NYSE:ORA Ormat Technologies Q2 2024 Earnings Report $71.58 +1.23 (+1.74%) Closing price 04/17/2025 03:59 PM EasternExtended Trading$71.61 +0.04 (+0.05%) As of 04/17/2025 04:26 PM Eastern Extended trading is trading that happens on electronic markets outside of regular trading hours. This is a fair market value extended hours price provided by Polygon.io. Learn more. Earnings HistoryForecast Ormat Technologies EPS ResultsActual EPS$0.40Consensus EPS $0.37Beat/MissBeat by +$0.03One Year Ago EPS$0.40Ormat Technologies Revenue ResultsActual Revenue$212.96 millionExpected Revenue$214.07 millionBeat/MissMissed by -$1.11 millionYoY Revenue Growth+9.30%Ormat Technologies Announcement DetailsQuarterQ2 2024Date8/6/2024TimeAfter Market ClosesConference Call DateWednesday, August 7, 2024Conference Call Time9:00AM ETUpcoming EarningsOrmat Technologies' Q1 2025 earnings is scheduled for Wednesday, May 7, 2025, with a conference call scheduled on Thursday, May 8, 2025 at 9:00 AM ET. Check back for transcripts, audio, and key financial metrics as they become available.Conference Call ResourcesConference Call AudioConference Call TranscriptSlide DeckPress Release (8-K)Quarterly Report (10-Q)Earnings HistoryCompany ProfileSlide DeckFull Screen Slide DeckPowered by Ormat Technologies Q2 2024 Earnings Call TranscriptProvided by QuartrAugust 7, 2024 ShareLink copied to clipboard.There are 11 speakers on the call. Operator00:00:00Good morning, and welcome to the Ormat Technologies Second Quarter 20 24 Earnings Conference Call. All participants will be in listen only mode. After today's presentation, there will be an opportunity to ask questions. Please note that this event is being recorded. I would now like to turn the conference over to Josh Carroll with Alpha IR. Operator00:00:30Please go ahead. Speaker 100:00:33Thank you, operator. Hosting the call today are Doron Bouchar, Chief Executive Officer Ozzie Ginzburg, Chief Financial Officer and Smadar Laveed, Vice President of Investor Relations and ESG Planning Reporting. Before beginning, we would like to remind you that the information provided during this call may contain forward looking statements relating to the current expectations, estimates, forecasts and projections of future events that are forward looking as defined in the Private Securities Litigation Reform Act of 1995. These forward looking statements generally relate to the company's plans, objectives and expectations for future operations and are based on management's current estimates and projections, future results or trends. Actual future results may differ materially from those projected as a result of certain risks and uncertainties. Speaker 100:01:20For a discussion of such risks and uncertainties, please see Risk Factors as described in Ormat Technologies' Annual Report on Form 10 ks and core reports on Form 10 Q that are filed with the SEC. In addition, during the call, the company will present non GAAP financial measures such as adjusted EBITDA. Reconciliations to the most directly comparable GAAP measures and management reasons for presenting such information is set forth in the press release that was issued last night, follows in the slides posted on the website. Because these measures are not calculated in accordance with GAAP, they should not be considered in isolation from the financial statements prepared in accordance with GAAP. Before I turn the call over to management, I would like to remind everyone that a slide presentation accompanying this call may be accessed on the company's website atormap.com under the presentation link that's found on the Investor Relations tab. Speaker 100:02:11With all that said, I would now like to turn the call over to Doron Bouchard. Doron, the call is yours. Speaker 200:02:16Thank you, Josh, and good morning, everyone. Thank you for joining us today. During the Q2, Romati again delivered strong financial results driven by our consistent improvement across all our operating segments and our focus on continued profitable growth. The 2nd quarter had a 9.3% increase in total revenues and 25% increase in adjusted EBITDA when compared to the Q2 of last year. This improved performance and results were primarily led by the expansion of our capacity generating portfolio and improved operating performance which has translated into solid retail. Speaker 200:03:01Within our Electricity segment, we continued to drive consistent growth during the quarter largely driven by the addition of the Enel assets that were acquired at the beginning of the year. We have also benefited from the continued improvement at our Puna facility and from the contribution of a full quarter of performance at our Hibo 1 facility which resumed operations in last year's Q2. The performance of our Energy Storage segment has continued to stabilize and deliver improved results in the period with the segment exhibiting strong revenue growth versus the prior year as a result of the contribution from the 83 megawatts of new projects that came online in the last 12 months. Additionally, we continue to make progress on our goal of transitioning our energy storage business towards a more