NYSE:PEG Public Service Enterprise Group Q2 2024 Earnings Report $83.49 -0.18 (-0.22%) Closing price 03:59 PM EasternExtended Trading$83.43 -0.06 (-0.08%) As of 06:00 PM Eastern Extended trading is trading that happens on electronic markets outside of regular trading hours. This is a fair market value extended hours price provided by Polygon.io. Learn more. Earnings HistoryForecast Public Service Enterprise Group EPS ResultsActual EPS$0.63Consensus EPS $0.64Beat/MissMissed by -$0.01One Year Ago EPS$0.70Public Service Enterprise Group Revenue ResultsActual Revenue$2.42 billionExpected Revenue$2.03 billionBeat/MissBeat by +$395.55 millionYoY Revenue Growth+0.10%Public Service Enterprise Group Announcement DetailsQuarterQ2 2024Date7/30/2024TimeBefore Market OpensConference Call DateTuesday, July 30, 2024Conference Call Time11:00AM ETUpcoming EarningsPublic Service Enterprise Group's Q1 2025 earnings is scheduled for Wednesday, April 30, 2025, with a conference call scheduled at 11:00 AM ET. Check back for transcripts, audio, and key financial metrics as they become available.Q1 2025 Earnings ReportConference Call ResourcesConference Call AudioConference Call TranscriptSlide DeckPress Release (8-K)Quarterly Report (10-Q)Earnings HistoryCompany ProfileSlide DeckFull Screen Slide DeckPowered by Public Service Enterprise Group Q2 2024 Earnings Call TranscriptProvided by QuartrJuly 30, 2024 ShareLink copied to clipboard.There are 16 speakers on the call. Operator00:00:00Ladies and gentlemen, thank you for standing by. My name is Rob, and I'm your event operator today. I'd like to welcome everyone to today's conference, Public Service Enterprise Group's Second Quarter 2024 Earnings Conference Call and Webcast. At this time, all participants are in listen only mode. Later, we'll conduct a question and answer session for members of the financial community. Operator00:00:36As a reminder, this conference is being recorded today, July 30, 2024, and will be available for replay as an audio webcast on PSEG's Investor Relations website at Speaker 100:00:51https:investor.pscg.com. Operator00:00:55I would now like to turn the conference over to Carlotta Jahn. Carlotta, please go ahead. Speaker 200:01:01Good morning, and welcome PSEG's Q2 2024 Earnings Presentation. On today's call are Ralph LaRosa, Chair, President and CEO and Dan Craig, Executive Vice President and CFO. The press release, attachments and slides for today's discussion are posted on our IR website at investor. Pseg.com and our 10 Q will be filed later today. PSEG's earnings release and other matters discussed during today's call contain forward looking statements and estimates that are subject to various risks and uncertainties. Speaker 200:01:36We will also discuss non GAAP operating earnings, which differs from net income as reported in accordance with Generally Accepted Accounting Principles or GAAP in the United States. We include reconciliations of our non GAAP financial measures and a disclaimer regarding forward looking statements on our IR website and in today's materials. Following the prepared remarks, we will conduct a 30 minute question and answer session. I will now turn the call over to Ralph LaRosa. Speaker 300:02:06Thank you, Carlotta. Good morning to everyone, and thanks for joining us to review PSEG's 2nd quarter results. PSEG reported net income of $0.87 per share for the Q2 of 2024, bringing results for the first half of 2024 to $1.93 per share. This compares to net income of $1.18 per share and $3.76 per share for the 2nd quarter and first half of twenty twenty three respectively. The 2023 GAAP earnings had reflected higher mark to market gains that benefited those earnings. Speaker 300:02:43Our results for the quarter year to date periods are summarized on Slide 7 and 9 in the webcast slides. Non GAAP operating earnings were $0.63 per share for the Q2 of 2024 and $1.94 per share for the first half of the year. This compares to non GAAP operating earnings of $0.70 per share and $2.09 per share for the Q2 and first half of twenty twenty three respectively. As a reminder, our non GAAP results exclude the items shown in Attachments 89, which are included with the earnings release. Dan will provide a detailed financial review later in the call, but I want to note that the results for the 1st 6 months of 2024 are on track with our full year expectations. Speaker 300:03:30These expectations reflect the anticipated resolution of PSE and G's distribution rate case later this year and the realization of most of the increase in PSEG Power and Other's 2024 gross margin concentrated in the 4th quarter. Turning to operations for the Q2, New Jersey has experienced what may turn out to be one of the hottest summers. The early and extended heat wave we experienced last month made June 2024 the 2nd warmest June in our records. Our electric transmission and distribution system performed exceptionally well, meeting the daily load requirements. In addition, our employees provided outstanding customer care, handling double the call volume compared to the same period in 2023, responding to requests for customer service and air conditioning repairs. Speaker 300:04:22PSE and G responded to the elevated call volume and restored power to the electric customers affected by severe storms and heat related incidents, bringing them back online in under 24 hours, while responding to air conditioning service calls on average in 9 hours. Our electric and gas systems also withstood a 4.8 impact earthquake in April, which resulted in required inspections, but resulted in no operational issues. At PSEG Power, we completed the scheduled refueling of our wholly owned Hope Creek Nuclear Station on schedule, which lowered the fleet's capacity factor from over 96% in the Q1 to 82.7% for the 2nd quarter. As expected, the refueling average also reduced total generation for the Q2, but for the year to date through June, the 2 Salem units, which share the site with Hope Creek, operated at a capacity factor of 99%, keeping us on track with our full year generation forecast of 30 terawatt to 32 terawatt hours. Switching to regulatory activity. Speaker 300:05:33In May 2024, the New Jersey Board of Public Utilities, or the BPU, approved an additional extension of our Clean Energy Future, or Energy Efficiency Program of approximately $300,000,000 covering a 6 month commitment period from July of 2024 through December of 2024. And in June, the BPU approved the recovery of PSE and G's previously deferred COVID-nineteen costs over a 5 year period starting in June of 2025. We continue to participate in confidential discussions with various parties to resolve both our distribution base rate case as well as the $3,100,000,000 Energy Efficiency 2 filing. These discussions are ongoing in parallel, and we anticipate that both cases can be resolved later this year. We recently submitted the final update to the base rate case filing with actual data for the full test year. Speaker 300:06:32As a reminder, the combined electric and gas distribution rate case filing is primarily to recover incremental capital spending. We have proposed an overall revenue increase of 9% with a typical combined residential and electric and gas customer seeing a proposed increase of 12% or less than 2% compounded growth over the 6 year period. As a single state utility with dual regulatory jurisdictions, this distribution filing covers approximately 57% of our total rate base. That said, customer affordability continues to be a priority and we continue to compare favorably with our regional peers. PSE and G customers have a lower than average electric bill and the lowest gas bill in the region. Speaker 300:07:22Additionally, PSE and G recently filed with the BPU to implement another gas supply cost reduction this October, a third since January of 2023, which will further help customer affordability this coming winter. Moving on to capital investments, we remain on track to execute PSEG's 5 year $19,000,000,000 to $22,500,000,000 capital plan through 2028. The regulated portion represents $18,000,000,000 to $21,000,000,000 of the total, focused on infrastructure replacement and our award winning energy efficiency programs. PSE and G has placed into service over 2,000,000 of the 2,300,000 smart meters planned through our AMI program, still on schedule for completion by the end of this year. These investments are captured in our projections for our compound annual growth rate and rate base of 6% to 7.5% over the 2024 through 2028 period, starting from a year end 2023 rate base of 29,000,000,000 dollars which was up 10% over the prior year. Speaker 300:08:32We also continue to pursue potential incremental investment opportunities for future regulated growth. Along those lines, PSE and G has experienced an increase in new business requests and feasibility studies from potential data center customers across our service area compared with 2023 activity, which combined with increased electric vehicle charging is expected to drive load growth and system investment needs in the future. Switching to regulated transmission stations, which are scheduled for this summer, PSE and G expects that the BPU will announce the winner or winners of the pre built offshore wind infrastructure during the second half of twenty twenty four. Last month, the BPU postponed its 2nd state agreement approach process to procure transmission to support offshore wind generation, while it evaluates the impact of FERC and PJM activity on long term transmission planning, cost allocation and interconnection Q reform. The BPU may reevaluate this timing and the need for a second SAA solicitation in 6 months, which would be this coming December. Speaker 300:09:46PJM opened the 2024 Regional Transmission Expansion Plan Window 1 solicitation earlier this month, which reflects their higher load growth forecast on the 2029 to 2,032 planned horizon that has been influenced by increased electrification expectations and data center load growth throughout PJM. We are evaluating the Window 1 solicitation for potential opportunities to bid this September. Now crossing the Hudson for a moment and as expected, the Long Island Power Authority opened a request for proposals process to select a manager to operate their electric grid. Our existing operating services agreement and power supply contract with Piper runs through the end of 2025. We intend to submit proposals into their RFP process and LIPA is expected to make selections early next year. Speaker 300:10:40At PSEG Power, we are also continuing to explore opportunities for the potential sale of electricity from our nuclear facilities, pursuant to long term agreements to supply large power energy users such as data centers and hydrogen producers. In addition, we are pursuing multiple growth plans that include thermal and efficiency upgrades at our co owned Salem units that could potentially increase the combined output by up to 200 megawatts and qualify for tax credits on the current rules. Today, we are reaffirming our guidance for long term non GAAP operating earnings growth of 5% to 7% through 2028, which is based on the threshold price of the Nuclear Production Tax Credit or the PTC that also provides these units with revenue stability through 2,032. We continue to deploy the free cash from the nuclear business to help fund utility growth without the need to issue new equity or sell assets. And this continues to be a differentiating factor for us. Speaker 300:11:48Importantly, our solid balance sheet supports the execution of our capital investment program of $19,000,000,000 to $22,500,000,000 through 2028 and provides the opportunity for consistent and sustainable dividend growth. In summarizing the 1st 6 months of the year, solid execution is driving our expected results. We have settled 2 regulatory proceedings in the past quarter, and we are working to resolve our pending base rate case and the E2 filings later this year. We are also advancing our 5 year capital investment plan focused on infrastructure modernization and energy efficiency initiatives. These investments will help prepare our system for greater electrification of transportation, homes and workplaces, while also reducing greenhouse gas emissions and helping to lower customer bills. Speaker 300:12:37Last but certainly not least, I want to thank our employees for all they do. Their tireless efforts have helped us to maintain best in class operating statistics and customer service, especially through the challenging heat wave we have seen this year. I'll now turn the call over to Dan to discuss our financial results and outlook in greater detail and we'll be available for your questions after his remarks. Speaker 400:13:00Great. Thank you, Ralph. Good morning, everybody. As Ralph mentioned earlier, PSEG reported net income of $0.87 per share for the 2nd quarter of 2024 and that compares to $1.18 per share in 2023. Non GAAP operating earnings were 0.6 $3 per share in the Q2 of 2024 compared to $0.70 per share in 2023. Speaker 400:13:24Slide 79 detail the contribution to non GAAP operating earnings per share by business segment for the Q2 and first half of twenty twenty four. Slides 8 and 10 contain waterfall charts that will take you through the net changes for the quarter over quarter 6 month periods in non GAAP operating earnings per share by major business. Starting with PSE and G, which reported 2nd quarter net income of $0.60 per share for 2024 compared to $0.67 per share in 2023. PSE and G had non GAAP operating earnings of $0.60 per share for the Q2 of 2024 compared to $0.68 per share in 2023. The main drivers for both net income and non GAAP results for the quarter were growth in rate base from higher regulated investments, offset by higher investment related depreciation and interest expense, awaiting rate recovery in our pending rate case, as well as higher O and M costs due to regulatory, safety and weather related activities. Speaker 400:14:33Compared to the Q2 of 2023, electric margin increased by $0.02 per share due to customer growth in the Conservation Incentive Program or SIP and our final Energy Strong II recovery and energy efficiency investment of $0.01 per share higher. Other distribution margin added $0.02 per share, while transmission margin declined by $0.02 per share due to timing of revenue at O and M including our annual true up. Ralph referred to the heat wave we experienced in June and this warmer weather combined with greater storm activity led to higher corrective maintenance costs during the quarter. Distribution L and M expense increased by $0.04 per share compared to the Q2 of 2023 also due to higher gas meter inspections and safety costs. Depreciation and interest expense increased by $0.01 per share and $0.02 per share respectively compared to the Q2 of 2023 reflecting continued growth in investment and higher interest expense. Speaker 400:15:39Lower pension and OPEB income resulting from the cessation of OPEB related credits, which ended in 2023 resulted in a $0.01 per share unfavorable comparison to the year earlier quarter. Lastly, the timing of taxes recorded through an annual effective tax rate, which nets to 0 over a full year and other taxes had a net unfavorable impact of $0.03 per share in the quarter compared to 2023. Summer weather in the Q2 as measured by the temperature humidity index was 42% warmer than normal and 99% warmer than the Q2 of 2023. In fact, the Q2 of 2024 was the warmest Q2 in our records going back 55 years, mostly due to that June heat wave. As a