T-Mobile US Q4 2023 Earnings Call Transcript

There are 14 speakers on the call.

Operator

Good morning. My name is Julie, and I will be your conference operator today. Thank you. Mr. Amar Aljandi, you may begin your conference.

Speaker 1

Thank you, operator, and good morning, everyone. First, let me say thank you again for joining us this morning. It's always great to have our owners and our friends and analysts joining us. This morning in particular, my colleagues and I are excited to talk to you about our 4th quarter and full year results. The results, as you will hear, are very strong.

Speaker 1

But while these results are strong and we're going to talk about them, we're more excited to talk about our future, not just our guidance for 2024 and 2025 and 2026, but the next several years. And importantly, we'll talk a little bit about some of the key projects that will propel Agnico Eagle forward. It will propel us forward by delivering more value per share at mines that importantly we already operate in regions we've been in for decades and with people and teams already in place. We'll go through a number of slides this morning and you'll hear from a number of our most senior executives about the business and how it's going. But really the message we want to leave with you is a simple message.

Speaker 1

It's a message of stability, consistency and of quality, quality of the projects, quality of the assets and the quality of our people. It's a message hopefully that you'll walk away thinking and appreciating that Agnico has built a unique position in this industry. With some of the largest longest life gold mines in the world, operating in the safest jurisdictions with great exploration potential, continuing great exploration potential, great operating results and great projects. It's a company with 66 year history of fiscal prudence, capital discipline and per share focus. Before I jump in, I would suggest and note that there are forward looking statements.

Speaker 1

And if I might ask, operator, if we can jump to Slide 5. Perfect. Thank you. So in discussing our 4th quarter and full year 2023 highlights, so for 2023 highlights and full year, 4 important milestones and achievements. 1, record gold production, best ever in the quarter, best ever for a full year.

Speaker 1

That's impressive for any company. It's especially impressive, I think, for a company that's been around for 66 years. 2, record cash from operations, best ever in a quarter, best ever in a year. 3, record mineral reserves up 10% to almost 54,000,000 ounces. So it shows not only are the operations doing well, but the reinvestment into the business and into the future is doing well.

Speaker 1

And then 4, most proud of all, the best annual safety performance in the company's history. I've had the pleasure of talking about solid safety performance on a number of these calls. You know we're passionate about it. I'll say it again, there's nothing more important, nothing more important than keeping our people safe, our community safe and the environment safe. And I want to say a special thank you to all of our employees who are listening in, not only for taking the responsibility to keep yourself safe, but the responsibility to keep your colleagues and coworkers safe.

Speaker 1

And then we'll also talk about the future. We'll talk about our guidance, solid 3 year production guidance with industry leading costs. And we're going to talk about again, we're most excited about the projects that we have in place that we think will add significant value and we'll talk about some of the guidance that we're going to give more clarity on that towards the middle of the year. Next page please. So these results, which we're very proud of, are clearly a function of the assets we have, but really none of this could happen without the quality of the people that we have.

Speaker 1

We talked about safety. It's impressive enough on its own, a 35% reduction versus what were already aggressive targets. But really interesting is that every single operation, everyone met or exceeded their safety targets last year. It's also about an engaged workforce, a happy workforce. In 2023, we continue to improve the results of internal surveys with regards to employee satisfaction.

Speaker 1

We had 80% of employees fill out the survey, that's exceptional. And almost 80% of our employees said Agnico Eagle was a great place to work, not a good place to work, a great place to work. Agnico Eagle was recognized in Forbes list of Canada's 50 best employers. We're doing more training. We have more indigenous employees and colleagues and we have lower turnover.

Speaker 1

It's not just the assets, not just the regions, it's the people that we think give Agnico Eagle a tangible competitive example. And I'll give you one of my favorite real life examples of Agnico. When you go underground at Agnico and you're talking to a young capable person and they tell you that their uncle and father worked at Agnico and they tell you that one of their grandparents worked at Agnico, you don't get that everywhere. Next page, please. So looking forward, 2024 to 2026 production outlook, really two words, steady, reliable.

Speaker 1

Our guidance for 2024 is exactly what we said it would be. Our cost guidance between 875 to 925 percent is up a little bit from what we were able to do in 2023, but it's only 4%. And we're hoping to, just like we did in 2023, do the best we can, and we have a track record of being able to do that. Our 2025 guidance remains the same at 3,400,000 to 3,600,000 ounces, same guidance that we gave last year and 2026 shows steady production. Again, steady, again reliable.

Speaker 1

Next slide please. So I've got 2 more slides. So this page, I want to talk about where we are on the consolidation of our Abitibi platform, including not only 2 of the world's 10 largest 2 of the 10 largest gold mines in the world with Detour and Malartic, but also where we are on consolidating sort of the Cadillac fault and Upper Beaver and Wasamac and Amalgamated Kirkland, etcetera. At Detour Lake, and Natasha will go through this in more detail, it is already, while competing frankly with Malartic to be the largest gold mine in Canada. It's good.

Speaker 1

We've got both of them competing with each other. Mine life past 2,050, it is a great ore body. Guy will talk about the exploration success we've continued to have. Natasha will talk about how we take advantage of that by increasing the mill, by looking at underground. And we are aiming to provide more specific guidance by mid year.

Speaker 1

And that guidance really is going to be about what's the next step. And the next step, if all goes well, and we're still doing our analysis, would be what you would expect, potentially looking to put in exploration ramps to be able to possibly take some bulk samples, confirm great continuity, confirm ground conditions, the kind of things that you would expect a professional mine company to do when they have such a great asset as that. With Canadian Malartic, Dominic will talk about that. Three items there. 1, continue to focus on building and optimizing the underground, putting in the shaft, how the mining is going.

Speaker 1

Dominic will talk about we're ahead of schedule on development. We're getting positive tonnage reconciliation with the internal zones. Everything is going well. But Dominic will also talk a little bit about where we are early, but where we are on looking at the 2nd shaft and 3, the work that we're doing to look at filling the mill as mill capacity becomes available later this decade. And the 3rd item that you see at the bottom of this page is something actually we're really quite proud of.

Speaker 1

And I'm going to start with probably the smallest one, Amalgamated Kirkland and Near Surface. So Amalgamated Kirkland, the reason we're particularly proud to talk about that is if you go back 2 years when we did the merger and we talked about synergies and we all know that we have delivered roughly double the G and A synergies that we talked about. What we specifically talked about some low hanging fruit including Amalgamated Kirkland and we said look this is within tens of meters from existing Macassa infrastructure. If we can access that at very low capital and produce maybe 25,000 or 40000 ounces a year, that's just a simple example of how you create value through synergies and through consolidation. I'm proud to say that it's already now amalgamated Kirkland and near surface.

