NASDAQ:FIP FTAI Infrastructure Q1 2024 Earnings Report $3.43 +0.17 (+5.21%) As of 03:16 PM Eastern Earnings HistoryForecast FTAI Infrastructure EPS ResultsActual EPS-$0.54Consensus EPS N/ABeat/MissN/AOne Year Ago EPSN/AFTAI Infrastructure Revenue ResultsActual Revenue$82.54 millionExpected RevenueN/ABeat/MissN/AYoY Revenue GrowthN/AFTAI Infrastructure Announcement DetailsQuarterQ1 2024Date5/7/2024TimeN/AConference Call DateWednesday, May 8, 2024Conference Call Time8:00AM ETUpcoming EarningsFTAI Infrastructure's Q1 2025 earnings is scheduled for Tuesday, May 6, 2025, with a conference call scheduled on Friday, May 9, 2025 at 8:00 AM ET. Check back for transcripts, audio, and key financial metrics as they become available.Conference Call ResourcesConference Call AudioConference Call TranscriptSlide DeckPress Release (8-K)Quarterly Report (10-Q)Earnings HistoryCompany ProfileSlide DeckFull Screen Slide DeckPowered by FTAI Infrastructure Q1 2024 Earnings Call TranscriptProvided by QuartrMay 8, 2024 ShareLink copied to clipboard.There are 3 speakers on the call. Operator00:00:00Good day and thank you for standing by. Welcome to the Q1 20 24 FTAI Infrastructure Earnings Conference Call. At this time, all participants are in a listen only mode. After the speakers' presentation, there will be a question and answer Please be advised that today's conference is being recorded. I would now like to hand the conference over to your speaker today, Alan Andrini, Investor Relations. Operator00:00:41Please go ahead. Speaker 100:00:43Thank you, Didi. I would like to welcome you all to the Epti Infrastructure Q1 2024 Earnings Call. Joining me here today are Ken Nicholson, the CEO of FTI Infrastructure and Scott Christopher, the company's CFO. We have posted an investor presentation and our press release on our website, which we encourage you to download if you have not already done so. Also, please note this call is open to the public in a listen only mode and is being webcast. Speaker 100:01:13In addition, we will be discussing some non GAAP financial measures during the call today, including adjusted EBITDA. The reconciliation of those measures to the most directly comparable GAAP measures can be found in the earnings supplement. Before I turn the call over to Ken, I would like to point out certain statements made today will be forward looking statements, including regarding future earnings. These statements by their nature are uncertain and may differ materially from actual results. We encourage you to review the disclaimers in our press release and investor presentation regarding non GAAP financial measures and forward looking statements and to review the risk factors contained in our quarterly report filed with the SEC. Speaker 100:01:56Now, I would like to turn the call over to Ken. Okay. Thank you very much, Alan, and good morning, everyone. This morning, we will be discussing our financial results for the Q1 of 2024. And in doing so, I'll be referring to the earnings supplement, which we recently posted to our website. Speaker 100:02:12Before getting into the financials, I'm pleased to report that our Board has authorized a 0.03 dollars per share quarterly dividend to be paid on May 29th to the holders of record on May 17th. Now onto the results. 1st quarter adjusted EBITDA prior to corporate expenses came in at $37,200,000 up 24 percent from the Q1 of 2023 and largely in line with EBITDA for the Q4 of 2023 when you exclude the impact of several one time items at our Jefferson terminal. Our performance for the quarter was driven by continued strength at TranStar, our biggest cash flow generator and steady operations at Long Ridge, while Jefferson results were impacted by a longer than expected maintenance overhaul at the Motiva refinery, which I'll talk more about shortly. Looking forward, we expect Q2 to demonstrate continued momentum across our company as a result of new business wins and multiple initiatives, which we implemented last year. Speaker 100:03:04We continue to forecast generating in excess of $200,000,000 of run rate EBITDA during 2024. In terms of the highlights at each segment, TranStar posted $21,700,000 of adjusted EBITDA generating new records in each of carloads, average rates and revenue. Operationally, TranStar had an excellent quarter and would have posted record EBITDA after adjusting for fuel surcharge timing and the receipt of 45 gs tax credits, which hit the P and L only in the Q4 of each year. Pricing increases in several new business activities, including our new railcar repair facility, having already begun to contribute in 2024. So we expect momentum to continue at TransStar in the year to come. Speaker 100:03:46At Jefferson, EBITDA was $6,800,000 for the quarter, reflecting the 45 day maintenance overhaul at the Motiva refinery. Had Motiva operations stayed steady, we estimate EBITDA would have exceeded $10,000,000 in Q1. With the outage behind us, Jefferson operations are more active than ever and the most recent month of April has posted record volumes and revenues putting us on pace to post record results in Q2. At Rapana, we made significant progress on our Phase 2 expansion project that will transform our business and long term EBITDA generation. And finally at Long Ridge results reflect consistent operations at a 98% capacity factor as well as reduced third party gas sales given the lower price environment for natural gas. Speaker 100:04:30We continue to be extremely optimistic about our prospects at Long Ridge, particularly for AI data center demand and believe the opportunity for creating substantial value from behind the meter customers is stronger than ever. Briefly on the balance sheet. Total debt of $1,300,000,000 at March 31 was unchanged from last quarter, dollars 562,000,000 of debt was at the corporate level while the rest of our debt was at our business units. TransStar