reminder, weather variations have minimal impact on our utility margin because of the conservation incentive program or SIP mechanism, which limits the impact of weather and other sales variances, positive or negative, on electric and gas margins, while helping PSE and G broadly promote the adoption of its energy efficiency program. Speaker 400:16:51The number of electric and gas customers, which is the driver of margin under the SIP mechanism, continued to grow by approximately 1% each over the past year. On capital spending, PSE and G invested approximately $900,000,000 during the 2nd quarter and we remain on track to execute on our 2024 regulated capital investment plan of $3,400,000,000 It's focused on infrastructure modernization and decarbonization initiatives. These include upgrades and replacements to our T and D facilities, last mile spend in the infrastructure advancement program, ongoing gas infrastructure replacement spending and the continued clean energy investments across EE, smart meter installation and EV make ready infrastructure. We are reaffirming our 5 year regulated capital investment plan of $18,000,000,000 to $21,000,000,000 from 20.24 to 2028. The high end of this plan includes the $3,100,000,000 CES Energy Efficiency 2 filing made December 2023 that would enable commitments from January 25 to June 27 based on the BPU's EE framework. Speaker 400:18:09As Ralph said earlier, this proceeding is expected to be resolved at the BPU later this year. Moving to PSEG Power and Other. For the Q2 of 2024, PSEG Power and Other reported net income of $0.27 per share compared to $0.51 per share for the Q2 of 2023. Non GAAP operating earnings were 0 point 2024 compared to non GAAP operating earnings of $0.02 per share for the Q2 of 2023. In the Q2 of 2024, net energy margin rose by $0.08 per share driven by nuclear including the net impact of the nuclear PTC that took effect January 1, 2024, partially offset by the anticipated reduction in generation due to the Hope Creek outage and capacity revenue. Speaker 400:19:04As a reminder, for 2024, there will be a shape to our quarterly results as we move through the remainder of the year. We anticipate realizing most of the increase in the 2024 gross margin over 2023 gross margin during the second half of the year, specifically in the Q4 based upon the shape of our underlying hedges. This differs from last year when PSEG Power realized most of the step up in the annual hedge price in the Q1 of 2023. O and M increased by $0.05 per share, mostly driven by the scheduled refueling at our 100% owned Hope Creek Nuclear Unit. Interest expense was $0.01 unfavorable reflecting incremental debt at higher rates and taxes and other were $0.01 per share unfavorable compared to the second quarter of 2023, primarily reflecting the use of a higher effective tax rate in the quarter that will reverse over the balance of 2024. Speaker 400:20:03On the operating side, the nuclear fleet produced approximately 7 terawatt hours during the Q2 of 2024 compared to 7.7 terawatt hours in the year earlier period and ran at a capacity factor of 82.7%. Nuclear generation in the first half of twenty twenty four totaled 15.2 terawatt hours, which was impacted by the Hoke Creek refueling, but also benefited from high capacity factor performance at our 2 Salem units, which operated at 98.9% for the quarter and at 99.3% for the first half of twenty twenty four. Touching on some recent financing activity. As of the end of June, PSEG had total available liquidity of $3,100,000,000 including $113,000,000 of cash on hand. Following the issuance of $1,250,000,000 of PSEG senior notes in March, during the Q2 PSEG paid off $500,000,000 of a 3 64 day term loan in April $750,000,000 of PSEG senior notes in June. Speaker 400:21:13With the PSEG term loan redemption in March, PSEG's variable rate debt at the end of June consisted of a $1,250,000,000 term loan maturing March 2025, the entirety of which has been swapped out from a variable rate to a fixed rate to mitigate the fluctuations in interest rates. At the end of June, given our swaps, we had minimal variable rate debt. On the credit ratings front, in June Moody's updated PSEG Power's outlook to stable from positive and this change is consistent with our future plans for leverage and our targeted credit rating. We continue to maintain a solid Baa2 investment grade rating at PSEG Power. In closing, we are reaffirming PSEG's full year 2024 non GAAP operating earnings guidance of $3.60 to $3.70 per share, which reflects continued rate base growth from ongoing regulated investments, offset by higher depreciation and interest as we await resolution of our pending distribution rate case later this year. Speaker 400:22:24We are also reaffirming our forecast of long term 5% to 7% compound annual growth in non GAAP operating earnings through 2028, supported by our capital investment programs and the Nuclear PTC. This concludes our formal remarks and we are now ready to begin the question and answer session. Operator00:22:48Thank you. Ladies and gentlemen, we'll now begin the question and answer session for members of the financial community. The first question is from Julien Dumoulin Smith with Jefferies. Please proceed with your question. Speaker 500:23:21Good morning, team. Thank you guys for the time. It's nice to chat again. Speaker 300:23:24Well, it's good to hear you again. Speaker 500:23:28Back in action, as they say. Look guys, nicely done, seriously. A bunch of questions here on what you guys just said. First off, just talking about the data center opportunity as is the buzz these days. Can you elaborate a little Speaker 600:23:44bit on what you're seeing today Speaker 500:23:45about your co located opportunities? And how are you thinking about the economic benefit criteria that you would and other stakeholders would like to see contribute to the local community here? Obviously, that's a key element of bringing jobs to New Jersey here. So can you elaborate on that? And then separately related, how would you characterize demand for data centers outside of perhaps co located opportunities in New Jersey today? Speaker 500:24:11Any kind of quantifiable commitment numbers or soft numbers that you would kind of see today that you care to share? Speaker 300:24:20Yes, that's great. Thanks for that, Julian, and again, welcome back. Look, I would say a couple of things to you. I'm going to answer your first question with purely my choose New Jersey economic development hat on. And that is that it really has a couple of benefits of co located data center. Speaker 300:24:39And it's not necessarily just that it's co located, it's the fact that it's a hyperscale data center. It's going to provide a clear signal to AI companies that are looking to locate here in New Jersey and in the region that the infrastructure is here up and running and ready to go for their businesses to thrive. So there'll be a lot of, I would say, trickled down opportunities that get created. Specific to the site, you obviously have your construction activities, but not the least of which would be driven by wire work that the IBWs here in New Jersey would benefit from. So there's a lot of local opportunities that take place from the construction activities. Speaker 300:25:26They are one time. But as you've heard from others, they do grow over that one time. It's not all done in 1 month, it's over several years. They ramp up these data centers. And then there's a lot of other opportunities that happen for edge computing or AI infrastructure around the hyperscale data center like a co located one would be. Speaker 300:25:51Specifically to our utility at PSE and G, we are seeing quite a bit of activity that's taken place. We think about things and every utility is a little bit different as to what a commitment is. Some folks would count a commitment as only when they have a deposit for construction. Some would say a commitment is when you begin engineering work. Some would say just getting a lead in with some other financing that you need to do to get the utility to respond might be a commitment. Speaker 300:26:22The way we think about it is those that are actually have moved on beyond the engineering phase and we're seeing several 100 megawatts of data centers that are moving into that scenario here in New Jersey. And I would give you a little more breadth on that one, which is they all come in different sizes and shapes, not only what the needs are at the location from a power standpoint, it'd be in different sizes, but actually the infrastructure that is required to support them are different based upon where they may be going, whether it's a greenfield, a brownfield or an existing building that has enough capacity already run to it. So everyone's a little bit different, everyone's a little different size, but it's taken place and it's significant for us. Speaker 500:27:15Excellent guys. And just quickly if I can just to clarify on the Exelon efforts, should we say complaint with Talend here, Does that shift at all your thought process on any co located opportunities? Just Speaker 300:27:28no worries about here, but I'm just curious. No. Thanks, Julien, again. Look, that's not shifting us in any way, shape or form. We're committed to supporting the Governor in his efforts on economic development. Speaker 300:27:41So we are going to continue in that effort. I will say this to you. I'm a little bit concerned about co located load as it impacts other industries. If you really think about co located load, that doesn't just apply to data centers. That's for combining power plants. Speaker 300:28:04It's for cogeneration units. So depending upon where this goes, I'm much while I'm concerned about data centers, I'm just as concerned about everything from rooftop solar behind a meter to cogeneration that might be taking place. Speaker 500:28:24All right, great. Speaker 400:28:25I'll leave Speaker 500:28:25it there. Talk to you guys soon. See you soon. Speaker 400:28:28Thank you, Julien. Operator00:28:30Our next question is from the line of Shar Pourreza with Guggenheim Partners. Please proceed with your question. Speaker 700:28:36Hey, guys. Hey, Shar. How are you? Speaker 300:28:40We're great. We don't have to say welcome back to you. Speaker 500:28:45No, thank God. Speaker 700:28:47Rob, just to follow-up on Julian's question on sort of the protest at FERC against the Susquehanna ISA. Obviously, it's not going to have a bearing on you pursuing a deal, right, with artificial island. But if the protest turns into a hearing, an NOI or an RTO process, do you kind of wait before signing a deal? Speaker 300:29:14I think every deal is going to be very specific. And look, I think the way our nuclear facilities are configured, they'll be different than a nuclear facility down the street. So each one of those will be looked at differently, whether it's by PJM in its current rules that exist for co located load or FERC when they come out with some sort of a process if they do under the current challenge that's there. So no, I'm not really I don't think any would hold us up. I think what again what I just to reinforce, we're here to support the Governor of New Jersey. Speaker 300:29:58The Governor of New Jersey is focused on building out AI. He just passed and signed and he didn't pass. He just signed some tax incentives, up to $500,000,000 to attract AI businesses here to New Jersey. That just happened last week. If there's no more indication and he's all in, that would be it for me. Speaker 300:30:20And we want to be a company that's supporting the policies of the state. Okay, perfect. That's helpful. Speaker 700:30:27It's a question we've been getting from investors. And then just lastly, obviously you guys noted that the 5% to 7% growth rate kind of remains exclusive of upsides on kind of the nuclear business. So outside of kind of this data center opportunity, I guess, what progress have you made to implement some of the other upsides, right? So any thresholds we should be thinking about on upgrades as we head into sort of FIDs on some of these? Speaker 300:30:57Yes. I don't think we've really published anything, Shor, specifically. I think everything is on track. I will say that. There's nothing that has raised a red flag for us in the process as we move forward, whether it be the fuel cycle changes at Hope Creek or the upgrades that we mentioned in the prepared remarks at Salem, and certainly nothing on long term license extension. Speaker 300:31:21So all three things are moving forward and really I have not seen a bump in the road from any internal analysis or anything that we received externally. Speaker 700:31:33Okay, perfect. I appreciate it guys and big congrats on the execution. We'll be seeing you soon. Thank you. Thanks. Operator00:31:42Next question is from Michael Sullivan with Wolfe Research. Please proceed with your question. Speaker 800:31:48Hey, good morning. Speaker 300:31:49Hey, Michael. Speaker 800:31:51Hey, guys. Can you just comment, are you having discussions with your local transmission utility on an ISA for artificial island right now? Speaker 300:32:04I don't think anyone who has co located load has to have a discussion with the transmission provider until they move forward with an interconnection agreement. So I don't we have not stated that we're at that stage and we haven't filed anything. Speaker 800:32:23Okay. And then just I mean you're in maybe a little bit of a unique position in owning both unregulated generation and regulated transmission in PJM. And I don't think you all have kind of weighed in officially on the FERC docket, whereas Speaker 400:32:42it seems like the rest Speaker 800:32:43of the industry has. Any reasoning behind that or any thoughts you want to share on your views there? Speaker 300:32:49Well, Michael, it's not a contract that we're privy to. So I really didn't I don't think we feel that we have enough details to weigh in on what there there's a process at PJM that we trust will be managed correctly by PJM. If FERC sees a challenge with that process, I'm sure that they'll step in. We believe in following the rules. And so the rules that exist have some very specific steps in it. Speaker 300:33:17And if we were to go down that path, we would follow those rules. As far as weighing in on policy changes, again, I can't tell you how much we're trying to focus on supporting the Governor's economic development plans. Speaker 800:33:32Yes. No, that's super clear. I appreciate that. And then just like pivoting over to along the same lines with the state goals, any increase in stance on offshore wind in the state just in light of the Nantucket news up there? Is it still kind of full speed ahead from the governor's standpoint? Speaker 300:33:54It is from my perspective. I have not heard anything different. I know there were some challenges with the blades up there, but there was nothing that we've seen that would indicate there's anything slowing down the process here in New Jersey. In fact, I think the Governor I keep talking about his economic development initiatives and certainly offshore wind remains at the top of that priority list. Speaker 400:34:17Yes, there's an ongoing solicitation now, Michael. Speaker 300:34:21Got it. Speaker 800:34:21Okay. Thanks so much. Operator00:34:25Our next question is from the line of Nick Campanella with Barclays. Please proceed with your question. Speaker 900:34:31Hey, thanks. Hope everyone is doing well. Speaker 300:34:33Hey, Nick. Speaker 100:34:34Hey. So Speaker 900:34:35just one more