balanced portfolio through a mix of RA contracts, tolling agreements and merchant projects with a focus on stability, high returns and improved margin. This effort is highlighted by recent 15 year RA agreement with the City of Riverside for our shared storage facility, which we expect will be eligible for approximately 40% ITC benefit and the release for construction of Louisa, a new storage facility of 100 Megawatts, 200 Megawatts Hour in Texas, which we also expect to be eligible for 40% ITC benefit. Speaker 200:04:39With the first half of the year now behind us, our generating capacity portfolio stands at 14 20 Megawatts as the demand for renewable energy and 0 emission power generation solution continues to increase. The increase in growing demand we see strengthens our confidence that we are progressing well towards our long term goals which directly align with the global trend of reducing carbon emissions from power production. Additionally, our growing Energy Storage segment is showing a strong and improved trajectory not only for revenue growth, but for enhanced returns and earnings contribution. Now before I provide further updates on our operation and plans, I will turn the call over to Assi to review the financial results for the quarter. Assi? Speaker 300:05:33Thank you, Doron. Let me start my review of our financial highlights on Slide 5. Total revenue for the 2nd quarter was $213,000,000 marking growth of more than 9% year over year. Our consolidated top line expansion was driven by growth across all of our MAX operating segments, which serves as a testament to our continued track record of executing profitable growth. Our March 2nd quarter 2024 gross profit was $61,400,000 up 24% versus $49,500,000 in the Q2 of 2023, resulting in a consolidated gross margin of 28.8 percent versus 25.4 percent last year. Speaker 300:06:32The increase was driven by solid margin expansion across all three operating segments. Net income attributable to the company's stockholders was $22,200,000 or $0.37 per diluted share in the quarter compared to $24,200,000 or $0.40 per diluted share in the Q2 of the prior year. Adjusted net income attributable to the company's stockholder increased by 0.3 percent to $24,300,000 Adjusted diluted EPS was $0.40 similar to the Q2 last year. Net income was adjusted to exclude write offs mainly related to the decommissioning of Orec IV, a 4 Megawatt RAG facility as well as unsuccessful exploration activities. 2nd quarter adjusted EBITDA was $126,100,000 increase of 25% in the 2nd quarter, compared to the $100,900,000 generated in the prior year period. Speaker 300:07:54The strong year over year increase in adjusted EBITDA was driven by higher revenues and improved gross margin across all three business segments, which in turn drove higher operating income. Our improved gross profit in the quarter was driven mainly by the new acquired portfolio assets in early 2024, the improved operation at our Puna power plant and the contribution from the Himba complex repowering. On slide 6, we break down the revenue performance at the segment level. Electricity segment revenue increased by 7% to $166,200,000 2nd quarter revenue growth was driven by the factors that I previously mentioned. This revenue growth was partially offset by weaker performance at Dixie Valley due to an unplanned outage, which Doron will touch on later in the call. Speaker 300:08:59In the product segment, revenues marked a substantial increase growing by 13.1% to $37,800,000 The growth in our product segment was supported by a stronger backlog and the timing of revenue recognition. The current product segment backlog stands at approximately $165,000,000 end of August 5, 2024 and includes the EPC of the Dominica BOT project with a state owned utility. Energy Storage segment revenue increased by 48.1% to $8,900,000 in the 2nd quarter. This strong growth was driven by the 83 megawatts that came online in the past 12 months including the 20 megawatt, 20 Megawatt Hour East Flemingsome project that started operation in the first quarter of this year and the addition of the Pomona II tolling agreement, energy storage revenues also benefited from improved pricing mainly at PGM. Moving to slide 7. Speaker 300:10:13Gross margin for the electricity segment was 33.5% in the 2nd quarter, up from 29.6% from the previous year. The margin expansion was driven primarily by the improved year over year generation performance at Puna and the Hebrick complex as well as the reduction in our power plant O and M cost. In the product segment, gross margin was 13.7% in the 2nd quarter, up from 10 0.4% in the Q2 of 2023. Margins increased due to improved profitability on our contract. Within the Energy Storage segment, gross margin during the Q2 was 5.7% compared to 1.9% in the prior year. Speaker 300:11:05Energy storage gross margin benefited from higher profitability from our Pomona 2 new tolling agreement and improved merchant prices at PGM. Breaking down adjusted EBITDA at the segment level on Slide 8. The Electricity segment generated 91% of Orbat's total consolidated adjusted EBITDA in the 2nd quarter. The Product