continues to be completely debt free, while approximately $753,000,000 of debt was at our Jefferson segment and $50,000,000 was at Repauno. This week, we plan to launch a new debt financing at Jefferson with proceeds used to refinance a portion of our existing debt coming due next year and to finance construction of dock improvements at our new Jefferson South site in connection with the long term clean fuels contract we signed last year. Speaker 100:05:20Importantly, as part of the upcoming Jefferson financing, we also plan to incorporate a tender offer for some of our existing debt allowing us to opportunistically take advantage of the embedded discount and some of our outstanding tax exempt bonds which carry lower coupons. If successful, the tender offer will enable us to reduce our aggregate debt balance in a cash flow neutral manner, ultimately increasing the equity value of Jefferson. We expect the financing to be in the market over the next couple of weeks and close in late May or early June. I'll now talk through the detailed results at each of our segments and then I'll plan to turn it over to questions. Starting with TransStar on Slide 7 of the supplement, TransStar Turning to the and adjusted EBITDA of $23,600,000 in Q4. Speaker 100:06:12Carload volumes, average rate per car and total revenue all came in at new records in the quarter. Fuel expenses were slightly higher versus Q4 last year given the typical lag in fuel surges that we received. In Q4, we also experienced lower expenses versus this Q1 due to the impact of these 45 gs tax credits, which hit our P and L in a positive way in Q4 every year as opposed to being spread over the entire year. Had fuel expense and the tax credit dynamic been consistent with Q4, our Q1 EBITDA would have been another record result. We're making great progress on our various initiatives to drive incremental revenue and diversify our customer base. Speaker 100:06:52On June 1, we will commence a lease with Norfolk Southern for a 41 mile extension of TranStar's current East Ohio Valley Railroad. The extension provides TranStar with additional commercial opportunities, which have potential to contribute meaningful EBITDA in the near to mid term. We expect these new opportunities together with similar ones at other TransStar railroads to represent approximately $4,000,000 to $6,000,000 of quarterly EBITDA or $20,000,000 on an annualized basis. Now on to Jefferson. Jefferson generated $18,600,000 of revenue and 6.8 $1,000,000 of adjusted EBITDA in Q1 versus $19,300,000 of revenue and $14,300,000 of EBITDA in Q4. Speaker 100:07:32During the quarter Motiva undertook the 45 day maintenance overhaul of its large crude distillation unit and coker. The result was a temporary reduction in crude throughput at Jefferson, driving lower volumes and revenues during the overhaul. Had it not been for the turnaround, quarterly EBITDA would have exceeded Q4 when adjusting for Jefferson's Q4 gain on sale. By the end of the quarter, throughput volumes to Motiva returned to normal and we saw record volumes of over 200,000 barrels per day in the month of April, a new monthly record putting us on pace for record 2Q ahead. More importantly, the new business environment at Jufson remains robust and we're advancing more opportunities for both conventional energy products as well as clean hydrogen based fuels. Speaker 100:08:16In addition to the new 15 year contract for the transloading and export of ammonia commencing in 2025, we made good progress on 3 additional projects in advanced negotiations, which together with last year's ammonia contract represent approximately $75,000,000 of annual EBITDA and will be transformational for Jefferson. As we said last quarter, if we're successful in converting these opportunities to business wins, we will far exceed our prior targets of $80,000,000 of annual EBITDA. Briefly on Repauno, with Phase 1 operations continuing our negotiations are nearly complete in connection with our larger Phase 2 transloading system. We expect Phase 2 to quadruple the capacity of natural gas liquids handled at the terminal. I'm confident we'll sign up our first customer for Phase 2 here in the second quarter and start construction immediately thereafter. Speaker 100:09:04In the aggregate, we expect Phase 2 to cost approximately $200,000,000 to build, funded entirely with tax exempt debt and to generate approximately $40,000,000 of annual EBITDA once complete. And closing out with Long Ridge. Long Ridge generated $10,400,000 in EBITDA in Q1 versus $5,100,000 in Q4. Power plant operations were steady at the 98% of capacity factor while gas production continued to be managed down during the quarter in the currently lower gas price environment. Remember at gas prices of under $1.50 per MMBtu, our profit on third party sales is less meaningful. Speaker 100:09:37So we limit production and opt to keep excess gas in the ground. Most importantly, we've been actively advancing a handful of significant opportunities with on-site power customers at Long Ridge, which will have a significant positive impact on EBITDA. We continue under a letter of intent with the data center developer for the lease of property and utilization of a substantial portion of our power capacity. The LOI is a key step toward the execution of what we expect to be a long term binding agreement. On a macro level, data center demand in PJM region alone is projected to go from 3 gigawatts of power needs currently to nearly 17 gigawatts over the next 5 to 6 years. Speaker 100:10:18New renewable resources will simply not be sufficient to meet this demand and owners of modern efficient gas plants like Long Ridge have the potential to benefit greatly in the coming years. To wrap up, we're pleased with the quarter and expect Q2 and the quarters ahead to reflect our continued momentum. I'll turn the call back over to Alan. Thank