on the data center contract opportunity. Just I know that you have the 3 different units and you can really cycle that as and market that as a kind of 20 fourseven offering, just given the refueling outage dynamics. But just thinking about kind of quantum of size here, does that conceptually mean that you'd be willing to sell up to a third of your total capacity? Are you trying to work to do something much more piecemeal and smaller than that? Just how should we kind of think about that? Speaker 300:35:06Yes. Look, again, and Dan, if he wants to add anything, he's just a little bit closer to this in his role with the development team. There's nothing that's that specific at this point for us. I think, look, there's so many different factors that will be involved here. It will be the ramp up that will matter. Speaker 300:35:25It's going to be whether or not I've even heard some of these data centers are considering being a demand response resource. And that would certainly change the dynamics of any conversation. There's just so much uncertainty now, Nick, as to where you would settle with anybody on any of these cases. Don't want to talk about sizing. It would be really premature. Speaker 900:35:49Totally get that. And then I guess just given PJM's auction is coming up here, I think tonight we'll get the results. But just your 5% to 7% forecast, do you just assume just constant payment from the last auction or is there already an assumption embedded in there? Thank you. Speaker 400:36:09Yes, Nick, there's assumptions that are embedded within our overall longer term plan. But if you think about what we are from a generation perspective, the nuclear units capacity is not a very significant component of the overall mix. And so there's a it is not our 5% to 7% overall from an enterprise perspective is not terribly sensitive to what that is. We'll see what comes out here. I think where the parameters seem to point and a lot of what I've read shows things may be a bit more bullish than we've seen recently, but we'll find out what that looks like at the end of the day. Speaker 400:36:42I don't expect it to be significant enough to move us within certainly outside of the range and barely move us inside of the range. Speaker 800:36:51Thanks a lot. Operator00:36:54Our next question is from the line of Jeremy Tonet with JPMorgan. Please proceed with your question. Speaker 300:36:59Hey, Jeremy. Speaker 100:37:01Hi, good morning. Speaker 300:37:02Good morning, Jeremy. Speaker 100:37:05Just wanted to circle back on data centers maybe a little bit more, if I could. Your release references increased inquiries at PSAG for data centers and the need for system investment to address this and EV charging. Could you expand a bit more on these comments? And how much is this additive to your current capital plan? Any other important points for us to think about here? Speaker 300:37:28Yes. I think we'll roll forward our capital plan at the end of the year beginning next year as we have in the past. So any updates on that front will come there. Jeremy, I'll tell you, I think the look, I'll walk you through a couple of scenarios that we're seeing in the utility space itself. One is you'll have a if anybody is familiar with Northern New Jersey, there used to be a big Nabisco plant up on in the northern part of New Jersey that doesn't exist anymore and Greenfield is there and it's near a 69 kV sub transmission line that we just built out, which is very close to a substation. Speaker 300:38:07I wouldn't expect a lot of capital required if someone was to locate something there. But if you are talking about a data center that's going to go into an old industrial site in one of the cities that has used up most of its capacity and they've chosen that location because the construction of the building is such that they won't really need to put up much capital to support all the servers that are there in the floor load and everything else that exists. And I think that one might need a little more capital that's going to be involved and it will be a little more complicated and we'll see where things play out. So every one of them are different. Right now, I would say that it's a mixed bag as to what we're seeing and where things are falling out. Speaker 300:38:55But it's positive for us in the fact that we continue to see the growth that's taken place here and we're attracting the businesses. A number of AI folks have been working with the state and we're excited about it. We're never going to be maybe as big as some of the other states are going to be just by the geographic size that we are, but I think it's going to make a difference for us here. Speaker 400:39:22Jeremy, the other thing I'd say is there's another layer as you take a look at what PJM has done from some of their competitive windows. That is data center related as well. Those are competitive solicitations. They end up in regulated transmission. You've seen us participate in those before. Speaker 400:39:41We're in Maryland, we have a $400,000,000 and change capital opportunity. And I think more of those are available to us. They're competitive. We'll see where we go. We don't count on those within our existing plan, but to the extent that those come forward, there'll be an opportunity there for us. Speaker 300:39:59Yes, I think Dan just hit on a key point Jeremy. The next PJM solicitation, I think it's referred to as window 1, is a good signal as to what's going to be required on the transmission side. Again, every last mile, sub transmission last mile investment will be different. But Dan is absolutely right. Watch that load profile change at PJM to see what's coming down the pike. Speaker 100:40:28Got it. That makes sense. And any incremental thoughts you could share on the EV side as far as impacts that could have? Speaker 300:40:35Yes. Again, we're seeing steady, slow but steady growth on the EV front. And proud to say we're not turning down any EV interconnections. We have the capacity, but we're upgrading that last mile. So that's really playing out exactly the way we expected it to. Speaker 300:40:53New Jersey is again a little bit unique in the condensed nature of our housing and our commutes. So EVs have not had same challenges and pressure that maybe the rest of the country has seen as far as the expansion that was expected. So we're trying to move along at about the pace that we thought we would and it's having the impact on the last mile about as we had planned. Speaker 100:41:24Got it. That's very helpful. And just one last one if I could and appreciate the sensitivities and limitations and what you can say at this point. But as folks make their way back from the beach over August into Labor Day, just wondering any other thoughts Speaker 400:41:38you could share with us on Speaker 100:41:39the rate case process and stakeholder discussions point out there. Just any sticking points or anything else that you could share? Speaker 300:41:47No. I really appreciate you asking that. Look, I take it as a big compliment to the team here that we're this far in and that was the first rate case question we got. So the team is executing as we expect they would execute in those conversations. And the Board of Public Utilities, as I have been saying multiple times, continues to really run a very efficient and thoughtful process. Speaker 300:42:15So I don't see there's no red flags there either. But I would point out that that recent COVID settlement that we just had was exactly the way we had thought it would play out. The fact that we expected the conversations not to become public has played out exactly that way. And so I'm just very grateful for the way this has all been portrayed. Speaker 400:42:48Got it. Great. Speaker 100:42:48Thank you for that. Hopefully, everyone can enjoy their time on the shore. Operator00:42:56Our next question is from the line of David Arcaro with Morgan Stanley. Please proceed with your question. Speaker 300:43:03Hey, good morning. Speaker 800:43:03Thanks for taking my questions. Speaker 100:43:07It sounds like there's good momentum in Speaker 1000:43:09terms of data center support from a policy perspective and maybe on the contracting front. I was just wondering if there's any time frame that you would offer in terms of when you think you could come to a co location deal? Speaker 300:43:22No, David, we really haven't gotten there. I appreciate the question. But we just try to be thoughtful about everything and make sure that the folks that we talk to are people that are aligned with the policies we have here in the state. Speaker 1000:43:40Yes, understood. Makes sense. And then in terms of the utility business request and increased data center interest at PSE and G. I was wondering, are you still seeing continued momentum? Is that backlog still growing? Speaker 1000:43:57And kind of if so, is there a time when you would anticipate taking another look at the load growth outlook that you have and CapEx plans that would be required to address it? Speaker 300:44:08Yes, David. So I referred to several 100 megawatts that are at this what I would consider to be the very firm stage that we would have. And again, every utility looks at that a little bit differently. The other two stages are even more robust than the very firm stage. The leads and the initial engineering analysis that would be done here, somewhat double or triple in each one of those stages from what we're seeing in the firm construction side. Speaker 300:44:39That makes sense, projects to look at. But we any roll forward that we have from a CapEx standpoint, we will do at the end of the year as I mentioned earlier. So we're just we're happy to see it taking place. Speaker 1000:44:58Got it. Excellent. Thanks so much for the color. Operator00:45:03Our next question is from the line of Carly Davenport with Goldman Sachs. Please proceed with your questions. Speaker 100:45:09Hey, Carly. Hey, good morning. Speaker 400:45:10Hey, Carly. Speaker 1100:45:11Hey, thanks for taking the questions. Just wanted to quickly follow-up on Jeremy's question on the call out on electric vehicles. Do you see any election related risk to the uptake of EVs in New Jersey and the potential investment needed to support that? Speaker 300:45:26No, I don't think I don't see any real risk from an investment standpoint here. I think most of those interconnections are done at the distribution level. There's not an election that's going to impact the state of New Jersey until next November. So I think the only question and we've talked about this before is, will you have 100 percent EVs by 2,035 or will we get a 50% on that test. And a 50% on that test is still going to be quite a bit of market penetration for the electric vehicle industry here. Speaker 300:46:04So I'm not concerned about an election change. Maybe it will impact some of the tax incentives and some of the other things that we have. But again, the uniqueness of our condensed and compressed service territory, I think will keep electric vehicles at the forefront. Speaker 1100:46:27Got it. Okay, great. That's helpful. And then switching gears, just I guess as you think about your nuclear fuel requirements, I know you mentioned in the slides you're covered through '26 and then have a significant portion also covered through 'twenty seven. I guess just how are you thinking about longer term supply, just in the context of the Russia waivers kind of rolling off in 'twenty eight here? Speaker 1100:46:48Just curious of your thoughts there. Speaker 300:46:49Yes. We're thinking about it quite a Speaker 400:46:51bit, Carly, and it's very topical given what you mentioned within your question. And so there's been a fair bit of work that's been ongoing to move forward and extend out over time and I would expect that maybe when we're sitting here at the next call, we'd have a little bit of an extension there we'd be able to offer. So we're aware of it on top of it. It's not the most immediate urgent thing that's going on from the standpoint of actually producing power, but we always have a lead time that we're interested in and continue to move forward on that. So, we'll continue to push that data out and give updates as we do it. Speaker 1100:47:26Great. We'll stay tuned there. Thanks so much for the time. Speaker 400:47:29Thanks, Chris. Operator00:47:31Our next question is from the line of Ryan Levine with Citi. Please proceed with your question. Speaker 1200:47:37Good morning. Speaker 300:47:37Good morning, Ryan. Good morning, Ryan. Speaker 1200:47:40For the EV program or energy efficiency program, with the 6 month extension in place, are you looking at any expansion to the energy efficiency program given the load forecast in the service territory? Yes. Speaker 300:47:56I think that triennial that we're in the middle of trying to settle that, we refer to it as EE2, I think will be that response that you're kind of inferring there that we people are going to be looking at from a policy standpoint to offset some of the other data center and other load growth. So the VPU has those filings from all the utilities here in the state, and they're taking a look at it. And I think their timeline was the end of the year to reach I think it was October timeframe to reach settlement. So I think they're on track for that and looking for some consistency across all the utilities. So again, completely aligned with the policy there and I don't expect a big jump in the next couple of weeks for ask for a new filing or anything like that. Speaker 300:48:50I would just keep an eye on the filing that is in front of them today. Speaker 1200:48:55Okay. And then in your prepared remarks, you highlighted data center feasibility study that some of your potential customers are engaging in. What's the scope of that study? And are there different legal or regulatory frameworks that are that may be deterministic around what's viable? Speaker 300:49:17Yes. No, I mean, look, a feasibility study is where we haven't gotten an official request to go out and buy the copper, the transformers, the start digging a hole to install a wire. So our engineers are out looking to see whether or not those megawatts that are being requested can be supported. And it is again, I think if you talk to every utility, we would refer to that differently with a different acronym. So and it might be at different spots in the process. Speaker 300:49:47I would say our feasibility studies are at the middle of the road for us. When it becomes real and that last couple of 100 megawatts, that's what we consider to be a new business request, an official request that comes in. And then we have leads that are coming in all the time. But both the feasibility side and the leads are about triple right now, the actual new business requests that we've started to work on. Speaker 400:50:10Yes, I think it's inherent within your question the legal and regulatory. I tend to think of it more operationally than anything else about just having the injection of that incremental need into the system and can the system handle it and what will it take for the system to handle it. Speaker 300:50:25Yes. I mean the only time it would become a regulatory issue is if there was a concern if somebody turned down whether it was a solar panel that was trying to get installed on one side or a data center because they didn't have the infrastructure to support it in a timely fashion. It might be a regulatory issue raised in that scenario. Speaker 1200:50:46Okay, great. And just to confirm, so you're saying that the Amazon connection