nice glide path of substrate to support us out through that period. So We feel like obviously the demand continues to remain strong based on the customers that we have in front of us. And it really just be about ramping, delivering substrates to the fab and continuing to drive productivity and output there.

Operator

Thank you. The next question is from the line of Gary Mobley with Wells Fargo. You may proceed.

Speaker 7

Hey guys, thanks for taking my question. I had just one multiport question. And I know most of the KPIs that you guys provide is on the device side, but in light of the 3 Look, the 2 year to date announcements on the weight materials, LTSAs And then as well with the Renaissance deal signed last year, maybe you can give us a sense of the backlog or maybe the Cumulative value of live LTSAs for the material side of the business. And the reason I'm asking is I'm just trying to get A sense of whether $95,000,000 a quarter on the material side of the business continues in perpetuity. And related to all this, maybe if you can give us a sense of what the gross margins are like for these recent LTSAs versus previous ones in light of maybe a more competitive environment out there?

Speaker 7

Thank you.

Speaker 2

Okay. Thanks a lot. So, a couple of things and thanks for the question. A couple of things. We do have 3 customers under long term agreements that did original agreements, extended and then extended again.

Speaker 2

And I don't know exactly what percentage of the number has been what the total number of those expansions are, I have that on me, but we most recently extended those agreements with all three of them. So you can kind of think of it, We have quite a bit of runway in front of us. We don't get into the details on that, but you can kind of think about a half a decade is kind of the zip code when we would do these kind of extensions, if you will. With regards to $95,000,000 that's certainly going to be the near term target that you should keep in mind. Where that will change when we start ramping the deliveries of 200 millimeter substrates to RENASYS out of the JP.

Speaker 2

That's when the capacity expansion hits in pretty full steam. In terms of demand for the product and I would say gross margin proxy for pricing, The demand for high quality wafers remains very, very high. We constantly have customers saying they would like to get more for us this quarter, next quarter, etcetera. So that's kind of a normal type thing. And I would say the pricing environment for Quality substrates is very favorable for us.

Speaker 3

Yes, let me just add to that. I think that from a margin perspective, I think what we've always said is from a material If you look at a long term goal of 50% margin for the overall business, the materials products are already in there, in that kind of that zip code, so to speak. So as you look out in time, these two agreements that we're signing certainly support that or even more, as you look out into the future.

Operator

Thank you. The next question is a follow-up from Samik Chatterjee with JPMorgan. You may proceed.

Speaker 5

Hey guys, thanks for taking the follow-up. I guess my follow-up was more on the industrial weakness that you're seeing and just trying to think about how to sort of Extrapolate back to thinking about the June quarter as well, you are indicating it takes you take a step down on Power Devices revenue relative That industrial weakness that you're seeing, but how are you thinking about how long that continues in terms of the weakness? Is there an incremental step down in relation to that weakness you're seeing based on your current visibility. Just trying to get a sense of as Mohawk ramps, how do we think about sort of the offsets to that? Thank you.

Speaker 2

Yes. So first off, industrial is definitely weak, as we had mentioned last quarter as well. And It is mainly driven by Asia and China, but it's weak across Europe and U. S. As well.

Speaker 2

And it's hard to tell when things are going to get better. But from a planning perspective, we're not anticipating it getting better this year, this calendar year. So we're just assuming it's going to be where it's at. Now the industrial business is a really good business for us And it will come back. And what we're doing in the meantime is we're ramping Mohawk Valley, which is Almost 100% targeted right now at automotive customers.

Speaker 2

So we will be ramping Mohawk Valley and driving that up. We're converting as much as practical out of Durham to supply for the automotive customers as well, but we are limited on the Durham footprint from that perspective. But the good news is eventually, and we've all seen the movie, the industrial business will pick back up. And when it does pick back up, we will largely be an automotive outfit out of Mohawk Valley and giving us room then in the Durham facility to continue ramping when the industrial business picks back up. And again, we've gotten a lot of design ins and a lot of design wins there.

Speaker 2

It will come back up. That's great business for us. We love the customers in that space and we'll have ability out of the Durham facilities to handle that.