you, Ken. Didi, you may now open the call to Q and Operator00:10:41A. Thank you. And our first question comes from Giuliano Bologna of Compass Point. Your line is open. Speaker 200:11:08Good morning. And it looks like you guys have made a lot of progress around new initiatives. So that's great to see. As a first question, I'd be curious if you can expand a little more on the Jefferson debt transaction that you were referring to, kind of what you're trying to achieve in terms of capturing the discount and then what you think you might end up doing on the back end in terms of new financing to complete that transaction? Speaker 100:11:34Yes, happy to. Good morning, Giuliano. Yes, the so they said that's a financing we expect to launch here in the very, very near term next few days. Purpose of financing is in part to refinance and extend maturities on some debt we have coming due next year. But we're certainly going to take advantage of some of the embedded discount in our existing taxes and bonds. Speaker 100:11:55And just to put that in perspective, at Jefferson today, we have a number of tranches of tax exempt debt that hold coupons that are as low as 1.8%, many of them have a 2 handle. And as a result, those bonds are trading at, let's say, a market yield of 5% to 6% in a very long duration, they have 20 to 25 years left prior to their maturity. And so they trade at meaningful discounts to par in order to yield 5% or 6%. So there's significant opportunity for us to tender for those bonds at a premium to their current trading level, but still at a deep discount to their par amount. And so what we'll simply do is issue new debt to raise the proceeds to buy back the old debt at a much lower price. Speaker 100:12:45The net effect of it all is 0 impact on cash flow at Jefferson, but a significant reduction in debt. Depending upon the tender and the results from the tender, we think the amount of discount that we might be able to capture is somewhere between $75,000,000 $125,000,000 Speaker 200:13:09That is very helpful. I appreciate that. Then switching over to the Long Ridge side. I'd be curious, it seems like there's been a lot of action with data center demand in Ohio and that Ohio is kind of taking over for Virginia in terms of being a little bit of an epicenter for kind of new data center demand as projects move a little further out. I'm curious if you're seeing that with the demand for potential data center opportunities behind the meter at Long Ridge? Speaker 100:13:39Yes. Definitely seen an increase in the inbound calls from the ultimate users, some of the big AI companies as well as the infrastructure companies that develop data centers. I would say we've seen a significant pickup in activity just over the past few months. And we're engaged with multiple parties, which is definitely encouraging. I mean, the math I got to say is extremely compelling. Speaker 100:14:12At Long Ridge today, we produce or generate 4 85 megawatts of power and we sell it into the grid today at just under $0.03 per kilowatt hour. So just to give you a sense of the economic impact of behind the meter customers like data centers, we generate today just under $0.03 per kilowatt hour of revenue at Long Ridge. The going rate for AI data centers and the cost of power to those is about $0.08 So almost 3 times what we are generating today. There is no material increase in the cost of generation. And so you can do the math. Speaker 100:14:52I mean that has impact on EBITDA. EBITDA today is on an annualized basis just from the power plant about $80,000,000 If we get anything close to $0.06 to $0.08 per kilowatt hour, EBITDA would double or triple at long range. So it's a huge opportunity. It's obviously great macro, strong demand, limited supply. We really like the setup and we like what Long Ridge has available. Speaker 100:15:18So it's a major priority for the company. Speaker 200:15:23That's great. And then shifting over to Jefferson, you obviously have a pretty big pipeline with the $75,000,000 of additional opportunities. I'm curious when I look at those opportunities, are there any specific commodities that you're planning on transloading or focusing on with related to these new contracts or new opportunities there? Speaker 100:15:41Yes. There are 4 total contracts, I would say in terms of 2 of them are for conventional fuels, crude oil and derivatives and 2 are for clean fuels. In terms of volumes, the clean fuel contracts are materially more volume. So on percentage basis, we like what it does to Jefferson in terms of the mix of product handle. It is a meaningful shift toward cleaner products, which is a generally good thing. Speaker 100:16:12But 2 of the contracts are for crude and crude derivatives. Those are both at our main terminal, and those are with those are new deals with existing customers, whereas the 2 contracts at Jefferson South are for clean fuels, carbon free ammonia, blue ammonia, And those are with new customers. One contract has been signed at Jefferson South. The other is advancing pretty rapidly. I think we're a few months away from having that at a point where it's at a final stage. Speaker 100:16:49And so we're excited about that. I do think Jefferson South is very promising as a new clean energy hub. It will be just with this first contract that we've already signed for blue ammonia export. It will be the largest gateway for the export of ammonia in the Gulf Coast. And so we're excited to get that project going. Speaker 200:17:11That's very helpful. And then shifting over to Transar, you obviously have been working on third party contracts there. I'd be curious when you originally acquired Transar, what percentage of the business was going from 3rd parties versus now? And then where do you think that could go by the end of 2024? Speaker 100:17:32Well, it was largely non existent when we acquired the company. I