dynamic isn't being pursued or diligence through that process? Speaker 300:51:02You're talking about hyperscale data center, we're handling through Dan's team in the commercial development side. Yes. Speaker 400:51:09To the extent there will be a difference in the approach to the extent of something that might be co located versus something that it was I think inherent within your first question, is about the feasibility study on the grid, the utility has an obligation to serve, they're figuring out the best way to do it, figuring out what has to happen from a capital perspective and from a system operation perspective. Speaker 700:51:30Thank you. Speaker 400:51:32Thanks, Ryan. Operator00:51:33Our next question is from the line of Sophie Karp with KeyBanc. Please proceed with your question. Speaker 1300:51:40Hi. Good morning, guys. Thank you for taking my question. Just kind of curious how you're formulating your PJM strategy from here on considering that you're also looking at colocation opportunities. I mean like with the next Barea auction coming up at some point this year, would you still consider bidding into it or hold back? Speaker 1300:52:03Like what's your thought on that? Speaker 400:52:06Yes, I think the data center that's co located that doesn't exist right yet Speaker 300:52:12needs to be built. Speaker 400:52:13And so that's going to take some time and that time is going to basically at some point crossover what you're looking at from a BRA. But I think where we are right now, we're either not there or we'd be adjusted at the very. So I don't think that that's quite hit a crossover point yet. So I don't think that's really critical to where we are. Speaker 1300:52:37Got it. Thank you. That's all for me. Speaker 400:52:39Thanks, Sophie. Operator00:52:42The next question is from the line of Andrew Weisel with Scotiabank. Please proceed with your question. Speaker 300:52:48Hey, Andrew. Speaker 600:52:50Hi, good morning everybody. Speaker 400:52:52Good morning, Andrew. Speaker 600:52:53First one quick one to clarify. I know you've talked about it a little bit, but of the land of the artificial island, how much of that is already leased out? And maybe you could talk a bit about just the size and shape of some of those parcels and how suitable it might be for a small number of larger facilities or a larger number of smaller facilities? Speaker 300:53:14Andrew, it's a great question, but one that we haven't really discussed and obviously we were being talking to folks and would give a handle as to what other people are thinking about. So I don't want to go down that path. But I would just say to you Speaker 600:53:29Qualitatively, I mean big picture. Speaker 300:53:31Yes. I would simply say to you this, any data center that comes in, each one of them have a unique configuration and design. Some are called some of the data centers will be comfortable with multiple stories, some are not comfortable with multiple stories. Some have certain cooling needs, others have different cooling needs. So each one of them, it'd be really hard pressed to say a 1 acre of land equals this many megawatts. Speaker 300:53:59And we're seeing multiple designs whenever we would have a conversation with anybody and they think about it. So I kind of sidestepping that specific question, but really think that's better left for the negotiating team and any conversations they're having with developers. Speaker 600:54:22Understood. Certainly not one size fits all. Then if I can ask sort of a 2 part question on the ZEC program. First question is, if we were to see the hypothetical red sweep scenario in November, would you have any concerns about the IRA and specifically the nuclear PTC being at risk? And then conversely, if you were to see data centers being co located behind the meter, obviously, the original intent of the ZEC program was to support uneconomic struggling nukes. Speaker 600:54:57The nukes are no longer struggling. So the question is, as you mentioned, the governor is trying to incentivize these tech companies to come. Would it make sense for New Jersey ratepayers for PSE and G customers to be supporting tech companies? Is there a scenario that the New Jersey program gets revamped in one way or another if we do have hyperscaler signing co located contracts? Speaker 300:55:25Yes. So again, I'll put on a couple of different hats here, one of which is actually even a customer hat. I would say to you this, first of all, the ZEC program ends next March. So start from next May, I'm sorry. So start from that scenario. Speaker 300:55:44So that we would certainly there won't be any conversations or that would take place that would we would benefit from a data center before then. 2nd, I think any company would be very hard pressed asking for a subsidy on top of a revenue stream that was similar to what was we think was just negotiated at Talend. And I'll leave my comment there. That's my customer hat being on. I would be hard pressed to think that you would pancake that on top of something else, whether it be the state subsidy or a federal subsidy. Speaker 300:56:26Federal PTC, we don't know what the definition is yet for gross revenues. And when that comes out, we'll certainly take a look at it. Again, I would be hard pressed to believe that they're going to allow a PTC payment on top of X dollar payment per megawatt hour that we're seeing in the marketplace. So there's a lot of TBDs in I just laid out for you, but there's also a little bit of just reality. And I would not be thinking that we'd be asking New Jersey ratepayers to be subsidized in tech companies. Speaker 300:57:03In fact, I would probably step in front of that conversation myself personally. Speaker 600:57:09Okay, great. So assuming things go in the direction of data centers, it would be more of a market based pricing mechanism going forward you would expect? Speaker 300:57:17I don't well, again, look, I never want to say never, but I wouldn't I can't see any other scenario. Okay, very good. Thank you. Thanks. Operator00:57:31Thank you. Our next question is from the line of Anthony Krowdell with Mizuho Securities. Please proceed with your Speaker 800:57:37question. Speaker 1400:57:38Hey, thanks for squeezing me in. I guess Carly is looking to get like an EV Iraq Camaro or something. Speaker 500:57:44I guess just quickly, you Speaker 1400:57:45guys are in a unique position where you have unregulated generation, you guys are the regulated utility in New Jersey. Just all the talk is maybe higher capacity prices, higher power prices. I mean, is there while that's going to benefit your units, but any thought on maybe the customer bill impact starts crowding out rate base investment? Like managing that line, you guys are in a unique position where you kind of will see both ends of that? Speaker 300:58:11Yes, Anthony. No, it's a great question and it's one that we've been thinking about since 2,008, right? We always go back and take a look when commodity prices were much higher and make sure that any projections we have do not put us in a position. I've said it multiple times and I'll say it again, we're because of the good economic development work that we've done in this region, not just in this state, but in this region, the income has continued to do pretty well. And if you look at the share of wallet or pocketbook that anyone would have to put up to pay their utility bills. Speaker 300:58:52It's been pretty consistent over the last 20 years. So I would expect that to remain the same. There's a lot of that information that's in our IR materials that we've gone over a bunch of times with you. So, I don't see anything that's on the horizon even in some of the conversations that are taking place that would lead me to believe that we're crowding out the required utility investment that's going to have to take place if we're going to have all this electrification. Yes. Speaker 400:59:21And I think as we kick into PTCs too, Anthony, I think it rightfully puts whatever support there may be for nuclear at the federal level, which puts on even playing field for some of the PTCs and ITCs that you see for other carbon free investments. So I think that helps as well. Speaker 1400:59:37Great. Thanks so much for taking the question. Thanks, Anthony. Operator00:59:41Thank you. Our next question is from the line of Bill Apicelli with UBS. Please proceed with your question. Speaker 300:59:47Hey, Bill. Speaker 800:59:48Hi, good morning. How are you doing? Good. Speaker 1500:59:52Just similar line of questioning, Anthony, there, but just maybe around the demand and supply balance in PJM. Speaker 300:59:59So going back to the point of you kind Speaker 1501:00:00of being on both on the generation front and on TD, I mean, how are you viewing the demand growth broadly, whether it's behind the meter or otherwise? You did make that comment earlier about proliferation of colocation deals going forward in other sectors. I mean, do you have confidence in the current PGM process to ensure adequate reliability? Speaker 301:00:23Look, I got to leave that to the experts at NERC and FERC and every place else to look at PJM and their processes. I am one of the folks who has continued to say we need to keep our eye on the ball very, very closely, right? And so that won't change. I was very happy to see PJM react to our push specifically for our projections and listen to the input that we provided them last year. I think they've started the process to look at load growth again. Speaker 301:00:56I think it's another 4 or 5 month process that they've just begun and they'll come out with that towards the end of this year, beginning of next year. I trust that everything you've heard from other utilities that are within the PJM footprint and the loan projections they said will be reflected in those forecasts. And as a result, we'll either have a need for generation that will be signaled through the capacity markets or we'll have some transmission that will be required and you'll see that come in there through the RTAP process. So I'd like to see something longer from a capacity standpoint than 3 years or a year or whatever you might want to take a look at. It's tough when we were looking at those types of things, it's tough to make a decision on building a power plant. Speaker 301:01:45We're not in that business anymore. We're simply here on the with the assets we have, the clean assets that we have today and we're going to continue on that path. Speaker 801:01:55Right. I guess maybe to that last point, Speaker 1501:01:57Ed, I mean some companies within PJM have contemplated maybe pursuing legislation that could allow for regulated generation and rate base at some point, right, if you feel like the system isn't or the process isn't Speaker 301:02:09Yes, I think they may be closer to conversations they're having with PJM and they may have more frustrations about how PJM is listening to them. We were pretty vocal and we got a decent response last year. So I don't want to really weigh in on what their conversations may be. And I think I might be doing that if I weigh in on their generation. Speaker 1501:02:33I guess the question is for you, right? I mean would that be a path you would ever consider? Speaker 301:02:39From our standpoint, look, I have said multiple times, Bill, we have more than enough CapEx to have our 5% to 7% growth rate with our replacement activities. If the state of New Jersey or the federal government says, hey, listen, we'd like utilities to go do that, we would certainly listen to those requests. But we like putting pipe in the ground and wires in the air right now. And I'm not we're not in the business of building new rotating equipment. So if that happens, we certainly could put that skill set. Speaker 301:03:11We have it. We could restart it if we needed to, but we're counting on the marketplace that we're in to resolve it right now. Speaker 1501:03:19Understood. Thank you very much. Operator01:03:24Okay. That's good, Mr. LaRosa. Speaker 301:03:26Yes. I think that's it for the call, correct, timing wise? Operator01:03:29Correct. Yes, I was just going to hand the floor back to you for closing comments. Speaker 301:03:33All right, great. Well, listen, great conversation. I really appreciate everybody calling in and appreciate the Q and A section obviously was robust. I do want to just make one comment at the end here. We're in our normal storm and season that takes place and I'm going to go a little bit off the script here from the standpoint that I want to thank all those that responded to the storm down in Texas and just remind us all of the hard work that's done day in and day out by the line workers that responded in Texas. Speaker 301:04:13I was taken aback, I must say, by some of the behaviors that took place from a security standpoint down at CenterPoint and in Texas in general. And I just ask you all to keep that all in mind as we go forward into the season. There's a lot lights will go out, storms will come through and there's people out there working really, really hard at some really tough conditions and let's just keep them in our thoughts and prayers. And with that, I thank you for calling in and we'll catch up with you either on the road or in 3 months. Take care. Operator01:04:48Ladies and gentlemen, this concludes today's teleconference. You may disconnect your lines at Speaker 1101:04:52this time. Thank you for your participation.Read moreRemove AdsPowered by Conference Call Audio Live Call not available Earnings Conference CallPublic Service Enterprise Group Q2 202400:00 / 00:00Speed:1x1.25x1.5x2xRemove Ads Earnings DocumentsSlide DeckPress Release(8-K)Quarterly report(10-Q) Public Service Enterprise Group Earnings HeadlinesFor Earth Day, Free Tree Event Helps Suffolk Residents Save on Energy CostsApril 15 at 2:11 PM | prnewswire.comIs Public Service Enterprise Group (PEG) the Safest Dividend Stock to Buy Now?April 13 at 6:19 PM | insidermonkey.comGet Your Bank Account “Fed Invasion” Ready with THESE 4 Simple StepsStarting as soon as a few months from now, the United States government will make a sweeping change to bank accounts nationwide. It will give them unprecedented powers to control your bank account.April 15, 2025 | Weiss Ratings (Ad)BMO Capital Sticks to Their Hold Rating for Public Service Enterprise (PEG)April 10, 2025 | markets.businessinsider.com4PEG : Where Public Service Enterprise Stands With AnalystsApril 10, 2025 | benzinga.comPublic Service Enterprise Group Inc (PEG) Hosts Event to Educate Seniors on Utility Bill SavingsApril 9, 2025 | gurufocus.comSee More Public Service Enterprise Group Headlines Get Earnings Announcements in your inboxWant to stay updated on the latest earnings announcements and upcoming reports for companies like Public Service Enterprise Group? Sign up for Earnings360's daily newsletter to receive timely earnings updates on Public Service Enterprise Group and other key companies, straight to your email. Email Address About Public Service Enterprise GroupPublic Service Enterprise Group (NYSE:PEG), through its subsidiaries, operates in electric and gas utility business in the United States. It operates through PSE&G and PSEG Power segments. The PSE&G segment transmits electricity; distributes electricity and natural gas to residential, commercial, and industrial customers; and appliance services and repairs to customers through its service territory, as well as invests in solar generation projects, and energy efficiency and related programs. The PSEG Power segment engages in nuclear