Speaker 1

It's in our mine plan. There's going to be 19,000 ounces in 2024, 35,000 ounces in 2025, 50,000 ounces in 2026. Again, I'm going back 2 years, but we promised you we would talk about that and deliver and it's a pleasure to be able to point that out. At Upper Beaver, it's a long life high quality asset, very low cost. We're continuing to do the work there.

Speaker 1

We will be giving an update towards the mid year. And again, it will be about next steps. Do we put in an exploration ramp or an exploration shaft to continue to move that project forward? Again, we'll give guidance towards the middle of the year. And then Wassa Mac, we're making progress on that.

Speaker 1

I think most of you know that when we acquired the Canadian assets of Yamana, really we were primarily focused naturally on Malartic and Wassimac, good asset, but we weren't convinced that the plan that Yamana had would meet our hurdle rates. I'm pleased to say that the work we're doing and our engineers have done something kind of unique in the gold mining space. They've looked at a smaller project that gets a better return on capital. And so we've made some progress on that. We'll give more guidance.

Speaker 1

That's probably something in early 2025 that we would talk about. But again, making good progress on that. Next page, please. And then Nunavut, very proud of the team at Meadowbank, added 500,000 ounces of production, extended the mine life for 2 years. Dominic is excited about extending it further, but we're not going to talk about that right now.

Speaker 1

This is a mine that's got infrastructure in place, low risk, very well done by the team. And then Hope Guy will talk about some of the exploration results that are very promising there. And so before I turn it over at a very high level, very proud of the team for the results in 2023, solid guidance and good progress on some excellent projects leveraging off existing infrastructure in places we're already comfortable with. And with that, I'll turn it over to our CFO, Jamie Porter.

Speaker 2

Thank you, Amar, and good morning, everyone. As Amar mentioned, 2023 was a record year on a number of fronts. We had the safest year in the company's 66 year history and record quarterly and full year gold production. This excellent safety and operating performance led to very strong financial results. We generated an operating margin of $979,000,000 in the 4th quarter, which was driven by our 2 largest mines Detour and Canadian Malartic.

Speaker 2

Gold production in the 4th quarter was a new quarterly record at 903,000 ounces and for the full year we hit the very top end of our production guidance of 3,440,000 ounces. We were also very pleased to report that we achieved our cost guidance with our total cash cost for the year coming in at the exact midpoint of our guidance of $8.65 per ounce and our all in sustaining costs of $11.79 per ounce well within our guided range. We are proud of the work our teams have done on controlling costs and what's been an inflationary environment over the past several years and on the team's focus on continuous improvement. A tangible example of this focus on cost is in Nunavut, where cost optimization efforts are driving costs lower by about $100 an ounce in 2024. This has helped enable us to extend the life of the Amaruq deposit as Mar just alluded to from 2026 to 2028 adding 500,000 ounces of production.

Speaker 2

If we move on to Slide 12, We look at our financial highlights. Record gold production drove record operating cash flow for both the Q4 and the full year. While we recorded a net loss per share of $0.77 in the 4th quarter, this was driven by non cash impairment charges related to Macassa and Pinos Altos. On an adjusted basis, net income per share was $0.57 in the 4th quarter, which represents a 50% increase relative to the prior year period. I want to briefly touch on the impairment charges that were recorded in the quarter.

Speaker 2

Macassa, we recognized a net of tax impairment charge of approximately $600,000,000 primarily reflecting the write down of goodwill that was recognized at the time of acquisition back in early 2022. Macassa had an excellent performance in 2023 in terms of production, cost control and reserve replacement and this is a mine that has produced over 6,000,000 ounces in its 100 year history. We see tremendous exploration upside. We see production increasing by 50% over the next 3 years and the potential to continue to replace reserves for years to come. However, we are not able to recognize all of this value in an impairment model.

Speaker 2

And this combined with higher costs and capital estimates that were assumed back in 2022 led to the impairment charge. At Pinos Altos, we recognized a net of tax impairment charge of approximately $70,000,000 reflecting higher expected operating capital costs in part related to the strength in the Mexican pace over the last year. Despite these accounting charges, the business remains very strong. We generated a record $300,000,000 of free cash flow in the 4th quarter and that's after investing nearly $500,000,000 in capital and exploration spending. We continue to pay a strong quarterly dividend and repaid $100,000,000 of debt in the quarter.

Speaker 2

For the full 2023 year, we generated $947,000,000 of free cash flow, declared dividends of approximately $800,000,000 dollars and continue to demonstrate our commitment to delivering strong returns to shareholders. At current gold prices, we expect to continue to reinvest approximately 2 thirds of our cash flow into sustaining and growing our business, exploring to find more ounces and 1 third of our cash flow into delivering returns to shareholders and continuing to strengthen our balance sheet. We move on to Slide 13. I'm pleased to report that we were able to continue to strengthen our balance sheet in the 4th quarter. We repaid the outstanding balance on our credit facility and reduced our net debt position to approximately $1,500,000,000 dollars We've also recently significantly improved our overall liquidity.

Speaker 2

Earlier this week, we closed a new upsized revolving credit facility in the amount of 2,000,000,000 dollars This new facility reflects Agnico's size and scale and investment grade status. It provides us with additional financial flexibility and we were very pleased to have had strong support from our many banking partners. We do have increased debt maturities in 2025 and we'll look to refinance or repay those from excess cash at the appropriate time. Overall, the balance sheet remains very strong and we're constantly working to make it stronger, improving our liquidity and overall financial flexibility. With that, I'll turn the call over to Dom, who will provide an overview of our Quebec and Nunavut operations.

Speaker 3

Thank you, Jimmy. Good morning, everyone. So in the coming slide, I'm going to cover the 2 regions in Canada on my side, Quebec and Nunavut and Natacha will follow with the other regions. But maybe before going to those highlights, Amor, I would just like to add something or to build on what you mentioned about why and why I think why we're in that position right now. Is the aspect of the people, there is the aspect of the region where we are, but there is also a secret ingredient.

Speaker 3

It's a bit personal, but I strongly believe in that, which is the how we do stuff. How we work all together here at the corporate office with Natasha, Jamie, under your leadership Amor, Carol, Jean and Guy, I think this is what makes the difference. This is what I felt when I started in 1998 at La Ronde and again 26 years after under your leadership, Amor, this is what we're doing. And when you go outside, you still feel that. Same thing where we're in Toronto office, we work together.

Speaker 3

And this is why the result we are today here they're talking by themselves. So on that, I will move to the Quebec region. So we produce over 1,000,000 ounces at a cash cost of €850,000,000 generating an operating margin of over €1,000,000,000 So I'm very proud and thank you for the team to control the costs and to continue to optimize the business and to leverage on all the synergy. So Quebec is a well established platform and you're going to see in the coming slide, this is just the beginning. We're going to keep growing that one.