Speaker 3

Yes. And Samik, let me just try and help out here from a modeling perspective a little bit. If you go look at just the 2Q revenue, we saw about a 30% increase in the EV related device kind of revenue. We'll see that again in 3Q, but that will be offset by weaker industrial energy revenue. You can think about about 15% decline, 2Q going into 3Q kind of at the midpoint.

Speaker 3

So from a modeling perspective, when we think about the Durham revenue, which primarily industrial and energy revenue. The capacity we've talked about is about $90,000,000 to $100,000,000 a quarter. Now that's going to be lower than that kind of moving forward. You can think about $80,000,000 to $85,000,000 of Durham based power device revenue coming out over the next several quarters. So if you put all of those pieces together, we talked about for modeling purposes, materials being in that kind of $90,000,000 to $95,000,000 range per quarter.

Speaker 3

The Durham fab, as I just said, in that kind of $80,000,000 to $85,000,000 range as long as the industrial and energy revenue continues to remain down at those levels. Again, as Greg said, it could come back at some point and likely will. But all of the growth essentially in the immediate term is really going to be from Mohawk Valley. So what you can think of is kind of Flattish on materials, flattish on the Durham output from a device perspective and growth from the $25,000,000 or so midpoint we just saw in the guidance we gave for 3Q, growing above that point as you move out into the future and towards $100,000,000 in the December quarter. So that's kind of the way I think about it over the next few quarters.

Operator

Thank you. The next question is from the line of Harsh Kumar with Piper Sandler. You may proceed.

Speaker 8

Yes. Hey, guys. Thanks for letting me ask the question. I actually had 2, one for Neil and one for Greg. Greg, the first one for you.

Speaker 8

We get this from a lot of customers where people say, okay, Mohawk is just getting going and it's going to be really good. But then you are also sort of tied to a German fab and that would be another project that you would take on. So I wanted to understand your level of commitment to getting into the German while you're still ramping Mohawk. And then Neil, I'll just go ahead and ask you my question as well. I wanted to understand the difference in cost, the underutilization cost from Mohawk Valley relative to the JPS Silicity costs for startup.

Speaker 8

And so is it not fair for me to think that the you would come out a little bit ahead as you get closer to the September December timeframe because the underutilization costs are significantly more than perhaps the startup costs at Silasity JP?

Speaker 2

Yes, Harsh, thanks for the question. We have received initial notification of funding for the IPSE process in Europe for the fab in Germany. There is still a considerable amount of work to be done before we begin construction, and that includes our European Chips Act application approval. There's regulatory filings around the world permitting a whole bunch of different things that need to happen. So I wouldn't anticipate that we would begin construction of that fab until calendar 2025.

Speaker 2

So in between now and then, our full focus is on Mohawk Valley, ramping that fab. I was up at the fab several times last quarter. I'll be up there again next week. And we've got we certainly have my full attention, the whole organization's attention on doing everything we can to ensure we have a great ramp of that fab. I would note a couple other things just really quickly before I turn it over to Neil.

Speaker 2

We had talked about a dozen or so parts that have qualified out of Mohawk Valley, including our biggest parts, most complicated part and so forth. The other thing to realize is all of these MOSFETs that I just talked about qualifying, They qualified 1st pass and that is not normal. You normally find something, some problem or you qualify with an asterisk saying you're going to put some kind of something in place to kind of make sure that The quality that we only ship quality products to customers, we qualified first pass on all those parts. And I think that gives us a huge boost of confidence and the underlying capability of this factory.

Speaker 3

Yes. So Harsh, maybe it's important for me just to break down the gross margin a little bit and some of the markers that we've had out there and kind of just give you a little bit of kind of my view in terms of what that means from an underutilization perspective. So we had a good quarter from a gross margin perspective above the midpoint of our guidance range. We've also seen strong underlying gross margin improvement excluding the underutilization over the last couple of quarters. In fact, if you go back to the June quarter until the guidance we just gave here in Q3, we've seen approximately 400 basis points of improvement of margin in just 3 quarters on an underlying basis.