generation businesses; and supplies power and natural gas to nuclear power plants and gas storage facilities activities. As of December 31, 2023, it had electric transmission and distribution system of 25,000 circuit miles and 866,600 poles; 56 switching stations with an installed capacity of 39,953 megavolt-amperes (MVA), and 235 substations with an installed capacity of 10,382 MVA; 109 MVA aggregate installed capacity for substations; four electric distribution headquarters and five electric sub-headquarters; 18,000 miles of gas mains, 12 gas distribution headquarters, two sub-headquarters, and one meter shop, as well as 56 natural gas metering and regulating stations; and 158 MegaWatts defined conditions of installed PV solar capacity. Public Service Enterprise Group Incorporated was founded in 1903 and is based in Newark, New Jersey.View Public Service Enterprise Group ProfileRead more More Earnings Resources from MarketBeat Earnings Tools Today's Earnings Tomorrow's Earnings Next Week's Earnings Upcoming Earnings Calls Earnings Newsletter Earnings Call Transcripts Earnings Beats & Misses Corporate Guidance Earnings Screener Earnings By Country U.S. Earnings Reports Canadian Earnings Reports U.K. Earnings Reports Latest Articles Why Analysts Boosted United Airlines Stock Ahead of EarningsLamb Weston Stock Rises, Earnings Provide Calm Amidst ChaosIntuitive Machines Gains After Earnings Beat, NASA Missions AheadCintas Delivers Earnings Beat, Signals More Growth AheadNike Stock Dips on Earnings: Analysts Weigh in on What’s NextAfter Massive Post Earnings Fall, Does Hope Remain for MongoDB?Semtech Rallies on Earnings Beat—Is There More Upside? Upcoming Earnings ASML (4/16/2025)CSX (4/16/2025)Abbott Laboratories (4/16/2025)Kinder Morgan (4/16/2025)Prologis (4/16/2025)Travelers Companies (4/16/2025)U.S. Bancorp (4/16/2025)Netflix (4/17/2025)American Express (4/17/2025)Blackstone (4/17/2025) Get 30 Days of MarketBeat All Access for Free Sign up for MarketBeat All Access to gain access to MarketBeat's full suite of research tools. Start Your 30-Day Trial MarketBeat All Access Features Best-in-Class Portfolio Monitoring Get personalized stock ideas. Compare portfolio to indices. Check stock news, ratings, SEC filings, and more. Stock Ideas and Recommendations See daily stock ideas from top analysts. Receive short-term trading ideas from MarketBeat. Identify trending stocks on social media. Advanced Stock Screeners and Research Tools Use our seven stock screeners to find suitable stocks. Stay informed with MarketBeat's real-time news. Export data to Excel for personal analysis. Sign in to your free account to enjoy these benefits In-depth profiles and analysis for 20,000 public companies. Real-time analyst ratings, insider transactions, earnings data, and more. Our daily ratings and market update email newsletter. Sign in to your free account to enjoy all that MarketBeat has to offer. Sign In Create Account Your Email Address: Email Address Required Your Password: Password Required Log In or Sign in with Facebook Sign in with Google Forgot your password? Your Email Address: Please enter your email address. Please enter a valid email address Choose a Password: Please enter your password. Your password must be at least 8 characters long and contain at least 1 number, 1 letter, and 1 special character. Create My Account (Free) or Sign in with Facebook Sign in with Google By creating a free account, you agree to our terms of service. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
There are 16 speakers on the call. Operator00:00:00Ladies and gentlemen, thank you for standing by. My name is Rob, and I'm your event operator today. I'd like to welcome everyone to today's conference, Public Service Enterprise Group's Second Quarter 2024 Earnings Conference Call and Webcast. At this time, all participants are in listen only mode. Later, we'll conduct a question and answer session for members of the financial community. Operator00:00:36As a reminder, this conference is being recorded today, July 30, 2024, and will be available for replay as an audio webcast on PSEG's Investor Relations website at Speaker 100:00:51https:investor.pscg.com. Operator00:00:55I would now like to turn the conference over to Carlotta Jahn. Carlotta, please go ahead. Speaker 200:01:01Good morning, and welcome PSEG's Q2 2024 Earnings Presentation. On today's call are Ralph LaRosa, Chair, President and CEO and Dan Craig, Executive Vice President and CFO. The press release, attachments and slides for today's discussion are posted on our IR website at investor. Pseg.com and our 10 Q will be filed later today. PSEG's earnings release and other matters discussed during today's call contain forward looking statements and estimates that are subject to various risks and uncertainties. Speaker 200:01:36We will also discuss non GAAP operating earnings, which differs from net income as reported in accordance with Generally Accepted Accounting Principles or GAAP in the United States. We include reconciliations of our non GAAP financial measures and a disclaimer regarding forward looking statements on our IR website and in today's materials. Following the prepared remarks, we will conduct a 30 minute question and answer session. I will now turn the call over to Ralph LaRosa. Speaker 300:02:06Thank you, Carlotta. Good morning to everyone, and thanks for joining us to review PSEG's 2nd quarter results. PSEG reported net income of $0.87 per share for the Q2 of 2024, bringing results for the first half of 2024 to $1.93 per share. This compares to net income of $1.18 per share and $3.76 per share for the 2nd quarter and first half of twenty twenty three respectively. The 2023 GAAP earnings had reflected higher mark to market gains that benefited those earnings. Speaker 300:02:43Our results for the quarter year to date periods are summarized on Slide 7 and 9 in the webcast slides. Non GAAP operating earnings were $0.63 per share for the Q2 of 2024 and $1.94 per share for the first half of the year. This compares to non GAAP operating earnings of $0.70 per share and $2.09 per share for the Q2 and first half of twenty twenty three respectively. As a reminder, our non GAAP results exclude the items shown in Attachments 89, which are included with the earnings release. Dan will provide a detailed financial review later in the call, but I want to note that the results for the 1st 6 months of 2024 are on track with our full year expectations. Speaker 300:03:30These expectations reflect the anticipated resolution of PSE and G's distribution rate case later this year and the realization of most of the increase in PSEG Power and Other's 2024 gross margin concentrated in the 4th quarter. Turning to operations for the Q2, New Jersey has experienced what may turn out to be one of the hottest summers. The early and extended heat wave we experienced last month made June 2024 the 2nd warmest June in our records. Our electric transmission and distribution system performed exceptionally well, meeting the daily load requirements. In addition, our employees provided outstanding customer care, handling double the call volume compared to the same period in 2023, responding to requests for customer service and air conditioning repairs. Speaker 300:04:22PSE and G responded to the elevated call volume and restored power to the electric customers affected by severe storms and heat related incidents, bringing them back online in under 24 hours, while responding to air conditioning service calls on average in 9 hours. Our electric and gas systems also withstood a 4.8 impact earthquake in April, which resulted in required inspections, but resulted in no operational issues. At PSEG Power, we completed the scheduled refueling of our wholly owned Hope Creek Nuclear Station on schedule, which lowered the fleet's capacity factor from over 96% in the Q1 to 82.7% for the 2nd quarter. As expected, the refueling average also reduced total generation for the Q2, but for the year to date through June, the 2 Salem units, which share the site with Hope Creek, operated at a capacity factor of 99%, keeping us on track with our full year generation forecast of 30 terawatt to 32 terawatt hours. Switching to regulatory activity. Speaker 300:05:33In May 2024, the New Jersey Board of Public Utilities, or the BPU, approved an additional extension of our Clean Energy Future, or Energy Efficiency Program of approximately $300,000,000 covering a 6 month commitment period from July of 2024 through December of 2024. And in June, the BPU approved the recovery of PSE and G's previously deferred COVID-nineteen costs over a 5 year period starting in June of 2025. We continue to participate in confidential discussions with various parties to resolve both our distribution base rate case as well as the $3,100,000,000 Energy Efficiency 2 filing. These discussions are ongoing in parallel, and we anticipate that both cases can be resolved later this year. We recently submitted the final update to the base rate case filing with actual data for the full test year. Speaker 300:06:32As a reminder, the combined electric and gas distribution rate case filing is primarily to recover incremental capital spending. We have proposed an overall revenue increase of 9% with a typical combined residential and electric and gas customer seeing a proposed increase of 12% or less than 2% compounded growth over the 6 year period. As a single state utility with dual regulatory jurisdictions, this distribution filing covers approximately 57% of our total rate base. That said, customer affordability continues to be a priority and we continue to compare favorably with our regional peers. PSE and G customers have a lower than average electric bill and the lowest gas bill in the region. Speaker 300:07:22Additionally, PSE and G recently filed with the BPU to implement another gas supply cost reduction this October, a third since January of 2023, which will further help customer affordability this coming winter. Moving on to capital investments, we remain on track to execute PSEG's 5 year $19,000,000,000 to $22,500,000,000 capital plan through 2028. The regulated portion represents $18,000,000,000 to $21,000,000,000 of the total, focused on infrastructure replacement and our award winning energy efficiency programs. PSE and G has placed into service over 2,000,000 of the 2,300,000 smart meters planned through our AMI program, still on schedule for completion by the end of this year. These investments are captured in our projections for our compound annual growth rate and rate base of 6% to 7.5% over the 2024 through 2028 period, starting from a year end 2023 rate base of 29,000,000,000 dollars which was up 10% over the prior year. Speaker 300:08:32We also continue to pursue potential incremental investment opportunities for future regulated growth. Along those lines, PSE and G has experienced an increase in new business requests and feasibility studies from potential data center customers across our service area compared with 2023 activity, which combined with increased electric vehicle charging is expected to drive load growth and system investment needs in the future. Switching to regulated transmission stations, which are scheduled for this summer, PSE and G expects that the BPU will announce the winner or winners of the pre built offshore wind infrastructure during the second half of twenty twenty four. Last month, the BPU postponed its 2nd state agreement approach process to procure transmission to support offshore wind generation, while it evaluates the impact of FERC and PJM activity on long term transmission planning, cost allocation and interconnection Q reform. The BPU may reevaluate this timing and the need for a second SAA solicitation in 6 months, which would be this coming December. Speaker 300:09:46PJM opened the 2024 Regional Transmission Expansion Plan Window 1 solicitation earlier this month, which reflects their higher load growth forecast on the 2029 to 2,032 planned horizon that has been influenced by increased electrification expectations and data center load growth throughout PJM. We are evaluating the Window 1 solicitation for potential opportunities to bid this September. Now crossing the Hudson for a moment and as expected, the Long Island Power Authority opened a request for proposals process to select a manager to operate their electric grid. Our existing operating services agreement and power supply contract with Piper runs through the end of 2025. We intend to submit proposals into their RFP process and LIPA is expected to make selections early next year. Speaker 300:10:40At PSEG Power, we are also continuing to explore opportunities for the potential sale of electricity from our nuclear facilities, pursuant to long term agreements to supply large power energy users such as data centers and hydrogen producers. In addition, we are pursuing multiple growth plans that include thermal and efficiency upgrades at our co owned Salem units that could potentially increase the combined output by up to 200 megawatts and qualify for tax credits on the current rules. Today, we are reaffirming our guidance for long term non GAAP operating earnings growth of 5% to 7% through 2028, which is based on the threshold price of the Nuclear Production Tax Credit or the PTC that also provides these units with revenue stability through 2,032. We continue to deploy the free cash from the nuclear business to help fund utility growth without the need to issue new equity or sell assets. And this continues to be a differentiating factor for us. Speaker 300:11:48Importantly, our solid balance sheet supports the execution of our capital investment program of $19,000,000,000 to $22,500,000,000 through 2028 and provides the opportunity for consistent and sustainable dividend growth. In summarizing the 1st 6 months of the year, solid execution is driving our expected results. We have settled 2 regulatory proceedings in the past quarter, and we are working to resolve our pending base rate case and the E2 filings later this year. We are also advancing our 5 year capital investment plan focused on infrastructure modernization and energy efficiency initiatives. These investments will help prepare our system for greater electrification of transportation, homes and workplaces, while also reducing greenhouse gas emissions and helping to lower customer bills. Speaker 300:12:37Last but certainly not least, I want to thank our employees for all they do. Their tireless efforts have helped us to maintain best in class operating statistics and customer service, especially through the challenging heat wave we have seen this year. I'll now turn the call over to Dan to discuss our financial results and outlook in greater detail and we'll be available for your questions after his remarks. Speaker 400:13:00Great. Thank you, Ralph. Good morning, everybody. As Ralph mentioned earlier, PSEG reported net income of $0.87 per share for the 2nd quarter of 2024 and that compares to $1.18 per share in 2023. Non GAAP operating earnings were 0.6 $3 per share in the Q2 of 2024 compared to $0.70 per share in 2023. Speaker 400:13:24Slide 79 detail the contribution to non GAAP operating earnings per share by business segment for the Q2 and first half of twenty twenty four. Slides 8 and 10 contain waterfall charts that will take you through the net changes for the quarter over quarter 6 month periods in non GAAP operating earnings per share by major business. Starting with PSE and G, which reported 2nd quarter net income of $0.60 per share for 2024 