mean, it was just not part of TransStar's business to do any work for 3rd parties. This was an internal subsidiary of U. S. Steel that was deeply discouraged from handling or serving any customers not named U. Speaker 100:17:57S. Steel. So it was single digits of revenue from 3rd party. Today we're at, I want to say it's somewhere between $22,000,000 $25,000,000 of annual revenue from 3rd parties. Our long term goal is to triple or quadruple that number. Speaker 100:18:12By the end of this year, we had about $10,000,000 of incremental third party revenue every year. So by the end of this year, we should be running at about $30,000,000 to $35,000,000 of third party revenue. Speaker 200:18:25That's very helpful. The one thing I was just curious is just a quick follow-up, so actually I didn't miss it in the prepared remarks. You'd mentioned that Norfolk Southern 40 Mile extension. I'm curious if you mentioned anything about around the potential timeline around that. That was the only thing I was curious about there. Speaker 100:18:41Yes. We take over that track. The East Ohio Valley Railroad is a current asset in TranStar. It's relatively short. And we connect with the NS up in Mingo Junction. Speaker 100:19:00And we've been negotiating with NS to get this is not uncommon for Class Is to hand over or lease some of their lower density rail lines to short lines and regional railroads. And so we take over that line actually on June 1, just in a few weeks, which in and of itself is a good thing. It's a minimal operating expense. It's almost no rent that we'll be paying. We'll just take over the line and we'll handle maintenance of the line. Speaker 100:19:31We're already handling maintenance on the portion of track that obviously we own. So that's relatively straightforward. What's most important is there is a large development opportunity located on the new leased track And we've been negotiating with a counterparty, hence the interest in taking over that additional, trackage from NS so that we can actually handle the loading of freight in the assembly of trains for then transporting up to Mago Junction where we'll hand off the trains to Norfolk Southern. So excited about it. It's been in the works now for several months, but it is imminent and we'll be taking over that track in the coming weeks. Speaker 200:20:13That's very helpful. And then one final one. Obviously, you discussed a number of very large central contracts at both Jefferson and Repauno. And I'm curious if the types of contracts that you're seeing are large enough to be 8 ks events or press release events? Speaker 100:20:31Yes, yes. Generally wait until the quarter to announce those types of things. I think there are handful of these projects that are meaningful enough to probably give rise to reporting them intra quarter by way of a press release and 8 ks. I think it's just a combination of the size of the transactions and the duration, the certainty with minimum volume commitments, which all of our contracts have today and the contracts we negotiate will have. So I do think it's likely that as it relates to some of the projects I described earlier, I think it's more likely we'll make a we'll issue a press release upon execution of those agreements because they're material enough to do so. Speaker 200:21:24That's very helpful. I appreciate it and I will jump back in the queue. Speaker 100:21:28Thank you. Thank you. Operator00:21:29This concludes our Q and A session. I'd now like to turn it back to Alan Andrini for Speaker 100:21:36closing remarks. Thank you, Didi, and thank you all for joining us today. We look forward to updating you after Q2. Operator00:21:46This concludes today's conference call. Thank you for participating and you may now disconnect.Read moreRemove AdsPowered by Conference Call Audio Live Call not available Earnings Conference CallFTAI Infrastructure Q1 202400:00 / 00:00Speed:1x1.25x1.5x2xRemove Ads Earnings DocumentsSlide DeckPress Release(8-K)Quarterly report(10-Q) FTAI Infrastructure Earnings HeadlinesMoody’s lowers FTAI Infrastructure rating to B3 with negative outlookApril 15 at 5:17 PM | investing.comFTAI Infrastructure Inc. Announces Timing of First Quarter 2025 Earnings and Conference CallApril 14 at 5:39 PM | gurufocus.comCrypto’s crashing…but we’re still profitingMost traders are panicking right now. Bitcoin’s dropping. Altcoins are bleeding. The stock market’s a mess. The news is screaming fear. But while most traders watch their portfolios tank…April 16, 2025 | Crypto Swap Profits (Ad)FTAI Infrastructure Inc. Announces Timing of First Quarter 2025 Earnings and Conference Call | ...April 14 at 4:40 PM | gurufocus.comFTAI Infrastructure Inc. Announces Timing of First Quarter 2025 Earnings and Conference CallApril 14 at 4:15 PM | globenewswire.comFTA Infrastructure outlook upgraded to stable on expected deleveraging: S&P GlobalApril 8, 2025 | investing.comSee More FTAI Infrastructure Headlines Get Earnings Announcements in your inboxWant to stay updated on the latest earnings announcements and upcoming reports for companies like FTAI Infrastructure? Sign up for Earnings360's daily newsletter to receive timely earnings updates on FTAI Infrastructure and other key companies, straight to your email. Email Address About FTAI InfrastructureFTAI Infrastructure (NASDAQ:FIP) focuses on acquiring, developing, and operating assets and businesses that represent infrastructure for customers in the transportation, energy, and industrial products industries in North America. The company operates through five segments: Railroad, Jefferson Terminal, Repauno, Power and Gas, and Sustainability and Energy Transition. It operates a multi-modal crude oil and refined products terminal, and other related assets. The company also has a 1,630-acre deep-water port located along the Delaware River with an underground storage cavern, a multipurpose