Speaker 3

When you think about that within 100 kilometer, we have 3 mines and a very enormous geological potential. Maybe before going to the Odyssey project, I'd just like to highlight that Canadian Malartic is going to be the biggest mine in Canada in 2024. Natasha, you're going to win the biggest open pit, but we Kennedi Malartic is going to be back the 1st biggest mine. And in the coming slide, you're going to see we're going to move to have the biggest underground mine and maybe with Phase 2 potentially the biggest mine again. But let's talk about that.

Speaker 3

Next slide. So the Odyssey project, it is the Phase 1 of the underground. We lend out the study, which is 20 years life of mine at 5.50 ounces per year. This is the PA that we released. And more recently, we update the PFS where we are going to turn 5,200,000 ounces into reserve.

Speaker 3

The highlight of the project, Odyssey South ramp up is going well. I would say it's done. We're right now producing 3 1,500 tonnes per day, which is going to bring approximately 80 ounces per year in the coming 2 years. You could see on the map the ramp. So we're going to reach the top of the Iles Goudi deposit, which is the red zone.

Speaker 3

We're going to be there in a couple of weeks. And the team is now looking for opportunity. How could we start to mine that zone at the top and to bring ounces potentially in 2026. So we don't have the clear detail yet, but the team are working on that. Amor mentioned about that we are in advance on the ramp and one of the reason of that again is back to the synergy and how we were able to transfer the knowledge and to be fast on the automation.

Speaker 3

So right now during the shift, during the crew change, we are able to operate remotely the mine from the surfaces and this is giving us between 10% 20% improvement. That was not into the plan and this is why we're better than the plan. Other good news, the internal zone, which is in between the Odyssey South at the top and the Odyssey North at the bottom, in the purplish color, we still see some upside coming from those zones and more tonnes at the same grade. So that's a good news. It is very I understand it is very complicated to bring them into the model.

Speaker 3

We're trying, but again, it's a good news for operation. When we're there, there's more than the model. On the shaft thinking, we saw very great improvement December, January. So congratulations to the team. We're heading in the right direction.

Speaker 3

And the surface construction, 65% completed. Before I'm going to the next slide, which is I'm going to talk more about Phase 2 of Odyssey, I'd just like to highlight on that one. On this one, we see we're looking west and you see 2 zones. The East Godi zone, which is in the sediment deposit and there is the Odyssey South North, which is at the border between the Sedimental Rock and the volcanic rock. But there is another one more on the north, which is at the contact of the volcanic and other type of rock.

Speaker 3

So I stole a slide from Guy's presentation because I'm excited about. So I would talk about it and if you have questions, he could help me. But next slide, you could see now we're looking north. On that slide in the middle, right in the middle you see the East Goldie. The orange part is what we transferred to reserve, the 5,200,000 ounces.

Speaker 3

So this zone continue to increase as we are in filling it and doing more drilling. So this is one part that could be Phase 2. If we continue to grow that reserve and potentially have a second shaft close to that one and bring more tonnes to the mill, that's an option. There is no clear view or clear plan at this stage because we need to continue to drill, but the team is already planning where that shaft is going to be and planning all the infrastructure that we need to build to make sure that we're going to have a good room, a good spot for that shaft. More to come, but we still need to continue to drill.

Speaker 3

But also exciting, if we step out a bit, you could see the 16.5 kilometer strike length that we have. Now we're again, we're locating north and there's 3 zones, mineral horizon in that. There is the Odyssey sorry, the East Goudi in our range. In the middle at approximately 600, 700 meters, there is the Odyssey South. And you could see on the right also the purple one.

Speaker 3

That zone continue, I don't know, 5 kilometers on the west. And there's another zone, which was the Malartic gold field mine in the past, which is also there. So there is currently no drilling occurring there, but we're going to come back, I would say, in the next 2 years, we're looking to have an aggressive plan to drill that. And this could be a game changer to bring if we find something to bring answers to Canadian Malartic. So back in the days, the Goldfield mine have mined 9,000,000 tonnes at 6 grams per tonne, 1,700,000 ounces.

Speaker 3

That was in 1939, 1965. So now we're going to come back there, we're going to drill around that and see if we could bring something into the plan. Next slide. So for the Nunavut business, again, great work to the team. And I would just like also to highlight Martin Clante's work is here with us in the room.

Speaker 3

He did very good work to optimize at Meliadine and at Meadowbank to improve the productivity and cost And this allowed us to look to expand Meadowbank. It's part of that to be more efficient. So we added 500,000 ounces into the plan for ounces coming in 2026, 2027, 2028. Those ounces are coming from better reconciliation, which is involved more tons, a pushback at the IVR pit and also more mining from underground. He is going to talk more about that one.

Speaker 3

And maybe the other aspect is the Meliadine, we're doing currently the Phase 2 construction. You see the Meliadine picture in the middle. This is going on budget, on time. This is a good news. And the vision here in Nunavut is to maintain a platform of 800,000 ounces.

Speaker 3

This is what we produced if you look to the full year 2023. In 2024, we're going to bring that around more 860 1,000 ounces with more ounces coming from Meadowbank. As we mentioned in the past, more deep we go into the open pit, the grade is higher and the under supplemented with the underground mine or higher grade ore, this is where the answers are going to come. But Mediobanca, we see it ending now in 2028. That's a very good news.

Speaker 3

We continue to work to expand that. This is the first goal and what could in my mind be very, very interesting. Guy is going to talk about something we see also at Amaruq. But the other project that is coming into play is the Hopi 1. And again, I will let Guillemot talk about what we see.

Speaker 3

This Nunavut is high risk region, but it's also a high reward region. And on the risk side, I need to say I'm very comfortable because we're mining there since 17 years. We've built Meliadine, 1,200,000 project. We did it on cost months in advance. And now we're doing Phase 2 of Meliadine at a time which is not easy and we're still on time and on cost.

Speaker 3

So I'm confident that the team is going to work on a study at AMROQ which is going to be a solid one and it's going to fly. So on that, I will now pass it to Natasha, who will discuss the remaining of the business.

Speaker 4

Perfect. Thanks, Tom, and good morning, everyone. I'll start with the operations in Ontario. We had a strong year and solid performance at both of our operations. As you can see on the slide, we generated over $1,000,000,000 in operating margins in 2023 with industry leading costs.

Speaker 4

Now at both of our operations, Macassa and Detour, we're focused. We're constantly focused on optimizing our assets through a number of continuous improvement initiatives. It's just part of their DNA. And I'll give you a few examples of that. And I'll start with Macassa.