compared to $0.67 per share in 2023. PSE and G had non GAAP operating earnings of $0.60 per share for the Q2 of 2024 compared to $0.68 per share in 2023. The main drivers for both net income and non GAAP results for the quarter were growth in rate base from higher regulated investments, offset by higher investment related depreciation and interest expense, awaiting rate recovery in our pending rate case, as well as higher O and M costs due to regulatory, safety and weather related activities. Speaker 400:14:33Compared to the Q2 of 2023, electric margin increased by $0.02 per share due to customer growth in the Conservation Incentive Program or SIP and our final Energy Strong II recovery and energy efficiency investment of $0.01 per share higher. Other distribution margin added $0.02 per share, while transmission margin declined by $0.02 per share due to timing of revenue at O and M including our annual true up. Ralph referred to the heat wave we experienced in June and this warmer weather combined with greater storm activity led to higher corrective maintenance costs during the quarter. Distribution L and M expense increased by $0.04 per share compared to the Q2 of 2023 also due to higher gas meter inspections and safety costs. Depreciation and interest expense increased by $0.01 per share and $0.02 per share respectively compared to the Q2 of 2023 reflecting continued growth in investment and higher interest expense. Speaker 400:15:39Lower pension and OPEB income resulting from the cessation of OPEB related credits, which ended in 2023 resulted in a $0.01 per share unfavorable comparison to the year earlier quarter. Lastly, the timing of taxes recorded through an annual effective tax rate, which nets to 0 over a full year and other taxes had a net unfavorable impact of $0.03 per share in the quarter compared to 2023. Summer weather in the Q2 as measured by the temperature humidity index was 42% warmer than normal and 99% warmer than the Q2 of 2023. In fact, the Q2 of 2024 was the warmest Q2 in our records going back 55 years, mostly due to that June heat wave. As a reminder, weather variations have minimal impact on our utility margin because of the conservation incentive program or SIP mechanism, which limits the impact of weather and other sales variances, positive or negative, on electric and gas margins, while helping PSE and G broadly promote the adoption of its energy efficiency program. Speaker 400:16:51The number of electric and gas customers, which is the driver of margin under the SIP mechanism, continued to grow by approximately 1% each over the past year. On capital spending, PSE and G invested approximately $900,000,000 during the 2nd quarter and we remain on track to execute on our 2024 regulated capital investment plan of $3,400,000,000 It's focused on infrastructure modernization and decarbonization initiatives. These include upgrades and replacements to our T and D facilities, last mile spend in the infrastructure advancement program, ongoing gas infrastructure replacement spending and the continued clean energy investments across EE, smart meter installation and EV make ready infrastructure. We are reaffirming our 5 year regulated capital investment plan of $18,000,000,000 to $21,000,000,000 from 20.24 to 2028. The high end of this plan includes the $3,100,000,000 CES Energy Efficiency 2 filing made December 2023 that would enable commitments from January 25 to June 27 based on the BPU's EE framework. Speaker 400:18:09As Ralph said earlier, this proceeding is expected to be resolved at the BPU later this year. Moving to PSEG Power and Other. For the Q2 of 2024, PSEG Power and Other reported net income of $0.27 per share compared to $0.51 per share for the Q2 of 2023. Non GAAP operating earnings were 0 point 2024 compared to non GAAP operating earnings of $0.02 per share for the Q2 of 2023. In the Q2 of 2024, net energy margin rose by $0.08 per share driven by nuclear including the net impact of the nuclear PTC that took effect January 1, 2024, partially offset by the anticipated reduction in generation due to the Hope Creek outage and capacity revenue. Speaker 400:19:04As a reminder, for 2024, there will be a shape to our quarterly results as we move through the remainder of the year. We anticipate realizing most of the increase in the 2024 gross margin over 2023 gross margin during the second half of the year, specifically in the Q4 based upon the shape of our underlying hedges. This differs from last year when PSEG Power realized most of the step up in the annual hedge price in the Q1 of 2023. O and M increased by $0.05 per share, mostly driven by the scheduled refueling at our 100% owned Hope Creek Nuclear Unit. Interest expense was $0.01 unfavorable reflecting incremental debt at higher rates and taxes and other were $0.01 per share unfavorable compared to the second quarter of 2023, primarily reflecting the use of a higher effective tax rate in the quarter that will reverse over the balance of 2024. Speaker 400:20:03On the operating side, the nuclear fleet produced approximately 7 terawatt hours during the Q2 of 2024 compared to 7.7 terawatt hours in the year earlier period and ran at a capacity factor of 82.7%. Nuclear generation in the first half of twenty twenty four totaled 15.2 terawatt hours, which was impacted by the Hoke Creek refueling, but also benefited from high capacity factor performance at our 2 Salem units, which operated at 98.9% for the quarter and at 99.3% for the first half of twenty twenty four. Touching on some recent financing activity. As of the end of June, PSEG had total available liquidity of $3,100,000,000 including $113,000,000 of cash on hand. Following the issuance of $1,250,000,000 of PSEG senior notes in March, during the Q2 PSEG paid off $500,000,000 of a 3 64 day term loan in April $750,000,000 of PSEG senior notes in June. Speaker 400:21:13With the PSEG term loan redemption in March, PSEG's variable rate debt at the end of June consisted of a $1,250,000,000 term loan maturing March 2025, the entirety of which has been swapped out from a variable rate to a fixed rate to mitigate the fluctuations in interest rates. At the end of June, given our swaps, we had minimal variable rate debt. On the credit ratings front, in June Moody's updated PSEG Power's outlook to stable from positive and this change is consistent with our future plans for leverage and our targeted credit rating. We continue to maintain a solid Baa2 investment grade rating at PSEG Power. In closing, we are reaffirming PSEG's full year 2024 non GAAP operating earnings guidance of $3.60 to $3.70 per share, which reflects continued rate base growth from ongoing regulated investments, offset by higher depreciation and interest as we await resolution of our pending distribution rate case later this year. Speaker 400:22:24We are also reaffirming our forecast of long term 5% to 7% compound annual growth in non GAAP operating earnings through 2028, supported by our capital investment programs and the Nuclear PTC. This concludes our formal remarks and we are now ready to begin the question and answer session. Operator00:22:48Thank you. Ladies and gentlemen, we'll now begin the question and answer session for members of the financial community. The first question is from Julien Dumoulin Smith with Jefferies. Please proceed with your question. Speaker 500:23:21Good morning, team. Thank you guys for the time. It's nice to chat again. Speaker 300:23:24Well, it's good to hear you again. Speaker 500:23:28Back in action, as they say. Look guys, nicely done, seriously. A bunch of questions here on what you guys just said. First off, just talking about the data center opportunity as is the buzz these days. Can you elaborate a little Speaker 600:23:44bit on what you're seeing today Speaker 500:23:45about your co located opportunities? And how are you thinking about the economic benefit criteria that you would and other stakeholders would like to see contribute to the local community here? Obviously, that's a key element of bringing jobs to New Jersey here. So can you elaborate on that? And then separately related, how would you characterize demand for data centers outside of perhaps co located opportunities in New Jersey today? Speaker 500:24:11Any kind of quantifiable commitment numbers or soft numbers that you would kind of see today that you care to share? Speaker 300:24:20Yes, that's great. Thanks for that, Julian, and again, welcome back. Look, I would say a couple of things to you. I'm going to answer your first question with purely my choose New Jersey economic development hat on. And that is that it really has a couple of benefits of co located data center. Speaker 300:24:39And it's not necessarily just that it's co located, it's the fact that it's a hyperscale data center. It's going to provide a clear signal to AI companies that are looking to locate here in New Jersey and in the region that the infrastructure is here up and running and ready to go for their businesses to thrive. So there'll be a lot of, I would say, trickled down opportunities that get created. Specific to the site, you obviously have your construction activities, but not the least of which would be driven by wire work that the IBWs here in New Jersey would benefit from. So there's a lot of local opportunities that take place from the construction activities. Speaker 300:25:26They are one time. But as you've heard from others, they do grow over that one time. It's not all done in 1 month, it's over several years. They ramp up these data centers. And then there's a lot of other opportunities that happen for edge computing or AI infrastructure around the hyperscale data center like a co located one would be. Speaker 300:25:51Specifically to our utility at PSE and G, we are seeing quite a bit of activity that's taken place. We think about things and every utility is a little bit different as to what a commitment is. Some folks would count a commitment as only when they have a deposit for construction. Some would say a commitment is when you begin engineering work. Some would say just getting a lead in with some other financing that you need to do to get the utility to respond might be a commitment. Speaker 300:26:22The way we think about it is those that are actually have moved on beyond the engineering phase and we're seeing several 100 megawatts of data centers that are moving into that scenario here in New Jersey. And I would give you a little more breadth on that one, which is they all come in different sizes and shapes, not only what the needs are at the location from a power standpoint, it'd be in different sizes, but actually the infrastructure that is required to support them are different based upon where they may be going, whether it's a greenfield, a brownfield or an existing building that has enough capacity already run to it. So everyone's a little bit different, everyone's a little different size, but it's taken place and it's significant for us. Speaker 500:27:15Excellent guys. And just quickly if I can just to clarify on the Exelon efforts, should we say complaint with Talend here, Does that shift at all your thought process on any co located opportunities? Just Speaker 300:27:28no worries about here, but I'm just curious. No. Thanks, Julien, again. Look, that's not shifting us in any way, shape or form. We're committed to supporting the Governor in his efforts on economic development. Speaker 300:27:41So we are going to continue in that effort. I will say this to you. I'm a little bit concerned about co located load as it impacts other industries. If you really think about co located load, that doesn't just apply to data centers. That's for combining power plants. Speaker 300:28:04It's for cogeneration units. So depending upon where this goes, I'm much while I'm concerned about data centers, I'm just as concerned about everything from rooftop solar behind a meter to cogeneration that might be taking place. Speaker 500:28:24All right, great. Speaker 400:28:25I'll leave Speaker 500:28:25it there. Talk to you guys soon. See you soon. Speaker 400:28:28Thank you, Julien. Operator00:28:30Our next question is from the line of Shar Pourreza with Guggenheim Partners. Please proceed with your question. Speaker 700:28:36Hey, guys. Hey, Shar. How are you? Speaker 300:28:40We're great. We don't have to say welcome back to you. Speaker 500:28:45No, thank God. Speaker 700:28:47Rob, just to follow-up on Julian's question on sort of the protest at FERC against the Susquehanna ISA. Obviously, it's not going to have a bearing on you pursuing a deal, right, with artificial island. But if the protest turns into a hearing, an NOI or an RTO process, do you kind of wait before signing a deal? Speaker 300:29:14I think every deal is going to be very specific. And look, I think the way our nuclear facilities are configured, they'll be different than a nuclear facility down the street. So each one of those will be looked at differently, whether it's by PJM in its current rules that exist for co located load or FERC when they come out with some sort of a process if they do under the current challenge that's there. So no, I'm not really I don't think any would hold us up. I think what again what I just to reinforce, we're here to support the Governor of New Jersey. Speaker 300:29:58The Governor of New Jersey is focused on building out AI. He just passed and signed and he didn't pass. He just signed some tax incentives, up to $500,000,000 to attract AI businesses here to New Jersey. That just happened last week. If there's no more indication and he's all in, that would be it for me. Speaker 300:30:20And we want to be a company that's supporting the policies of the state. Okay, perfect. That's helpful. Speaker 700:30:27It's a question we've been getting from investors. And then just lastly, obviously you guys noted that the 5% to 7% growth rate kind of remains exclusive of upsides on kind of the nuclear business. So outside of kind of this data center opportunity, I guess, what progress have you made to implement some of the other upsides, right? So any thresholds we should be thinking about on upgrades as we head into sort of FIDs on some of these? Speaker 300:30:57Yes. I don't think we've really published anything, Shor, specifically. I think everything is on track. I will say that. There's nothing that has raised a red flag for us in the process as we move forward, whether it be the fuel cycle changes at Hope Creek or the upgrades that we mentioned in the prepared remarks at Salem, and certainly nothing on long term license extension. Speaker 300:31:21So all three things are moving forward and really I have not seen a bump in the road from any internal analysis or anything that we received externally. Speaker 700:31:33Okay, perfect. I appreciate it guys and big congrats on the execution. We'll be seeing you soon. Thank you. Thanks. Operator00:31:42Next question is from Michael Sullivan with Wolfe Research. Please proceed with your question. Speaker 800:31:48Hey, good morning. Speaker 300:31:49Hey, Michael. Speaker 800:31:51Hey, guys. Can you just comment, are you having discussions with your local transmission utility on an ISA for artificial island right now? Speaker 300:32:04I don't think anyone who has co located load has to have a discussion with the transmission provider until they move forward with an interconnection agreement. So I don't we have not stated that we're at that stage and we haven't filed anything. Speaker 800:32:23Okay. And then just I mean you're in maybe a little bit of a unique