dock, a rail-to-ship transloading system, and multiple industrial development opportunities; and a 1,660-acre multi-modal port located along the Ohio River with rail, dock, and multiple industrial development opportunities, including a power plant under construction. In addition, it operates six freight railroads and one switching facility. FTAI Infrastructure Inc. was incorporated in 2021 and is headquartered in New York, New York.View FTAI Infrastructure ProfileRead more More Earnings Resources from MarketBeat Earnings Tools Today's Earnings Tomorrow's Earnings Next Week's Earnings Upcoming Earnings Calls Earnings Newsletter Earnings Call Transcripts Earnings Beats & Misses Corporate Guidance Earnings Screener Earnings By Country U.S. Earnings Reports Canadian Earnings Reports U.K. Earnings Reports Latest Articles Tesla Stock Eyes Breakout With Earnings on DeckJohnson & Johnson Earnings Were More Good Than Bad—Time to Buy? Why Analysts Boosted United Airlines Stock Ahead of EarningsLamb Weston Stock Rises, Earnings Provide Calm Amidst ChaosIntuitive Machines Gains After Earnings Beat, NASA Missions AheadCintas Delivers Earnings Beat, Signals More Growth AheadNike Stock Dips on Earnings: Analysts Weigh in on What’s Next Upcoming Earnings Netflix (4/17/2025)American Express (4/17/2025)Blackstone (4/17/2025)Infosys (4/17/2025)Marsh & McLennan Companies (4/17/2025)Charles Schwab (4/17/2025)Taiwan Semiconductor Manufacturing (4/17/2025)UnitedHealth Group (4/17/2025)HDFC Bank (4/18/2025)Intuitive Surgical (4/22/2025) Get 30 Days of MarketBeat All Access for Free Sign up for MarketBeat All Access to gain access to MarketBeat's full suite of research tools. Start Your 30-Day Trial MarketBeat All Access Features Best-in-Class Portfolio Monitoring Get personalized stock ideas. Compare portfolio to indices. Check stock news, ratings, SEC filings, and more. Stock Ideas and Recommendations See daily stock ideas from top analysts. Receive short-term trading ideas from MarketBeat. Identify trending stocks on social media. Advanced Stock Screeners and Research Tools Use our seven stock screeners to find suitable stocks. Stay informed with MarketBeat's real-time news. Export data to Excel for personal analysis. Sign in to your free account to enjoy these benefits In-depth profiles and analysis for 20,000 public companies. Real-time analyst ratings, insider transactions, earnings data, and more. Our daily ratings and market update email newsletter. Sign in to your free account to enjoy all that MarketBeat has to offer. Sign In Create Account Your Email Address: Email Address Required Your Password: Password Required Log In or Sign in with Facebook Sign in with Google Forgot your password? Your Email Address: Please enter your email address. Please enter a valid email address Choose a Password: Please enter your password. Your password must be at least 8 characters long and contain at least 1 number, 1 letter, and 1 special character. Create My Account (Free) or Sign in with Facebook Sign in with Google By creating a free account, you agree to our terms of service. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
There are 3 speakers on the call. Operator00:00:00Good day and thank you for standing by. Welcome to the Q1 20 24 FTAI Infrastructure Earnings Conference Call. At this time, all participants are in a listen only mode. After the speakers' presentation, there will be a question and answer Please be advised that today's conference is being recorded. I would now like to hand the conference over to your speaker today, Alan Andrini, Investor Relations. Operator00:00:41Please go ahead. Speaker 100:00:43Thank you, Didi. I would like to welcome you all to the Epti Infrastructure Q1 2024 Earnings Call. Joining me here today are Ken Nicholson, the CEO of FTI Infrastructure and Scott Christopher, the company's CFO. We have posted an investor presentation and our press release on our website, which we encourage you to download if you have not already done so. Also, please note this call is open to the public in a listen only mode and is being webcast. Speaker 100:01:13In addition, we will be discussing some non GAAP financial measures during the call today, including adjusted EBITDA. The reconciliation of those measures to the most directly comparable GAAP measures can be found in the earnings supplement. Before I turn the call over to Ken, I would like to point out certain statements made today will be forward looking statements, including regarding future earnings. These statements by their nature are uncertain and may differ materially from actual results. We encourage you to review the disclaimers in our press release and investor presentation regarding non GAAP financial measures and forward looking statements and to review the risk factors contained in our quarterly report filed with the SEC. Speaker 100:01:56Now, I would like to turn the call over to Ken. Okay. Thank you very much, Alan, and good morning, everyone. This morning, we will be discussing our financial results for the Q1 of 2024. And in doing so, I'll be referring to the earnings supplement, which we recently posted to our website. Speaker 100:02:12Before getting into the financials, I'm pleased to report that our Board has authorized a 0.03 dollars per share quarterly dividend to be paid on May 29th to the holders of record on May 17th. Now onto the results. 