Speaker 4

So one of the big initiatives here at Macassa are the productivity gains that we were able to sustain in 2023. We first started that with the commissioning of number 4 shaft and then later in the year we upgraded the ventilation system. And these gains together have resulted in a production in production coming up just above the top end of guidance. So congratulations to the team on that. Now in terms of creating further value at Macassa, we have now integrated the 8 ks and the near surface deposits into the production profile.

Speaker 4

And as Amar mentioned at the time of the merger, we identified 8 ks as a near term opportunity to surface value. And so again, here we're very, very proud of the team for the work that they've done to realize this potential. Now just staying in the Kirkland Lake area for a minute, I just wanted to touch on Upper Beaver. There's an internal assessment that's underway and it's considering either an exploration shaft or an exploration ramp to further convert and also explore the deeper portions of the deposit. Now moving to Detour, as I've mentioned before, this site has a track record of delivering on improvement initiatives.

Speaker 4

Our current focus, as you know, is the continuing it's continuing to advance the mill optimization efforts. We now expect to reach the mill throughput rate of 28,000,000 tonnes a year later in the second half of this year, twenty twenty four, which, again, I'm very, very proud of the team to be able to say this is 1 year, 1 year earlier than anticipated. In addition to that, we also believe that we have a better understanding of the potential to reach a mill throughput of now 29,000,000 tonnes a year. And we believe that we can do this in a time line that could be as early as the end of 2026. And now and we'll continue to work on this, but we're also looking to do better.

Speaker 4

And Amar mentioned it, but we're and we're in the early stages of it, but we're evaluating the potential to go beyond 29,000,000 tonnes a year. That could be at 30,000,000 that could be at 32,000,000 tonnes a year. Now just touching on the detour underground study, it's advancing and we'll provide an update later on in the year. Now moving to the next slide, Slide 19. I followed Dom's queue and I swiped a slide from Guy, sorry Guy, But it's a good slide.

Speaker 4

It provides a little bit more color on the ongoing exploration efforts at Detour. So at the end of this year, we declared an initial underground inferred resource of close to 22,000,000 tonnes at an average grade of 2.23. So it totals about 1,560,000 ounces. And on the image below, you can see where that resource sits. It's a darker bluish gray, maybe greenish, which is just below and to the west of the blue resource pit shell.

Speaker 4

This is the area that we're currently evaluating in the underground study. It's the darker blue area, but also the resource as a whole. On the lower image, you can also see, barely see a purple line, a faint purple line and that is the potential location of an exploration ramp to get closer to the resource and be in a pretty good position to better define it. And then over and above that, we are still making progress outside that resource area. We're continuing to drill the western part and we see a cluster of good drill holes, about 900 meters or so west of the resource pit.

Speaker 4

Now moving on to the on to Slide 20. I'll touch on the other assets very quickly, starting with Finland. Here at Cutila, the operating permit was restored to 2,000,000 tonnes a year at the end of October 2023. And now having completed the mill expansion, the shaft project, the environmental upgrades, the mine is realizing its potential and generating strong cash flows. We're also seeing some positive sorry, positive exploration results extending the deposit not just at depth, but also near surface.

Speaker 4

Now moving to Australia, Fosterville, it continues to generate strong cash flow despite decreasing grades. The team is working on securing a long term production level of somewhere in the range of 175,000 to 200,000 ounces per year and we'll expect to have preliminary results of that later on this year. Not too long ago, Fosterville was a site that generated before exploration expenditures that generated close to A1 $1,000,000,000 in cash flow a year for 3 consecutive years. So yes, we believe in the site, we believe in our team there, we believe in the exploration potential to find the next high grade deposit and Guy will discuss that later on in the presentation. Lastly, Mexico.

Speaker 4

La India successfully and sadly completed mining activities in Q4 2023 is now producing some of the residual leaching activities this year. Pinos Altos, it's a mature site with stable production and a great team and our efforts are transitioning more and more now to the San Nicolas project. And then just before I pass the call over to Guy, I just want to echo what Amar said and what Dom said. We just want to commend the sites, all the operating sites for an incredible year. There were many challenges that we encountered, but we overcame them as a team.

Speaker 4

We overcame them safely. So thank you for your hard work. Thank you for your commitment to continually strive for improvements in all aspects of our business. So with that, I'll pass it over to Guy.

Speaker 5

Thank you, Natasha. Good morning, everybody. Starting with the year end reserve and resources statement at Page 21, it's been a very good year in terms of mineral reserve replacement. You can see the building block highlighted the different categories on the upper left hand corner of that slide. But more and more importantly, like mentioned by Amar in the introduction comment, increasing the number of mineral reserves per share again.

Speaker 5

So we've been successful doing it adding this year 10%, so 5,000,000 ounces addition to the reserve seeing resources being stable in the measured and indicated category and growing in for by 26% year over year. We've been adjusting our gold price assumption to $1400 but that was mostly to reflect on the long term structure cost of our business and none of that resulted in a lowering of the cutoff grade. As a matter of fact, the grade our reserves are 2% up year over year. So we're not only adding reserve, we're also improving the quality with a grade that is higher. And you can also see in the lower left corner, the waterfall that explain the various block from mining depletion, addition of East Goldie with 5,170,000 ounces, the acquisition of the other half of Canadian Malartic and our percent interest in San Nicolas plus the contribution of each of the other mine that is well illustrated in that waterfall price.

Speaker 5

Moving to specific project like mentioned by Natasha, it's been a great year in Macassa and a great year from a production standpoint and a very great year in terms of reserve replacement and addition. So not only we managed to replace the 235 1,000 ounces that were mined in situ, but on the top of that, we've added an additional 224. So there's been a significant net growth of the total mineral reserve at Macassa and very pleased to see the evolution at the AK zone closer to surface. Not only the reserve mineral reserve have grown to 160,000 ounces in that shallow portion of the deposit, but the grade is significantly up compared to last year. Now we are having 160,000 ounces at 6.7 gram and whereas last year our first estimate was 5.2.

Speaker 5

So good quality, relatively high grade ore to very close to surface that will provide a lot of optionality as well described both by Amar and Natasha. Moving on Slide 23, Ameroque, just to pile on what Dominique mentioned. It's been a great year from an operation standpoint that the metric we've seen from cost and production were outstanding and we continue to see the benefit of a very positive reconciliation. So as we're entering into the central portion of the deposit, we continue to see this year 22% more ounces than predicted by our block model. We've managed to integrate some of that into our assumption, adjusting the model, adjusting some of the capping parameter, which is a component of the extension of the life of mine.