Speaker 3

And in addition to that, I think we've seen the cost in the 200 millimeter substrate, the yields on those As well as the initial costs in Mohawk Valley on a unit basis, be very much in line with what we had anticipated. So as we always said, the more revenue we push through Mohawk Valley, the better we'll see or the faster we'll see that kind of that some of that gross margin execution. Now as you said previously there on the underutilization will be a little bit of a drag for us. We talked about $36,000,000 last quarter at Mohawk Valley, it'd be flattish and get up to a peak of about $38,000,000 as you get into Q4. So what that'll mean is kind of put a marker out there of about a 20% gross margin or approaching that in kind of the Q4 timeframe.

Speaker 3

You can think about that in the kind of mid to high teens probably exiting the year And then back maybe pushing that 20% or so out of quarter or so as we look out in time. So what that means is yes, we will start to see the underutilization kind of peak out there in the for period start to come down a bit. But just a reminder, those startup costs you mentioned in Siler City, those are currently on the OpEx line, about $10,000,000 last quarter that will probably grow to about $15,000,000 as we exit the year. As Siler City goes into production probably in the second half of fiscal 2025 that kind of first half of calendar twenty twenty five, we'll see those transition from underutilization up to the gross margin line. So a few moving pieces there to think about, As I mentioned in the prepared remarks, but the key here is underlying, we are seeing very strong performance and anticipate seeing that strong performance continue as we drive more volume through the scale facilities that we're building.

Operator

Thank you. The next question is from the line of Jack Egan with Charter Equity Research. You may proceed.

Speaker 2

Hey guys, thanks for taking the question. I just had one. I was curious why didn't either of the recent LTAs signed with Infineon and Rome Infineon and Rome include 200 millimeter because we've seen some other companies sign some wafer deals that have included 200 millimeter, Even if it's just a general long term aspiration to eventually move to 200. So I mean, wouldn't the JP at least eventually give you some capacity that you turnaround and sell to device materials customers by, I guess, 2026? Thanks a lot, Jack, for the question.

Speaker 2

And I would start off by saying, all of our long term supply agreement customers are asking about 200 millimeter. It's obviously front and center in their mind and something that they're very interested in engaging with us on. We've engaged so far we've announced the engagement so far of 1, which is the deal we did with RENASYS last year. And Just to recall, that begins shipping 200 millimeter in 2027. In between now and then, we've got all of our focus on Getting the JP up and running to feed the Mohawk Valley fab.

Speaker 2

Getting the 20% utilization in the June quarter got really good line of sight, but we're also going to have to ramp the JP to get the other 80% utilization. Now the one thing that I would tell you is we have a high degree of confidence our ability to do that, and I'll tell you why. In March of this past year, we turned on the Building 10 operation. We got certificates of occupancy and began producing wafers and pools and wafers out of that facility. And less than a year later, we're feeling very confident of taking what was A basketball court, a squash court, bunch of offices and converting it into a 200 millimeter silicon carbide crystal growth operation and being able to feed 25 percent of the world's largest 200 millimeter wafer fab.

Speaker 2

Well, all of that experience is going to be applied to the JP, which we purposely kept less than an hour's drive from our campus. And the reason we did that is we wanted the same people who ramped Building 10 to ramp the JP. And so now you're talking about a purpose built facility. We're not trying to work around what used to be an office and all the you can imagine all the challenges we've had converting that space to a crystal growth operation. We'll have none of that problem in the JP because it's built as Silicon Carbide crystal growth operation, so very, very confident about that.

Operator

Thank you. The next question is from the line of Joshua Buenkelter with TD Cowen. You may proceed.

Speaker 3

Hey guys, thanks for taking my question and actually a nice segue from your response to the previous question. I wanted to ask about sort of the timeline and slope of the JP's ramp. I guess any incremental color

Speaker 9

you can give us? I know you mentioned SOP in the by the end of

Speaker 3

the year and then it sounds like back half of calendar 'twenty five is a reasonable Time line for first power devices built on JP Wafers, but any incremental color should the slope look similar in Directionally as what went on in Building 10? Thank you.