position in owning both unregulated generation and regulated transmission in PJM. And I don't think you all have kind of weighed in officially on the FERC docket, whereas Speaker 400:32:42it seems like the rest Speaker 800:32:43of the industry has. Any reasoning behind that or any thoughts you want to share on your views there? Speaker 300:32:49Well, Michael, it's not a contract that we're privy to. So I really didn't I don't think we feel that we have enough details to weigh in on what there there's a process at PJM that we trust will be managed correctly by PJM. If FERC sees a challenge with that process, I'm sure that they'll step in. We believe in following the rules. And so the rules that exist have some very specific steps in it. Speaker 300:33:17And if we were to go down that path, we would follow those rules. As far as weighing in on policy changes, again, I can't tell you how much we're trying to focus on supporting the Governor's economic development plans. Speaker 800:33:32Yes. No, that's super clear. I appreciate that. And then just like pivoting over to along the same lines with the state goals, any increase in stance on offshore wind in the state just in light of the Nantucket news up there? Is it still kind of full speed ahead from the governor's standpoint? Speaker 300:33:54It is from my perspective. I have not heard anything different. I know there were some challenges with the blades up there, but there was nothing that we've seen that would indicate there's anything slowing down the process here in New Jersey. In fact, I think the Governor I keep talking about his economic development initiatives and certainly offshore wind remains at the top of that priority list. Speaker 400:34:17Yes, there's an ongoing solicitation now, Michael. Speaker 300:34:21Got it. Speaker 800:34:21Okay. Thanks so much. Operator00:34:25Our next question is from the line of Nick Campanella with Barclays. Please proceed with your question. Speaker 900:34:31Hey, thanks. Hope everyone is doing well. Speaker 300:34:33Hey, Nick. Speaker 100:34:34Hey. So Speaker 900:34:35just one more on the data center contract opportunity. Just I know that you have the 3 different units and you can really cycle that as and market that as a kind of 20 fourseven offering, just given the refueling outage dynamics. But just thinking about kind of quantum of size here, does that conceptually mean that you'd be willing to sell up to a third of your total capacity? Are you trying to work to do something much more piecemeal and smaller than that? Just how should we kind of think about that? Speaker 300:35:06Yes. Look, again, and Dan, if he wants to add anything, he's just a little bit closer to this in his role with the development team. There's nothing that's that specific at this point for us. I think, look, there's so many different factors that will be involved here. It will be the ramp up that will matter. Speaker 300:35:25It's going to be whether or not I've even heard some of these data centers are considering being a demand response resource. And that would certainly change the dynamics of any conversation. There's just so much uncertainty now, Nick, as to where you would settle with anybody on any of these cases. Don't want to talk about sizing. It would be really premature. Speaker 900:35:49Totally get that. And then I guess just given PJM's auction is coming up here, I think tonight we'll get the results. But just your 5% to 7% forecast, do you just assume just constant payment from the last auction or is there already an assumption embedded in there? Thank you. Speaker 400:36:09Yes, Nick, there's assumptions that are embedded within our overall longer term plan. But if you think about what we are from a generation perspective, the nuclear units capacity is not a very significant component of the overall mix. And so there's a it is not our 5% to 7% overall from an enterprise perspective is not terribly sensitive to what that is. We'll see what comes out here. I think where the parameters seem to point and a lot of what I've read shows things may be a bit more bullish than we've seen recently, but we'll find out what that looks like at the end of the day. Speaker 400:36:42I don't expect it to be significant enough to move us within certainly outside of the range and barely move us inside of the range. Speaker 800:36:51Thanks a lot. Operator00:36:54Our next question is from the line of Jeremy Tonet with JPMorgan. Please proceed with your question. Speaker 300:36:59Hey, Jeremy. Speaker 100:37:01Hi, good morning. Speaker 300:37:02Good morning, Jeremy. Speaker 100:37:05Just wanted to circle back on data centers maybe a little bit more, if I could. Your release references increased inquiries at PSAG for data centers and the need for system investment to address this and EV charging. Could you expand a bit more on these comments? And how much is this additive to your current capital plan? Any other important points for us to think about here? Speaker 300:37:28Yes. I think we'll roll forward our capital plan at the end of the year beginning next year as we have in the past. So any updates on that front will come there. Jeremy, I'll tell you, I think the look, I'll walk you through a couple of scenarios that we're seeing in the utility space itself. One is you'll have a if anybody is familiar with Northern New Jersey, there used to be a big Nabisco plant up on in the northern part of New Jersey that doesn't exist anymore and Greenfield is there and it's near a 69 kV sub transmission line that we just built out, which is very close to a substation. Speaker 300:38:07I wouldn't expect a lot of capital required if someone was to locate something there. But if you are talking about a data center that's going to go into an old industrial site in one of the cities that has used up most of its capacity and they've chosen that location because the construction of the building is such that they won't really need to put up much capital to support all the servers that are there in the floor load and everything else that exists. And I think that one might need a little more capital that's going to be involved and it will be a little more complicated and we'll see where things play out. So every one of them are different. Right now, I would say that it's a mixed bag as to what we're seeing and where things are falling out. Speaker 300:38:55But it's positive for us in the fact that we continue to see the growth that's taken place here and we're attracting the businesses. A number of AI folks have been working with the state and we're excited about it. We're never going to be maybe as big as some of the other states are going to be just by the geographic size that we are, but I think it's going to make a difference for us here. Speaker 400:39:22Jeremy, the other thing I'd say is there's another layer as you take a look at what PJM has done from some of their competitive windows. That is data center related as well. Those are competitive solicitations. They end up in regulated transmission. You've seen us participate in those before. Speaker 400:39:41We're in Maryland, we have a $400,000,000 and change capital opportunity. And I think more of those are available to us. They're competitive. We'll see where we go. We don't count on those within our existing plan, but to the extent that those come forward, there'll be an opportunity there for us. Speaker 300:39:59Yes, I think Dan just hit on a key point Jeremy. The next PJM solicitation, I think it's referred to as window 1, is a good signal as to what's going to be required on the transmission side. Again, every last mile, sub transmission last mile investment will be different. But Dan is absolutely right. Watch that load profile change at PJM to see what's coming down the pike. Speaker 100:40:28Got it. That makes sense. And any incremental thoughts you could share on the EV side as far as impacts that could have? Speaker 300:40:35Yes. Again, we're seeing steady, slow but steady growth on the EV front. And proud to say we're not turning down any EV interconnections. We have the capacity, but we're upgrading that last mile. So that's really playing out exactly the way we expected it to. Speaker 300:40:53New Jersey is again a little bit unique in the condensed nature of our housing and our commutes. So EVs have not had same challenges and pressure that maybe the rest of the country has seen as far as the expansion that was expected. So we're trying to move along at about the pace that we thought we would and it's having the impact on the last mile about as we had planned. Speaker 100:41:24Got it. That's very helpful. And just one last one if I could and appreciate the sensitivities and limitations and what you can say at this point. But as folks make their way back from the beach over August into Labor Day, just wondering any other thoughts Speaker 400:41:38you could share with us on Speaker 100:41:39the rate case process and stakeholder discussions point out there. Just any sticking points or anything else that you could share? Speaker 300:41:47No. I really appreciate you asking that. Look, I take it as a big compliment to the team here that we're this far in and that was the first rate case question we got. So the team is executing as we expect they would execute in those conversations. And the Board of Public Utilities, as I have been saying multiple times, continues to really run a very efficient and thoughtful process. Speaker 300:42:15So I don't see there's no red flags there either. But I would point out that that recent COVID settlement that we just had was exactly the way we had thought it would play out. The fact that we expected the conversations not to become public has played out exactly that way. And so I'm just very grateful for the way this has all been portrayed. Speaker 400:42:48Got it. Great. Speaker 100:42:48Thank you for that. Hopefully, everyone can enjoy their time on the shore. Operator00:42:56Our next question is from the line of David Arcaro with Morgan Stanley. Please proceed with your question. Speaker 300:43:03Hey, good morning. Speaker 800:43:03Thanks for taking my questions. Speaker 100:43:07It sounds like there's good momentum in Speaker 1000:43:09terms of data center support from a policy perspective and maybe on the contracting front. I was just wondering if there's any time frame that you would offer in terms of when you think you could come to a co location deal? Speaker 300:43:22No, David, we really haven't gotten there. I appreciate the question. But we just try to be thoughtful about everything and make sure that the folks that we talk to are people that are aligned with the policies we have here in the state. Speaker 1000:43:40Yes, understood. Makes sense. And then in terms of the utility business request and increased data center interest at PSE and G. I was wondering, are you still seeing continued momentum? Is that backlog still growing? Speaker 1000:43:57And kind of if so, is there a time when you would anticipate taking another look at the load growth outlook that you have and CapEx plans that would be required to address it? Speaker 300:44:08Yes, David. So I referred to several 100 megawatts that are at this what I would consider to be the very firm stage that we would have. And again, every utility looks at that a little bit differently. The other two stages are even more robust than the very firm stage. The leads and the initial engineering analysis that would be done here, somewhat double or triple in each one of those stages from what we're seeing in the firm construction side. Speaker 300:44:39That makes sense, projects to look at. But we any roll forward that we have from a CapEx standpoint, we will do at the end of the year as I mentioned earlier. So we're just we're happy to see it taking place. Speaker 1000:44:58Got it. Excellent. Thanks so much for the color. Operator00:45:03Our next question is from the line of Carly Davenport with Goldman Sachs. Please proceed with your questions. Speaker 100:45:09Hey, Carly. Hey, good morning. Speaker 400:45:10Hey, Carly. Speaker 1100:45:11Hey, thanks for taking the questions. Just wanted to quickly follow-up on Jeremy's question on the call out on electric vehicles. Do you see any election related risk to the uptake of EVs in New Jersey and the potential investment needed to support that? Speaker 300:45:26No, I don't think I don't see any real risk from an investment standpoint here. I think most of those interconnections are done at the distribution level. There's not an election that's going to impact the state of New Jersey until next November. So I think the only question and we've talked about this before is, will you have 100 percent EVs by 2,035 or will we get a 50% on that test. And a 50% on that test is still going to be quite a bit of market penetration for the electric vehicle industry here. Speaker 300:46:04So I'm not concerned about an election change. Maybe it will impact some of the tax incentives and some of the other things that we have. But again, the uniqueness of our condensed and compressed service territory, I think will keep electric vehicles at the forefront. Speaker 1100:46:27Got it. Okay, great. That's helpful. And then switching gears, just I guess as you think about your nuclear fuel requirements, I know you mentioned in the slides you're covered through '26 and then have a significant portion also covered through 'twenty seven. I guess just how are you thinking about longer term supply, just in the context of the Russia waivers kind of rolling off in 'twenty eight here? Speaker 1100:46:48Just curious of your thoughts there. Speaker 300:46:49Yes. We're thinking about it quite a Speaker 400:46:51bit, Carly, and it's very topical given what you mentioned within your question. And so there's been a fair bit of work that's been ongoing to move forward and extend out over time and I would expect that maybe when we're sitting here at the next call, we'd have a little bit of an extension there we'd be able to offer. So we're aware of it on top of it. It's not the most immediate urgent thing that's going on from the standpoint of actually producing power, but we always have a lead time that we're interested in and continue to move forward on that. So, we'll continue to push that data out and give updates as we do it. Speaker 1100:47:26Great. We'll stay tuned there. Thanks so much for the time. Speaker 400:47:29Thanks, Chris. Operator00:47:31Our next question is from the line of Ryan Levine with Citi. Please proceed with your question. Speaker 1200:47:37Good morning. Speaker 300:47:37Good morning, Ryan. Good morning, Ryan. Speaker 1200:47:40For the EV program or energy efficiency program, with the 6 month extension in place, are you looking at any expansion to the energy efficiency program given the load forecast in the service territory? Yes. Speaker 300:47:56I think that triennial that we're in the middle of trying to settle that, we refer to it as EE2, I think will be that response that you're kind of inferring there that we people are going to be looking at from a policy standpoint to offset some of the other data center and other load growth. So the VPU has those filings from all the utilities here in the state, and they're taking a look at it. And I think their timeline was the end of the year to reach I think it was October timeframe to reach settlement. So I think they're on track for that and looking for some consistency across all the utilities. So again, completely aligned with the policy there and I don't expect a big jump in the next couple of weeks