Speaker 5

And as we are also adding time and extending the life of mine, we continue to investigate at depth where the deposit remains open. And we continue to be quite pleased with some good results as now reaching close to kilometer below surface with some great good high grade hit with good thickness. So opening up some opportunity to further extend the life of mine above and beyond what we are mentioning. Moving to Slide 24, atobe Bay, the focus shift from investigating Doris last in 2022 to investigating in the Madrid area And very an area that we'd like when we were evaluating the project is that extension of Madrid towards the south in the 7. And we continue to see excellent result, one of the best draw hole that we've ever seen on the project, 16.3 gram over 28 meter at not even 400meter below surface.

Speaker 5

That area is not yield drilled tight enough to make it infer resources and it but it is exactly what we are currently addressing and filling that area. And we've been aggressively ramping up drilling quickly after New Year when the high sicknesses was good enough so that we can safely re access that portion under the from ice based drilling. And we are aggressively drilling in that area that we think will move the needle to bring the project to a successful decision in the future. And last but not least moving to Fosterville on Page 25. We've seen through the year a continuation of good result in the Robbin's Hill area and now to a certain extent as well in the Lower Phoenix and within the Cardinal fleet.

Speaker 5

That led to a complete replacement of reserves. Obviously, the grade as was discussed is going down because we are completing the depletion of the Swan Zone. But we were quite pleased to see a full replacement with the reserves that now stand at around 6.1 gram. And we are currently working to adjust the mine plan with the idea of optimizing the production profile of the operation with that 6 gram per ton material. And on that, I will return back to Amar for some closing remarks.

Speaker 1

Well, thank you everyone and we've covered a lot, but I'll just finish on the next slide please on what we're all about. We are trying to build a high quality business. We think there's a lot of opportunity. We don't care about absolute size. We care about value and value per share for our shareholders and doing it the right way in the communities we operate.

Speaker 1

We want a low risk business in the best jurisdictions. We define the best jurisdictions at least for Agnico Eagle as having the best geologic potential for multiple mines and having the political stability to operate multiple mines and to keep things simple. We want to focus on quality for us includes the best ESG that we can possibly do. Not only is it the right thing to do, but it's an essential thing to do. If your strategy is, I want to be in a region for multiple decades and build multiple mines, you better be welcome in that region and you better treat the people and the communities and the environment the right way.

Speaker 1

We want to continue to have disciplined capital investment and disciplined capital investment is largely about knowledge. And so when we make investments, we like to do them in areas we know with partners that we know, with teams that we know. We think we are uniquely positioned in the industry. We're in good regions that have multiple decades, in some cases, century of proven mineral potential. We produce more gold in Canada than the next 8 companies combined that gives us the advantages you would expect from that.

Speaker 1

And we have unique mining experience in Nunavut. And then finally and importantly, we've always been a company that has focused on fiscal conservatism, we focus on per share metrics, we focus on optimizing cash flow and we focus on trying to get the best return, the best risk adjusted return on capital by leveraging existing assets where we can. And I think what you've heard this morning is there's an abundance of opportunity to do that. So with that, operator, thank you and I'll we'll turn it over to questions.

Operator

Thank Your first question comes from Josh Wolfson from RBC Capital Markets. Please go ahead.

Speaker 6

Thank you very much. First question I had was on Amaruq and the mine life extension. It looks like the reserves didn't really change here aside from depletion. And I'm wondering, was this an adjustment to the existing mine plan? Or what's sort of behind the extension there?

Speaker 6

And I think the $500,000 answers that were defined as sort of being added to it. Thanks.

Speaker 5

Yes. If you do the math, you remove what we mined last year and with the addition of the high grading, we've seen the positive reconciliation that contributes to a portion of those ounces addition. So we did not completely deplete what was mined and that extension of 500,000 ounces was completed after the reserve exercise. So some of those ounces may show up while we're going to be doing the next reserve update. And some of them are also, I would say, slightly lower grade material that still will generate a lot of cash flow, but maybe that won't not all meet the trigger to become reserve.

Speaker 6

Okay, got it. So it's not reflected in the reserve. Maybe perhaps along the same lines, the Detour initial underground resource at 1,500,000 ounces. I'm assuming there's a larger opportunity here. I guess I'm just wondering is this resource going to be the basis for the June update or should we expect the potential for additional drilling or resource update with that release?

Speaker 5

Well, there will be a few aspects to answer your question. That as you saw is resources that we've declared is outside of the resource pit. What we're going to be providing you with some more clarity is on that blue, let's say, resources pit. So this year, we've basically haven't touched for the year end reserve and resources statement. We haven't touched the reserve pit and the resources pit.

Speaker 5

We just provide some clarity on what's out side of the pit. What we're going to be aiming to provide is some more clarity on the trade off between what's in the resources pit, the light blue or what could be mined by underground more profitably into the underground plan we're thinking about.

Speaker 6

Okay, got it. And then final one just on San Nicolas, following some of the comments we've seen out of Mexico on open pit mining, should we still think about that kind of 2027 timeframe as a target for production or is that likely going to be deferred a bit? Thank you.

Speaker 1

Hi, Josh. It's Amar here. There's an election coming up very soon. There's an election coming up very soon. And so it's our view is the whole thing is in flux.

Speaker 1

And I'll just give you an example. In theory, if there's no open pit mining that also applies to aggregates. So you can't mine for gravel, you can't mine for sand. That means you can't build roads, you can't build buildings. So it's not unusual to sort of see these things just before an election.

Speaker 1

We have very good relationships with the governments and we're optimistic that the mining industry is a big industry in Mexico. With regards to does it affect timing? I don't think so at this point. We are to be sure though, we are still working on the plan and I think we would give more guidance with specific reference to timing as that becomes available.

Speaker 6

Great. Thank you very much for taking my question.

Operator

Your next question comes from Ralph Profiti from Haight Capital. Please go ahead.

Speaker 7

Good morning. Thanks for taking my questions. Mark, can I get some context around the positive tonnage reconciliation from the internal zones at Malartic? How much of a contribution was it in 2023? Is there anything in the model in the 2024 guidance?

Speaker 7

And should we be thinking about this 52,000 ton per day assumption as a relatively low bar for throughput?

Speaker 5

Well, if I start by commenting on your question about the reconciliation, what we've seen so far this year, when mining the Odyssey South, we're mining the internal zone that is adjacent. So when looking at the stope that we're mined this year, we managed to add and there's something like 40% more ton by adding that material adjacent and that turned out to be at the same grade globally. So it's been kind of adding 40% more ton, 40% more ounces. But now we are integrating some of that into our reserve and resources estimate. As a matter of fact, this year, we've been integrating almost we've seen a growth in Odyssey South by 57% due to those additions and a growth to the resource.

Speaker 5

So we are baking that positive reconciliation addition of ton in our model as we are moving forward, but we can expect that some additional ton will also show up.