1st quarter adjusted EBITDA prior to corporate expenses came in at $37,200,000 up 24 percent from the Q1 of 2023 and largely in line with EBITDA for the Q4 of 2023 when you exclude the impact of several one time items at our Jefferson terminal. Our performance for the quarter was driven by continued strength at TranStar, our biggest cash flow generator and steady operations at Long Ridge, while Jefferson results were impacted by a longer than expected maintenance overhaul at the Motiva refinery, which I'll talk more about shortly. Looking forward, we expect Q2 to demonstrate continued momentum across our company as a result of new business wins and multiple initiatives, which we implemented last year. Speaker 100:03:04We continue to forecast generating in excess of $200,000,000 of run rate EBITDA during 2024. In terms of the highlights at each segment, TranStar posted $21,700,000 of adjusted EBITDA generating new records in each of carloads, average rates and revenue. Operationally, TranStar had an excellent quarter and would have posted record EBITDA after adjusting for fuel surcharge timing and the receipt of 45 gs tax credits, which hit the P and L only in the Q4 of each year. Pricing increases in several new business activities, including our new railcar repair facility, having already begun to contribute in 2024. So we expect momentum to continue at TransStar in the year to come. Speaker 100:03:46At Jefferson, EBITDA was $6,800,000 for the quarter, reflecting the 45 day maintenance overhaul at the Motiva refinery. Had Motiva operations stayed steady, we estimate EBITDA would have exceeded $10,000,000 in Q1. With the outage behind us, Jefferson operations are more active than ever and the most recent month of April has posted record volumes and revenues putting us on pace to post record results in Q2. At Rapana, we made significant progress on our Phase 2 expansion project that will transform our business and long term EBITDA generation. And finally at Long Ridge results reflect consistent operations at a 98% capacity factor as well as reduced third party gas sales given the lower price environment for natural gas. Speaker 100:04:30We continue to be extremely optimistic about our prospects at Long Ridge, particularly for AI data center demand and believe the opportunity for creating substantial value from behind the meter customers is stronger than ever. Briefly on the balance sheet. Total debt of $1,300,000,000 at March 31 was unchanged from last quarter, dollars 562,000,000 of debt was at the corporate level while the rest of our debt was at our business units. TransStar continues to be completely debt free, while approximately $753,000,000 of debt was at our Jefferson segment and $50,000,000 was at Repauno. This week, we plan to launch a new debt financing at Jefferson with proceeds used to refinance a portion of our existing debt coming due next year and to finance construction of dock improvements at our new Jefferson South site in connection with the long term clean fuels contract we signed last year. Speaker 100:05:20Importantly, as part of the upcoming Jefferson financing, we also plan to incorporate a tender offer for some of our existing debt allowing us to opportunistically take advantage of the embedded discount and some of our outstanding tax exempt bonds which carry lower coupons. If successful, the tender offer will enable us to reduce our aggregate debt balance in a cash flow neutral manner, ultimately increasing the equity value of Jefferson. We expect the financing to be in the market over the next couple of weeks and close in late May or early June. I'll now talk through the detailed results at each of our segments and then I'll plan to turn it over to questions. Starting with TransStar on Slide 7 of the supplement, TransStar Turning to the and adjusted EBITDA of $23,600,000 in Q4. Speaker 100:06:12Carload volumes, average rate per car and total revenue all came in at new records in the quarter. Fuel expenses were slightly higher versus Q4 last year given the typical lag in fuel surges that we received. In Q4, we also experienced lower expenses versus this Q1 due to the impact of these 45 gs tax credits, which hit our P and L in a positive way in Q4 every year as opposed to being spread over the entire year. Had fuel expense and the tax credit dynamic been consistent with Q4, our Q1 EBITDA would have been another record result. We're making great progress on our various initiatives to drive incremental revenue and diversify our customer base. Speaker 100:06:52On June 1, we will commence a lease with Norfolk Southern for a 41 mile extension of TranStar's current East Ohio Valley Railroad. The extension provides TranStar with additional commercial opportunities, which have potential to contribute meaningful EBITDA in the near to mid term. We expect these new opportunities together with similar ones at other TransStar railroads to represent approximately $4,000,000 to $6,000,000 of quarterly EBITDA or $20,000,000 on an annualized basis. Now on to Jefferson. Jefferson generated $18,600,000 of revenue and 6.8 $1,000,000 of adjusted EBITDA in Q1 versus $19,300,000 of revenue and $14,300,000 of EBITDA in Q4. Speaker 100:07:32During the quarter Motiva undertook the 45 day maintenance overhaul of its large crude distillation unit and coker. The result was a temporary reduction in crude throughput at Jefferson, driving lower volumes and revenues during the overhaul. Had it not been for the turnaround, quarterly EBITDA would have exceeded Q4 when adjusting for Jefferson's Q4 gain on sale. By the end of the quarter, throughput volumes to Motiva returned to normal and we saw record volumes of over 200,000 barrels per day in the month of April, a new monthly record putting us on pace for record 2Q ahead. More importantly, the new business environment at Jufson remains robust and we're advancing more opportunities for both conventional energy products as well as clean hydrogen based fuels. Speaker 100:08:16In addition to the new 15 year contract for the transloading and export of ammonia commencing in 2025, we made good progress on 3 additional projects in advanced negotiations, which together with last year's ammonia contract represent approximately $75,000,000 of annual EBITDA and will be transformational for Jefferson. As we said last quarter, if we're successful in converting these opportunities to business