for ask for a new filing or anything like that. Speaker 300:48:50I would just keep an eye on the filing that is in front of them today. Speaker 1200:48:55Okay. And then in your prepared remarks, you highlighted data center feasibility study that some of your potential customers are engaging in. What's the scope of that study? And are there different legal or regulatory frameworks that are that may be deterministic around what's viable? Speaker 300:49:17Yes. No, I mean, look, a feasibility study is where we haven't gotten an official request to go out and buy the copper, the transformers, the start digging a hole to install a wire. So our engineers are out looking to see whether or not those megawatts that are being requested can be supported. And it is again, I think if you talk to every utility, we would refer to that differently with a different acronym. So and it might be at different spots in the process. Speaker 300:49:47I would say our feasibility studies are at the middle of the road for us. When it becomes real and that last couple of 100 megawatts, that's what we consider to be a new business request, an official request that comes in. And then we have leads that are coming in all the time. But both the feasibility side and the leads are about triple right now, the actual new business requests that we've started to work on. Speaker 400:50:10Yes, I think it's inherent within your question the legal and regulatory. I tend to think of it more operationally than anything else about just having the injection of that incremental need into the system and can the system handle it and what will it take for the system to handle it. Speaker 300:50:25Yes. I mean the only time it would become a regulatory issue is if there was a concern if somebody turned down whether it was a solar panel that was trying to get installed on one side or a data center because they didn't have the infrastructure to support it in a timely fashion. It might be a regulatory issue raised in that scenario. Speaker 1200:50:46Okay, great. And just to confirm, so you're saying that the Amazon connection dynamic isn't being pursued or diligence through that process? Speaker 300:51:02You're talking about hyperscale data center, we're handling through Dan's team in the commercial development side. Yes. Speaker 400:51:09To the extent there will be a difference in the approach to the extent of something that might be co located versus something that it was I think inherent within your first question, is about the feasibility study on the grid, the utility has an obligation to serve, they're figuring out the best way to do it, figuring out what has to happen from a capital perspective and from a system operation perspective. Speaker 700:51:30Thank you. Speaker 400:51:32Thanks, Ryan. Operator00:51:33Our next question is from the line of Sophie Karp with KeyBanc. Please proceed with your question. Speaker 1300:51:40Hi. Good morning, guys. Thank you for taking my question. Just kind of curious how you're formulating your PJM strategy from here on considering that you're also looking at colocation opportunities. I mean like with the next Barea auction coming up at some point this year, would you still consider bidding into it or hold back? Speaker 1300:52:03Like what's your thought on that? Speaker 400:52:06Yes, I think the data center that's co located that doesn't exist right yet Speaker 300:52:12needs to be built. Speaker 400:52:13And so that's going to take some time and that time is going to basically at some point crossover what you're looking at from a BRA. But I think where we are right now, we're either not there or we'd be adjusted at the very. So I don't think that that's quite hit a crossover point yet. So I don't think that's really critical to where we are. Speaker 1300:52:37Got it. Thank you. That's all for me. Speaker 400:52:39Thanks, Sophie. Operator00:52:42The next question is from the line of Andrew Weisel with Scotiabank. Please proceed with your question. Speaker 300:52:48Hey, Andrew. Speaker 600:52:50Hi, good morning everybody. Speaker 400:52:52Good morning, Andrew. Speaker 600:52:53First one quick one to clarify. I know you've talked about it a little bit, but of the land of the artificial island, how much of that is already leased out? And maybe you could talk a bit about just the size and shape of some of those parcels and how suitable it might be for a small number of larger facilities or a larger number of smaller facilities? Speaker 300:53:14Andrew, it's a great question, but one that we haven't really discussed and obviously we were being talking to folks and would give a handle as to what other people are thinking about. So I don't want to go down that path. But I would just say to you Speaker 600:53:29Qualitatively, I mean big picture. Speaker 300:53:31Yes. I would simply say to you this, any data center that comes in, each one of them have a unique configuration and design. Some are called some of the data centers will be comfortable with multiple stories, some are not comfortable with multiple stories. Some have certain cooling needs, others have different cooling needs. So each one of them, it'd be really hard pressed to say a 1 acre of land equals this many megawatts. Speaker 300:53:59And we're seeing multiple designs whenever we would have a conversation with anybody and they think about it. So I kind of sidestepping that specific question, but really think that's better left for the negotiating team and any conversations they're having with developers. Speaker 600:54:22Understood. Certainly not one size fits all. Then if I can ask sort of a 2 part question on the ZEC program. First question is, if we were to see the hypothetical red sweep scenario in November, would you have any concerns about the IRA and specifically the nuclear PTC being at risk? And then conversely, if you were to see data centers being co located behind the meter, obviously, the original intent of the ZEC program was to support uneconomic struggling nukes. Speaker 600:54:57The nukes are no longer struggling. So the question is, as you mentioned, the governor is trying to incentivize these tech companies to come. Would it make sense for New Jersey ratepayers for PSE and G customers to be supporting tech companies? Is there a scenario that the New Jersey program gets revamped in one way or another if we do have hyperscaler signing co located contracts? Speaker 300:55:25Yes. So again, I'll put on a couple of different hats here, one of which is actually even a customer hat. I would say to you this, first of all, the ZEC program ends next March. So start from next May, I'm sorry. So start from that scenario. Speaker 300:55:44So that we would certainly there won't be any conversations or that would take place that would we would benefit from a data center before then. 2nd, I think any company would be very hard pressed asking for a subsidy on top of a revenue stream that was similar to what was we think was just negotiated at Talend. And I'll leave my comment there. That's my customer hat being on. I would be hard pressed to think that you would pancake that on top of something else, whether it be the state subsidy or a federal subsidy. Speaker 300:56:26Federal PTC, we don't know what the definition is yet for gross revenues. And when that comes out, we'll certainly take a look at it. Again, I would be hard pressed to believe that they're going to allow a PTC payment on top of X dollar payment per megawatt hour that we're seeing in the marketplace. So there's a lot of TBDs in I just laid out for you, but there's also a little bit of just reality. And I would not be thinking that we'd be asking New Jersey ratepayers to be subsidized in tech companies. Speaker 300:57:03In fact, I would probably step in front of that conversation myself personally. Speaker 600:57:09Okay, great. So assuming things go in the direction of data centers, it would be more of a market based pricing mechanism going forward you would expect? Speaker 300:57:17I don't well, again, look, I never want to say never, but I wouldn't I can't see any other scenario. Okay, very good. Thank you. Thanks. Operator00:57:31Thank you. Our next question is from the line of Anthony Krowdell with Mizuho Securities. Please proceed with your Speaker 800:57:37question. Speaker 1400:57:38Hey, thanks for squeezing me in. I guess Carly is looking to get like an EV Iraq Camaro or something. Speaker 500:57:44I guess just quickly, you Speaker 1400:57:45guys are in a unique position where you have unregulated generation, you guys are the regulated utility in New Jersey. Just all the talk is maybe higher capacity prices, higher power prices. I mean, is there while that's going to benefit your units, but any thought on maybe the customer bill impact starts crowding out rate base investment? Like managing that line, you guys are in a unique position where you kind of will see both ends of that? Speaker 300:58:11Yes, Anthony. No, it's a great question and it's one that we've been thinking about since 2,008, right? We always go back and take a look when commodity prices were much higher and make sure that any projections we have do not put us in a position. I've said it multiple times and I'll say it again, we're because of the good economic development work that we've done in this region, not just in this state, but in this region, the income has continued to do pretty well. And if you look at the share of wallet or pocketbook that anyone would have to put up to pay their utility bills. Speaker 300:58:52It's been pretty consistent over the last 20 years. So I would expect that to remain the same. There's a lot of that information that's in our IR materials that we've gone over a bunch of times with you. So, I don't see anything that's on the horizon even in some of the conversations that are taking place that would lead me to believe that we're crowding out the required utility investment that's going to have to take place if we're going to have all this electrification. Yes. Speaker 400:59:21And I think as we kick into PTCs too, Anthony, I think it rightfully puts whatever support there may be for nuclear at the federal level, which puts on even playing field for some of the PTCs and ITCs that you see for other carbon free investments. So I think that helps as well. Speaker 1400:59:37Great. Thanks so much for taking the question. Thanks, Anthony. Operator00:59:41Thank you. Our next question is from the line of Bill Apicelli with UBS. Please proceed with your question. Speaker 300:59:47Hey, Bill. Speaker 800:59:48Hi, good morning. How are you doing? Good. Speaker 1500:59:52Just similar line of questioning, Anthony, there, but just maybe around the demand and supply balance in PJM. Speaker 300:59:59So going back to the point of you kind Speaker 1501:00:00of being on both on the generation front and on TD, I mean, how are you viewing the demand growth broadly, whether it's behind the meter or otherwise? You did make that comment earlier about proliferation of colocation deals going forward in other sectors. I mean, do you have confidence in the current PGM process to ensure adequate reliability? Speaker 301:00:23Look, I got to leave that to the experts at NERC and FERC and every place else to look at PJM and their processes. I am one of the folks who has continued to say we need to keep our eye on the ball very, very closely, right? And so that won't change. I was very happy to see PJM react to our push specifically for our projections and listen to the input that we provided them last year. I think they've started the process to look at load growth again. Speaker 301:00:56I think it's another 4 or 5 month process that they've just begun and they'll come out with that towards the end of this year, beginning of next year. I trust that everything you've heard from other utilities that are within the PJM footprint and the loan projections they said will be reflected in those forecasts. And as a result, we'll either have a need for generation that will be signaled through the capacity markets or we'll have some transmission that will be required and you'll see that come in there through the RTAP process. So I'd like to see something longer from a capacity standpoint than 3 years or a year or whatever you might want to take a look at. It's tough when we were looking at those types of things, it's tough to make a decision on building a power plant. Speaker 301:01:45We're not in that business anymore. We're simply here on the with the assets we have, the clean assets that we have today and we're going to continue on that path. Speaker 801:01:55Right. I guess maybe to that last point, Speaker 1501:01:57Ed, I mean some companies within PJM have contemplated maybe pursuing legislation that could allow for regulated generation and rate base at some point, right, if you feel like the system isn't or the process isn't Speaker 301:02:09Yes, I think they may be closer to conversations they're having with PJM and they may have more frustrations about how PJM is listening to them. We were pretty vocal and we got a decent response last year. So I don't want to really weigh in on what their conversations may be. And I think I might be doing that if I weigh in on their generation. Speaker 1501:02:33I guess the question is for you, right? I mean would that be a path you would ever consider? Speaker 301:02:39From our standpoint, look, I have said multiple times, Bill, we have more than enough CapEx to have our 5% to 7% growth rate with our replacement activities. If the state of New Jersey or the federal government says, hey, listen, we'd like utilities to go do that, we would certainly listen to those requests. But we like putting pipe in the ground and wires in the air right now. And I'm not we're not in the business of building new rotating equipment. So if that happens, we certainly could put that skill set. Speaker 301:03:11We have it. We could restart it if we needed to, but we're counting on the marketplace that we're in to resolve it right now. Speaker 1501:03:19Understood. Thank you very much. Operator01:03:24Okay. That's good, Mr. LaRosa. Speaker 301:03:26Yes. I think that's it for the call, correct, timing wise? Operator01:03:29Correct. Yes, I was just going to hand the floor back to you for closing comments. Speaker 301:03:33All right, great. Well, listen, great conversation. I really appreciate everybody calling in and appreciate the Q and A section obviously was robust. I do want to just make one comment at the end here. We're in our normal storm and season that takes place and I'm going to go a little bit off the script here from the standpoint that I want to thank all those that responded to the storm down in Texas and just remind us all of the hard work that's done day in and day out by the line workers that responded in Texas. Speaker 301:04:13I was taken aback, I must say, by some of the behaviors that took place from a security standpoint down at CenterPoint and in Texas in general. And I just ask you all to keep that all in mind as we go forward into the season. There's a lot lights will go out, storms will come through and there's people out there working really, really hard at some really tough conditions and let's just keep them in our thoughts and prayers. And with that, I thank you for calling in and we'll catch up with you either on the road or in 3 months. Take care. Operator01:04:48Ladies and gentlemen, this concludes today's teleconference. You may disconnect your lines at Speaker 1101:04:52this time. Thank you for your participation.Read moreRemove AdsPowered by