Speaker 7

Got you. Very helpful. Natasha, I see that there was a power outage in Q4. And I was just wondering if this relates back to the transformer because it still sounds very confident that the power situation is in very good shape ahead of this 28,000,000 tonnes scenario brought forward. And I'm just thinking about what are some of the outstanding issues as we think about that optimization waterfall chart that showed that ultimate 30,000,000 ton run rate.

Speaker 4

So the power outage that you speak of at Detour, it was just a minor one, but and we recovered from that fairly quickly. With respect to the getting to 28,000,000 tonnes a year, we have a number of initiatives, but we can group that into like maybe 5 main ones. And that just factors in runtime improvement. So we have all the major infrastructure in place. We're just tweaking the system right now.

Speaker 4

For example, the re feed system, we're just making it allowing it to operate better in the winter months and just modifying some of the screen configuration so that it can take on more capacity, those kind of things.

Speaker 7

Sounds good. Very helpful. Thanks, everyone.

Operator

Your next question comes from Anita Soni from CIBC World Markets. Please go ahead.

Speaker 8

Hi, good morning, Amar and team. Thanks for taking my questions. I just have a couple of modeling deposit

Speaker 3

sorry,

Speaker 8

the Akasaba deposit is the tonnage at Goldex? And how like how will that play out for the next like it will look my assumption is about 10% and does that just sort of stay at that 10% level until it's run out or if you could give us some color on that would be great.

Speaker 3

Hi, Anita. Dominique speaking. The plan is to have 1,000 tonne per day coming from Akazaba and 7,000 tonne per day coming from Goldex.

Speaker 8

Okay. And until Akasaba is run out, right?

Speaker 3

Yes. That would be called 4, 5 years.

Speaker 8

Okay. And so for that reason then the cost I mean the cost increase that you in terms of unit cost that should I mean, what portion of that is related to the Akasaba or and how long should we be using those kind of unit costs?

Speaker 3

That's a good question. And it's not just only at Casaba. There's different element into play. As we are going from Deep 1 to Deep 2 at Goldex, it is changing the cost structure as well as we're mining more of the South Zone, which is higher cost tons, but higher grade tons. Overall, the costs are increasing.

Speaker 3

It's mainly related to that.

Speaker 8

Okay. And then similarly, a similar question for Macassa and the proportion of ore that you would see from the AK deposit?

Speaker 4

So hi Anita. So with the AK deposit, we're going to be doing a bulk sample this year, sending that to the El Z pit, but we're going to be ramping El Z mill, sorry. And then we're going to be ramping up to about 500 tonnes per day on average for the 8 ks deposit. And then Macassa, in terms of the underground potential, I would say, probably 15.50 tonnes per day, the mill capacity, yes, and net is peak probably 16.50.

Speaker 8

Okay. That's it for my questions for now. I'm still modeling, so I might get some of you guys offline later on.

Operator

And your next question comes from Greg Barnes from TD Securities. Please go ahead.

Speaker 9

Yes. Thank you, operator. Mark, can you talk a little bit about how you see the production profile evolving beyond 2026? You're sustaining 3,500,000 ounces roughly through that timeframe. Then what does it look like beyond that?

Speaker 1

Well, Greg, we don't give specific guidance beyond 3 years. People have asked us why don't we. What I would say is, I think while some others have given much longer term guidance and we didn't, I think we're the ones who are actually growing production and some of the other people aren't. So the best way to answer that is, and Greg, you know our assets pretty well. We have good assets.

Speaker 1

We're reinvesting in those assets. We're getting good exploration results. So we're pretty confident about our we've increased reserves by 10%. So without giving guidance or any number, I would say we're quite confident that we're going to continue to be able to run a very good business.

Speaker 10

Okay.

Speaker 9

Secondary, you talked about in the press release, higher or an increased throughput rates, I think, at Hope Bay. I know you've set the bar at roughly 300,000 to 350,000 ounces a year because that's what's economic in the North. But what kind of size are you thinking about above and beyond that at Hope Day going forward?

Speaker 3

Dominique speaking, Greg. The teams are doing the trade offs about the tonnage. There's 2 aspect into it. First is how could we use as much as we can the current infrastructure and to minimize the CapEx. So this is bringing us to a certain tonnage.

Speaker 3

Then how could we expand from those infrastructure and to bring it to higher tonnage. I will say, I see Hopi as a Meliadine project in term of 6, 7 gram per tonne. If we could bring it also at the tonnage of Meliadine 5, 6000, 6000 tonne per day that could be interesting. That might be the sweet spot, but we're still doing trade offs.

Speaker 9

Great. That's very helpful. Thank you.

Operator

Your next question comes from Carey MacRury from Canaccord Genuity. Please go ahead.

Speaker 11

Hi, good morning guys. A lot of well, some of your peers have made or are chasing growth in copper. Just wondering how you guys think about copper and more broadly base metal exposure?

Speaker 1

Well, I mean, I think copper has got a great future, frankly. I think the world is transitioning. I think we think the world is transitioning towards electric versus fossil fuels and copper will play a role there. We are quite excited about the potential at San Nicolas. As you recall, Kerry, we didn't do San Nicolas because it was copper.

Speaker 1

We did it because it makes a lot of money in a region we want to be in with a partner we want to be with. But certainly, we like copper and we are a gold company, but our job is to make money for our shareholders in a responsible way.

Speaker 2

Okay. So that leads to my second question.

Speaker 11

I mean, you talked about obviously having a regional focus and good jurisdictions. You're obviously the biggest player in Canada by a long shot. But in the long term, are you looking at other jurisdictions to grow into or how do you think about international diversification?

Speaker 1

We are open to international diversification. I mean Australia, probably between Australia and Canada is what's the best place in the world to mine. So we are open to very good mining regions. We're in 4 countries, 5 regions. Is it impossible to go to a 6th?

Speaker 1

No, it's not impossible. But it would have to meet the criteria of the geologic potential first and foremost, followed by a view on political stability to actually be able to make 10, 20 year investments. So we are a gold company. We are very strong in the jurisdictions we operate in. This year, the next few years really we're going to focus on what we've got and optimizing what we've got.

Speaker 1

We think we've got a great platform to build from. But if there's an opportunity that makes sense to create more value per share for our shareholders, we're going to look at it.

Speaker 11

All right. That's great. Thanks, Omar. Thank you.

Operator

Your next question comes from John Tumazos from John Tumazos Ferry Independent Research. Please go ahead.