segment contributed 5% and the Energy Storage segment accounted for 4% of total adjusted EBITDA. Reconciliation of EBITDA and adjusted EBITDA are provided in the appendix slide in the back of the presentation. Speaker 300:11:49Moving to Slide 9. In the Q2, we recorded $15,800,000 in income related to tax benefit compared to $15,000,000 last year. The increase is primarily related to the North Valley Tax Equity Transaction entered into in October 2023 and to higher transferable PTCs offset by lower generation of PTCs by other tax equity transactions. Also, in the Q2, we recorded a $6,200,000 ITC benefit in the income tax line related to the 2 storage facilities is Flemington that came online in the Q1 of the year and Battle Neck that is expected to come online towards the end of Q3 this year. We anticipate that we will receive up to $125,000,000 in cash proceeds related to the PTC and ITC benefits in 2024. Speaker 300:12:57This process will effectively reduce our capital need, expanding our ability to not only fund our growth, but to do so with strength profitability across our base of generating assets and ultimately lowering the capital intensity of our growth effort. Looking at Slide 10. Our net debt as of June 30, 2024 was approximately $2,200,000,000 equivalent to 4.2 times net debt to adjusted EBITDA. Cash and cash equivalents and restricted cash and cash equivalents as of June 30, 2024 was approximately $164,000,000 compared to $288,000,000 at the end of 2020. 2. Speaker 300:13:50Slide 10 breaks down our use of cash for the 6 months illustrating our math ability to reinvest in the business, service our debt obligation, while also consistently returning capital to our shareholders, all while growing our business. Our total debt as of June 30, 2024 was approximately $2,400,000,000 Net of deferred financing costs is presented on Slide 29 in the appendix, which outline the payment schedule. The average cost of our debt for the company stands at 4.63%. We reiterate that the majority of our debt liabilities are at fixed interest rates, which we believe will help maintain Ormat's competitive edge in the current elevated and volatile global interest rate environment. Moving to Slide 11. Speaker 300:14:49We have approximately $654,000,000 of total available liquidity. After the quarter ended, we issued $45,500,000 under the 2022 2.5 percent convertible bond to refinance debt. Please note that the bond itself cannot be converted to equity. If the convert is in the money, we will pay additional interest only. We will be able to make the additional payment in either cash or shares based on our decision. Speaker 300:15:24Our total expected capital expenditure for the remainder of 2024 is approximately $292,000,000 as detailed in Slide 30 in the appendix. We plan to invest approximately 138,000,000 dollars in the electricity segment for construction, exploration, drilling and maintenance CapEx. We'd also plan to spend $140,000,000 for the construction of our storage assets in the remaining of 2024. Our market balance sheet and capital resource position as well for the continued execution of our growth plan and earnings accretive capital deployment. As we continue to progress with executing on our growth plans, We are consistently increasing our cash generation, which combined with the expected cash from utilizing the tax benefit will fund our CapEx. Speaker 300:16:20We continue to maintain excellent liquidity and have ample access to additional capital as needed. On August 6, our Board of Directors declared, approved and authorized payment of quarterly dividend of $0.12 per share payable on September 3, 2024 to shareholders of record as of August 20, 2024. We expect to maintain this dividend level for the next quarter as well. That concludes my financial overview. I would now like to turn the call over to Doron to discuss some of our recent developments. Speaker 200:17:00Thank you, Assi. Turning to slide 13 for a look at our electricity segment operating portfolio. Portfolio growth during the quarter was positively supported by the recently completed COD for Biyawi repowering. Actual generation in the quarter increased due to the positive contribution of our recently acquired Enel assets and Hebea-one. Our Puna facility showed continued improvement during the Q2 running at approximately 31 megawatts. Speaker 200:17:34Turning to Slide 14 for an update on our operating footprint. At our Olkaria power plant in Kenya, we achieved a significant milestone by successfully conducting capacity tests that reached approximately 148 megawatts. This achievement resulted in higher capacity revenues during the quarter. These higher capacity revenues were offset by forced curtailment, which reduced our revenues and generation output. On Olkaria, I would also update that the tax preliminary investigation we reported in the Q1 10 Q was closed and the initial demand for $79,000,000 was reduced to 0. Speaker 200:18:23Our recently acquired Enel assets continued positively impact our results with the asset generating revenue and EBITDA of $8,600,000 $6,100,000 respectively. As discussed on our Q1 earnings call, we