wins, we will far exceed our prior targets of $80,000,000 of annual EBITDA. Briefly on Repauno, with Phase 1 operations continuing our negotiations are nearly complete in connection with our larger Phase 2 transloading system. We expect Phase 2 to quadruple the capacity of natural gas liquids handled at the terminal. I'm confident we'll sign up our first customer for Phase 2 here in the second quarter and start construction immediately thereafter. Speaker 100:09:04In the aggregate, we expect Phase 2 to cost approximately $200,000,000 to build, funded entirely with tax exempt debt and to generate approximately $40,000,000 of annual EBITDA once complete. And closing out with Long Ridge. Long Ridge generated $10,400,000 in EBITDA in Q1 versus $5,100,000 in Q4. Power plant operations were steady at the 98% of capacity factor while gas production continued to be managed down during the quarter in the currently lower gas price environment. Remember at gas prices of under $1.50 per MMBtu, our profit on third party sales is less meaningful. Speaker 100:09:37So we limit production and opt to keep excess gas in the ground. Most importantly, we've been actively advancing a handful of significant opportunities with on-site power customers at Long Ridge, which will have a significant positive impact on EBITDA. We continue under a letter of intent with the data center developer for the lease of property and utilization of a substantial portion of our power capacity. The LOI is a key step toward the execution of what we expect to be a long term binding agreement. On a macro level, data center demand in PJM region alone is projected to go from 3 gigawatts of power needs currently to nearly 17 gigawatts over the next 5 to 6 years. Speaker 100:10:18New renewable resources will simply not be sufficient to meet this demand and owners of modern efficient gas plants like Long Ridge have the potential to benefit greatly in the coming years. To wrap up, we're pleased with the quarter and expect Q2 and the quarters ahead to reflect our continued momentum. I'll turn the call back over to Alan. Thank you, Ken. Didi, you may now open the call to Q and Operator00:10:41A. Thank you. And our first question comes from Giuliano Bologna of Compass Point. Your line is open. Speaker 200:11:08Good morning. And it looks like you guys have made a lot of progress around new initiatives. So that's great to see. As a first question, I'd be curious if you can expand a little more on the Jefferson debt transaction that you were referring to, kind of what you're trying to achieve in terms of capturing the discount and then what you think you might end up doing on the back end in terms of new financing to complete that transaction? Speaker 100:11:34Yes, happy to. Good morning, Giuliano. Yes, the so they said that's a financing we expect to launch here in the very, very near term next few days. Purpose of financing is in part to refinance and extend maturities on some debt we have coming due next year. But we're certainly going to take advantage of some of the embedded discount in our existing taxes and bonds. Speaker 100:11:55And just to put that in perspective, at Jefferson today, we have a number of tranches of tax exempt debt that hold coupons that are as low as 1.8%, many of them have a 2 handle. And as a result, those bonds are trading at, let's say, a market yield of 5% to 6% in a very long duration, they have 20 to 25 years left prior to their maturity. And so they trade at meaningful discounts to par in order to yield 5% or 6%. So there's significant opportunity for us to tender for those bonds at a premium to their current trading level, but still at a deep discount to their par amount. And so what we'll simply do is issue new debt to raise the proceeds to buy back the old debt at a much lower price. Speaker 100:12:45The net effect of it all is 0 impact on cash flow at Jefferson, but a significant reduction in debt. Depending upon the tender and the results from the tender, we think the amount of discount that we might be able to capture is somewhere between $75,000,000 $125,000,000 Speaker 200:13:09That is very helpful. I appreciate that. Then switching over to the Long Ridge side. I'd be curious, it seems like there's been a lot of action with data center demand in Ohio and that Ohio is kind of taking over for Virginia in terms of being a little bit of an epicenter for kind of new data center demand as projects move a little further out. I'm curious if you're seeing that with the demand for potential data center opportunities behind the meter at Long Ridge? Speaker 100:13:39Yes. Definitely seen an increase in the inbound calls from the ultimate users, some of the big AI companies as well as the infrastructure companies that develop data centers. I would say we've seen a significant pickup in activity just over the past few months. And we're engaged with multiple parties, which is definitely encouraging. I mean, the math I got to say is extremely compelling. Speaker 100:14:12At Long Ridge today, we produce or generate 4 85 megawatts of power and we sell it into the grid today at just under $0.03 per kilowatt hour. So just to give you a sense of the economic impact of behind the meter customers like data centers, we generate today just under $0.03 per kilowatt hour of revenue at Long Ridge. The going rate for AI data centers and the cost of power to those is about $0.08 So almost 3 times what we are generating today. There is no material increase in the cost of generation. And so you can do the math. Speaker 100:14:52I mean that has impact on EBITDA. EBITDA today is on an annualized basis just from the power plant about $80,000,000 If we get anything close to $0.06 to $0.08 per kilowatt hour, EBITDA would double or triple at long range. So it's a huge opportunity. It's obviously great macro, strong demand, limited supply. We really like the setup