Speaker 12

Congratulations. 900,000 ounces was almost as much as Barrick made in the quarter, getting big. There were a couple places in the press release and exploration release where the PROs and the numbers that I was trying to the numbers in the release were kind of hard to put together consistently or reconcile. Let me just ask about Fosterville where the 2025 guidance is a midpoint of 150,000 ounces output and that seems like 700,000 tons milled, 7 grams, 94% recovery. The reserve is 6.1 grams, which is a little lower than 7 grams.

Speaker 12

And then the pros of the presentation talks about 175,000 to 200,000 ounces. Is the 175,000 to 200,000 the average of 24, 2025 guidance? Or are you looking forward beyond 2026 expecting that you're going to hit something a little better than 6 grams just reported in reserve?

Speaker 1

John, I don't know. Do you want me to take it, Nattat? Okay. Yes, the $175,000,000 to $200,000,000 is looking forward beyond that timeframe. I mean, you're exactly right.

Speaker 1

Those are the numbers that we gave. And we are Fosterville is a great asset, great people. We are looking at sort of a long term steady state 175 to 200. That's kind of what we're working on. And you may say, well, look, that's only 175 to 200.

Speaker 1

Why are you guys in Australia? The answer is, we don't have proof, but we think there's more than one very high grade zone to be found there. Maybe it's not a swan, maybe it's a half a swan or maybe it's a 2x swan, but it generates a lot of cash flow. And so if you're us, what do you do? You position the mine to operate well, to operate consistently between 175 to 200 if you think you can have that steady and really give you the opportunity to find that next swan zone.

Speaker 1

Guy, did you want to jump in?

Speaker 5

Yes, John, if you look at in detail, because when we do the life of mine like that, we do the stope by stope exercise. So there will be some variation. So yes, the average is 6, but you can assume that some year we'll be at 7, some year we'll be at 5 depending on the mining sequence averaging 6 for the rest of the life of mine according to what we have. But it's not going to be stable at 6 over time. It's going to fluctuate because there's still some pocket of higher grade mineralization in the system that are smaller than this one, but it's all about sequencing the extraction of the 6.

Speaker 12

If we were going to just jump in the discussion, say the Hope Bay, The inferred resource at Hope Bay rose by 158,000 ounces. The reserves stayed the same. We should interpret from your good drill results and a good qualitative narrative that the inferred resource and the reserves are going to increase a lot more than 158,000 ounces when you get more infill drilling and more data I presume?

Speaker 5

Exactly, you're right. There has been some small portion that have reached inferred resources classification, but also we are, I would say, making sure that the, for example, the dilution assumption. So we've been also adjusting the model to so we've there's been some pluses and minuses and you're right, the bottom line is net 170 with a mixture of removing some of the lower grain material addition of a more realistic dilution. We haven't touched the reserve as well as you described. And you're right with the additional drilling we're going to see in the Madrid.

Speaker 5

We're expecting those ounces to show up later on in 2024 and 2025.

Speaker 12

And you talked about the ramp at Odyssey getting closer to the top of the East Goldie deposit, if I understood that correctly. So in the second and third quarter, you'll be able to visually expect the rock confidence and continuity of the very top of the East Goldie zone, which would put you in a position to add reserves at the end of 2024 or 2025 from those visual inspections

Speaker 2

in

Speaker 5

the especially because there's still the reserve as you can see in the long section goes basically from 800 meter down to 1.8 800 meter to 1.8 kilometer below surface and there's still 300 meter of inferred resources at the top. So that access on the top of the ore body as you described will allow us to enter open up the deposit, but also will provide a better position for Enfield Drilling from much closer in the upper part, upper and eastern part of the ore body where we see some quick win to potential reserve addition. And also if you put that in the bigger scheme of things, you look back at the PEA that we produce with 9,000,000 ounces, we are expecting that the rest of the ounces that were not convert this year in reserve will show up progressively over the next couple of 4, 5 years.

Speaker 12

Nothing better than being able to see and touch the rock. Thank you.

Speaker 5

Yes. I agree with you. We can't wait.

Operator

Your next question comes from Tanya Jakusconek from Scotiabank. Please go ahead.

Speaker 10

Great. Good afternoon, everyone. Thank you for taking my questions and congrats on a good quarter. Can I ask on just the guidance for 2024 as we look for the year throughout the year? Can I just ask about how we see production developing quarter on quarter?

Speaker 10

Are we similar to last year where it was generally equally distributed or should there be something else that we should be aware of?

Speaker 1

Hi, Tanya. We're expecting it to be relatively equal through the year.

Speaker 10

Okay. I like that. Never liked those strong Q4s. Okay, that's good. Thank you for that.

Speaker 10

And then Guy and Dominic, can I ask on Slide 23, I know we talked a little bit about the additional 500 1,000 ounces at Amaruq to extend the mine life? I'm just looking at the longitudinal to kind of see where you would have added those additional ounces. And then just maybe talk a little bit and I know Amar, you said you don't want to really talk about extending beyond 2028, but I'm trying to get an idea of where else could we see the potential extension beyond 2028 to try and bridge that gap before, let's say, Hope Bay comes in? Because I'm trying to understand whether we can use any of the workforce and or equipment and or other from Amaruq to Hope Bay to help with the CapEx. So, Oleg, you got it on that.

Speaker 3

I want

Speaker 5

to give you first part of the answer to your question. So about the where those 500,000 ounces will come from, they're going to come, I would say, from 3 major things. As we continue to see that positive reconciliation with more ton, better grade that were integrated in the model. So that will potentially represent up to maybe a quarter of the ounces added will come from that. And that positive reconciliation in the IVR pit that sits on the right hand side of that long section, we see kind of some very nice grade reconciliation in that part.

Speaker 5

So the one of the extension of the mine contribution is the pushback we're contemplating on the IVR pit. And both of those will also by default allow us to continue to mine underground. So the 3rd fold is continue mining additional stope that with the previous life of mine where the pit were depleted, we were not able to continue mining underground. So now we're going to be able to extend the underground, get some more stopes that were good grade, good quality, but that were not making sense on their own without an extension of the open pit. So it's a contribution of those 3 that leads to the addition of 500,000 ounces.

Speaker 5

And maybe Dominic, you want to comment?

Speaker 3

Yes, Daniel, Dominic. Just on that, our goal is really to extend Meadowbank and keep Meadowbank running. Now the equipment we could reuse and the workforce, there's different aspect of it that could be the genset, the HPGR, the compressor, pumps, different type of equipment. The thing is we don't know where they're going to go. Is it going to Upper Beaver, Detour Underground, Wazamak or Old Bay?

Speaker 3

All those options exist. Same thing with the workforce. We're going to be ramping up, what you say at the time, detour also have a lot of good position open. It might be whole bay too, but it's all opportunities.

Speaker 10

Okay. So there's lots of ability to use that equipment and people as you look out to the end of the decade? Yes. Okay. Thank you for that.