Speaker 2

Yes. I think you have roughly the right kind of numbers there. And the only additional color I would add is what we said in our prepared remarks, which is We're going to be installing crystal growers in there next month. So the facility is ready for installation of Crystal growers, we're not going to energize them and produce wafers until the back half of this calendar year, but I think all of the timing that you just talked about feels pretty reasonable. And I would say at this point, the team's done a great job.

Speaker 2

That was a forest not too long ago and now is a giant crystal growth factory. And at this point, we're on schedule.

Operator

Thank you. The next question is from the line of Vivek Arya with Bank of America. You may proceed.

Speaker 9

Thank you. I actually got 2 questions. First, Neil, could you just repeat the gross margin outlook you gave for December? I think you gave the different moving parts. But if you could help kind of quantify what you see as gross margins heading into December.

Speaker 9

And then Greg, my question is, how do you handle situations where you are bidding for the same EV business that your materials customers are also bidding for?

Speaker 3

Yes. So first on the gross margin front, just if you think about number 1, in the current quarter, we're going to be about flattish, right around the 16.5%. And that's really based off of 2 things. 1 is, We'll have a drag of about 100 basis points just off the leverage of the underutilization just on the lower revenue. But underlying performance offsetting that by about 100 So continuing to see good execution as you think about the underlying ability to generate better costs and better margin profile.

Speaker 3

As we move out to the June quarter, I think previously we had talked kind of about a 20% marker. I think that moves out about a quarter. So June quarter, you're probably talking about kind of mid to high teens based on what we're looking at now as we start to push more product through Mohawk Valley. So really Mohawk Valley will start to generate not just more volume, As we push more product through there, we really like the cost structure and of course you get the benefit of the volume over that underutilization. The remainder of the year as you get out to December, you should see kind of a linear improvement, Vivek, in terms of margin beyond that.

Speaker 3

Like I said, out beyond June into September, pushing that 20% marker out of quarter to the September quarter. However, when the JP comes online from a production And think about that in that kind of March, June timeframe of 2025, those underutilization costs will then come out of OpEx and we'll need to put those into gross margin. We should be exiting the year, you're about $15,000,000 You could see it grow up to even $25,000,000 or so before it makes that move. So that's just something to consider from a modeling perspective As you get out beyond December and into the kind of March, June quarters of 2025 as we start to bring the JP online.

Speaker 2

And then, Vivek, in terms of the other question, I would say, number 1, our materials customers are exactly that. They are customers of ours. We treat them as such. We have quality meetings with them. We have typical quarterly program reviews and things like that.

Speaker 2

So we treat them as customers as they are definitely helping us Convert the power electronics market from silicon to silicon carbide. I can tell you that When I joined the company 6 years ago or so, I believe there was one OEM that was committed to using silicon carbide in an inverter. And of course, that was Tesla. Today, I don't know every single OEM, but I actually can't name an OEM that isn't using silicon carbide. Maybe not across their entire but they're using silicon carbide in some of their models.

Speaker 2

I can't name one that's not. So there probably is, I'm not aware of, but I can't tell you who that is. So I think that's what that shows is a pretty dramatic increase and the appetite for silicon carbide across all of our materials customers and ourselves. Maybe one thing that I'll note is on the 28 models that I had mentioned that are transitioning from design in to design win, We can confirm that we are the prime source on 27 of those 28. I think we're the prime source on the 28, but I can't confirm that one.

Speaker 2

So I think it's an exciting opportunity for us. It's an amazing amount of things that are going on. I think there's going to be a lot of Puts and takes in the EV industry over the coming couple of years. This is the biggest transformation in the history of the automobile industry.

Speaker 5

It's going to be the

Speaker 2

most disruptive in the history of the It's going to be the most disruptive in the history of the automobile. And we feel like we're at the early stage of that transition.

Operator

Thank you. There are no further questions in queue. With that, I'd like to turn the call over Greg Loake, CEO for concluding remarks.

Speaker 2

Well, thanks everybody for being a part of this call today. We look forward to chatting with you in our next earnings call. Thank you very much.

Operator

That concludes today's conference call.