and we like what Long Ridge has available. Speaker 100:15:18So it's a major priority for the company. Speaker 200:15:23That's great. And then shifting over to Jefferson, you obviously have a pretty big pipeline with the $75,000,000 of additional opportunities. I'm curious when I look at those opportunities, are there any specific commodities that you're planning on transloading or focusing on with related to these new contracts or new opportunities there? Speaker 100:15:41Yes. There are 4 total contracts, I would say in terms of 2 of them are for conventional fuels, crude oil and derivatives and 2 are for clean fuels. In terms of volumes, the clean fuel contracts are materially more volume. So on percentage basis, we like what it does to Jefferson in terms of the mix of product handle. It is a meaningful shift toward cleaner products, which is a generally good thing. Speaker 100:16:12But 2 of the contracts are for crude and crude derivatives. Those are both at our main terminal, and those are with those are new deals with existing customers, whereas the 2 contracts at Jefferson South are for clean fuels, carbon free ammonia, blue ammonia, And those are with new customers. One contract has been signed at Jefferson South. The other is advancing pretty rapidly. I think we're a few months away from having that at a point where it's at a final stage. Speaker 100:16:49And so we're excited about that. I do think Jefferson South is very promising as a new clean energy hub. It will be just with this first contract that we've already signed for blue ammonia export. It will be the largest gateway for the export of ammonia in the Gulf Coast. And so we're excited to get that project going. Speaker 200:17:11That's very helpful. And then shifting over to Transar, you obviously have been working on third party contracts there. I'd be curious when you originally acquired Transar, what percentage of the business was going from 3rd parties versus now? And then where do you think that could go by the end of 2024? Speaker 100:17:32Well, it was largely non existent when we acquired the company. I mean, it was just not part of TransStar's business to do any work for 3rd parties. This was an internal subsidiary of U. S. Steel that was deeply discouraged from handling or serving any customers not named U. Speaker 100:17:57S. Steel. So it was single digits of revenue from 3rd party. Today we're at, I want to say it's somewhere between $22,000,000 $25,000,000 of annual revenue from 3rd parties. Our long term goal is to triple or quadruple that number. Speaker 100:18:12By the end of this year, we had about $10,000,000 of incremental third party revenue every year. So by the end of this year, we should be running at about $30,000,000 to $35,000,000 of third party revenue. Speaker 200:18:25That's very helpful. The one thing I was just curious is just a quick follow-up, so actually I didn't miss it in the prepared remarks. You'd mentioned that Norfolk Southern 40 Mile extension. I'm curious if you mentioned anything about around the potential timeline around that. That was the only thing I was curious about there. Speaker 100:18:41Yes. We take over that track. The East Ohio Valley Railroad is a current asset in TranStar. It's relatively short. And we connect with the NS up in Mingo Junction. Speaker 100:19:00And we've been negotiating with NS to get this is not uncommon for Class Is to hand over or lease some of their lower density rail lines to short lines and regional railroads. And so we take over that line actually on June 1, just in a few weeks, which in and of itself is a good thing. It's a minimal operating expense. It's almost no rent that we'll be paying. We'll just take over the line and we'll handle maintenance of the line. Speaker 100:19:31We're already handling maintenance on the portion of track that obviously we own. So that's relatively straightforward. What's most important is there is a large development opportunity located on the new leased track And we've been negotiating with a counterparty, hence the interest in taking over that additional, trackage from NS so that we can actually handle the loading of freight in the assembly of trains for then transporting up to Mago Junction where we'll hand off the trains to Norfolk Southern. So excited about it. It's been in the works now for several months, but it is imminent and we'll be taking over that track in the coming weeks. Speaker 200:20:13That's very helpful. And then one final one. Obviously, you discussed a number of very large central contracts at both Jefferson and Repauno. And I'm curious if the types of contracts that you're seeing are large enough to be 8 ks events or press release events? Speaker 100:20:31Yes, yes. Generally wait until the quarter to announce those types of things. I think there are handful of these projects that are meaningful enough to probably give rise to reporting them intra quarter by way of a press release and 8 ks. I think it's just a combination of the size of the transactions and the duration, the certainty with minimum volume commitments, which all of our contracts have today and the contracts we negotiate will have. So I do think it's likely that as it relates to some of the projects I described earlier, I think it's more likely we'll make a we'll issue a press release upon execution of those agreements because they're material enough to do so. Speaker 200:21:24That's very helpful. I appreciate it and I will jump back in the queue. Speaker 100:21:28Thank you. Thank you. Operator00:21:29This concludes our Q and A session. I'd now like to turn it back to Alan Andrini for Speaker 100:21:36closing remarks. Thank you, Didi, and thank you all for joining us today. We look forward to updating you after Q2. Operator00:21:46This concludes today's conference call. Thank you for participating and you may now disconnect.Read moreRemove AdsPowered by