Speaker 10

And just maybe a question for you, Amar, if I could ask on just the non gold component. You mentioned you like copper. Obviously, San Nicolas is your first venture into sort of a copper asset. I saw some other smaller investments in non gold are being made. Should we be thinking that that's part of your strategy is investing in some of these junior non gold equities for 2024?

Speaker 10

Is that a strategy that's in place or are you looking to further grow with more developed upfront or producing copper assets?

Speaker 1

Well, Tanya, I think, so first of all, we are pretty focused on the gold projects that we have in our backyard that are the least risk and the highest return on capital. Now we've been around for 66 years. We're 98% gold right now. I would say that 60 years in the future, are we still going to be 98% gold? We'll probably have other metals.

Speaker 1

The difference with us is we're not going to and I'm not knocking this on anybody else, but we are not going to a jurisdiction we know nothing about to chase a particular type of metal. Our strategy is simple. We try to be the best in the regions we can be. And if we have a competitive advantage in an area we operate and a non gold asset becomes available where we have a competitive advantage, we would look at it. And so, of course, we would look at copper.

Speaker 1

We've done a couple of other small things people know about, but we're not going to a different jurisdiction with a different metal.

Speaker 10

Okay. So it would be in jurisdictions you're at looking at where you could add value?

Speaker 1

And only if it makes good return for our shareholders. I know that's self evident, but we're not for example, we're not setting a target that we're going to be X amount of copper because frankly that means you're chasing something. We're just going to be open to good opportunities. Now to your point, we've had a long history of very early stage investments. 9 out of 10 don't end up meeting our criteria.

Speaker 1

We end up doing just fine. But yes, you could expect us to keep our eyes and ears open for opportunities in the areas we operate.

Speaker 10

Okay, great. Thank you so much and good luck.

Speaker 1

Thank you very much.

Operator

Your next question comes from

Speaker 8

have been asked already, but I just wanted to ask for maybe a little bit more color on what we can expect with the update later in the first half of twenty twenty 4 on the Abbotibi optimization. I know you've talked about studies at Detour and Upper Beaver and Wazimak. Is there also going to be some discussion to integrate the entire district together? And maybe are we going to get some kind of information about mill optimization or infrastructure transportation, anything like that as well. If you can just maybe tell us what we should be expecting, that'd be helpful.

Speaker 8

Thank you.

Speaker 1

Thanks, Jackie. I think well, I'll be clear. We're going to give some more guidance on where we are in next steps on Detour. We're going to give more guidance on where we are in next steps on Upper Beaver. We are doing the work on transportation options, but really the best way to think about those is within the context of those projects.

Speaker 1

We are going to be giving more update on next steps at Wassa Mac, but probably not until the start of next year. We are of course, we are talking to everybody within a certain distance of and they're talking to us within a certain distance of Malartic with regards to future opportunities at the mill there. So, there's a lot going on. You're right. There's a lot of potential, but what you can expect middle of the year is really more focused on Detour and Upper Beaver.

Speaker 8

Thanks, Mark. And maybe that sort of answers my follow-up question a little bit. But we've heard a lot of talk about how much capacity you have with the maybe different mills and absolutely with your now about acquisition or maybe adding additional properties? Do you see a need to add additional properties to your portfolio in the Abitibi or are you going to swap what you've got first?

Speaker 1

Well, clearly, we're focused on what we've got. But with the question on acquisitions, maybe we're going to be focused more on return on capital. If somebody's got a project that they want to build and it gets a better return for them to use our mill and it's a better return on capital than us acquiring the person, we would do that. A simple example, I would rather put no additional capital and make $50,000,000 a year and put in a $100,000,000 of capital to make $60,000,000 a year. I know that sounds self evident, but we're going to look at the specific opportunities, but with a real focus on return on capital.

Speaker 1

And that could mean acquisitions, but it could also mean that some people who have good projects decide they want to use our mill.

Speaker 8

Got it. Thank you. Maybe one more follow-up if I can, just to follow-up on some of the other themes in the call on base metals. I know you've recently made an investment in Canada Nickel and it is in the at least regionally pretty in a similar jurisdiction. Is there any synergies with Canada Nickel besides personnel and sort of just expertise in the region, would any of your facilities suit that operation if it were to be built?

Speaker 1

Yes. I mean, our view on Canada Nickel is that it is and I hope I don't upset my ex CFO by saying that it's a very long term perspective that they're taking. I don't see anything imminent there. So certainly, we're not talking to them about providing people or developing anything. It's a vision that they have.

Speaker 1

It's a large, relatively low grade ore body that and they have an interesting vision. And so I think it's better to think, Jackie, really this is just a very early stage investment on our part. It's a big asset in our backyard, big option on nickel. But really it's the Canada nickel team running this, not Agnico.

Speaker 8

Got it. That's really helpful. Thanks very much, Mark.

Operator

Your next question comes from Martin Prodrier from Veritas Investment Research. Please go ahead.

Speaker 13

Thank you for taking my question. When I look at the cost increase, your guidance talks about a 4% year over year increase. Now there's some assets where you see an increase in volumes like Canadian Malartic and your cost increased 12%. Macassa, the cost increased 17% with higher volume. And Quitilla, the cost increased 10% on flat volumes.

Speaker 13

If you can provide some color on why in some of them you have higher volumes and have much higher cost? Thanks.

Speaker 2

Yes. Thanks for the question. It's Jamie here. It's really a function of sequencing, mine sequencing across our operations that you're going to have periods where tonnage is flat, but costs are on a per ounce basis are higher or lower just given the grade profile of the individual asset. But overall, when you look at our costs, I mean, we saw inflation running around 6% year over year.

Speaker 2

And our job as management is to try to do better than that through a higher denominator and through constantly focusing on optimizing our costs. I think we've delivered that with a 4% increase in our cash costs and all in sustaining cost guidance.

Speaker 13

Okay. But you cannot provide much color on any of those, Canari, Malartic, Macassa or Quitilla, what is driving that

Speaker 3

much higher?

Speaker 2

Yes. We can reach out offline and walk through that on an asset by asset basis. But with 11 operating mines, it's hard to provide a generalized answer. Okay, great. Thank you.

Operator

And there are no further questions at this time. I will turn the call back over to Mr. Amar Aljandi for closing remarks.

Speaker 1

Thank you, operator, and thank you, everyone, for joining us yet again. And we wish you all a happy weekend. Thank you.

Operator

Ladies and gentlemen, this concludes your conference call for today. We thank you for joining and you may now disconnect your lines. Thank you.

Remove Ads
Earnings Conference Call
T-Mobile US Q4 2023
00:00 / 00:00
Remove Ads