have started the enhancement of the 3 acquired geothermal assets that we expect will translate into expanded returns through improved performance. We are also evaluating options to build a new up to 35 Megawatt power plant, Cofort 2 in Utah by the end of 2027, which was initially planned to be completed in 2029 at lower capacity. And as we noted previously, we experienced an unplanned outage during the Q2 at our Dixie Valley facility resulting in lower electricity generation, which negatively impacted revenues and EBITDA by approximately $4,500,000 The plant has resumed partial operation and we expect to resume full operation in the Q4 after a 30 day shutdown in October. On an annual basis, we anticipate the impact from Dixie Valley will result in a reduction of $9,600,000 in revenues and $8,200,000 in EBITDA. Speaker 200:19:56This reduction was taken into account in our revised guidance. Turning to Slide 15. Our product segment backlog stands at $165,000,000 which is up 38% when compared to the Q2 of 2023 27% compared to Q1 2024. This increase is mainly related to the inclusion of the EPC of the Dominica DOT project that we expect will be online by the end of 2025. We continue to remain encouraged by the growing demand for geothermal which should allow us to maintain a strong backlog. Speaker 200:20:42Moving to Slide 16. The Storage segment continues to show signs of solid incremental growth on a sequential basis, which is highlighted by the strong second quarter and first half growth that the segment delivered. The results during the quarter were largely supported by the new projects launched in 2023 and the East Flemington facility that came online during the Q1. Moving to Slide 18. As we announced at our recent Investor Day, we are now targeting our portfolio capacity to reach between 2.6 to 2.8 gigawatts by year end 2028. Speaker 200:21:28As such targets suggest, we currently expect we will see an annual growth rate between 15% to 17% with the majority of this growth focused in the U. S. While we see plenty of promising opportunities internationally, The U. S. Has become a much larger focus for our growth efforts given the rapidly increasing opportunities in the region for both our electricity and storage segment. Speaker 200:21:59As I noted at the beginning of the call, our consistently strong performance over the last few quarters has positioned us well in our efforts to achieve our long term capacity target and translate that strategic growth into return. Due to our increased focus on the U. S. Market, we increased our business development efforts to secure long term agreements for the electricity segment both with traditional utilities and with tech companies. At our RiverOne facility, we have re contracted the project with the same parties and are awaiting final approval for a PPA that carries a price level as discussed in our Investor Day. Speaker 200:22:46In addition, we are discussing portfolio PPAs with utilities in Nevada, California and Oregon and with one of the tech companies driven by the increased demand for renewable energy as a result of AI energy needs. All the PPAs are negotiated at the price ranges similar to what we presented at our recent Investor Day. Turning now to Slides 1920, which displays our geothermal and hybrid solar PV project that we currently have underway. We're currently on track to complete the Igen project in Indonesia by the end of 2024. Zuni in Guatemala is planned to be completed in 2025. Speaker 200:23:36Additionally, in our solar PV portfolio, we anticipate that we will complete our CODs for the Biowi solar project by the end of this year. Moving now to slide 21 and 22 to discuss the 3rd layer of our growth plan, our Energy Storage segment. At our bottlenecks facility in California, we're currently wrapping up the commissioning stage and we now anticipate that the 80 Megawatt, 3 20 Megawatt Hour storage facility will begin operating by the end of Q3 of this year. In total, we currently have 7 different storage projects under development that we expect to achieve COD by the end of 2026, which should add a total of 4 35 Megawatts, 12 40 Megawatt Hour to our storage portfolio. As discussed during our Investor Day, our strategy calls for a balanced split between tolling agreement and merchant market pricing. Speaker 200:24:46Before I move on to discuss our guidance, I would like to mention the recent positive development in the permitting front. A few weeks ago, the U. S. Senate introduced the Energy Terminating Reform Act, which seeks to ease the environmental review for solar, wind and geothermal project in ways the oil and gas industry has long enjoyed. This is an exciting development for Orman. Speaker 200:25:12If this bid is passed, it will serve as a positive advancement in our strategic growth plan as it should accelerate the timeline for the necessary permitting to advance our geothermal exploration and solar projects. In turn, this development would put us in an even stronger position to reach and exceed our long term operating capacity goals. Please turn to Slide 23 for a discussion of our 2024 guidance. We narrowed and increased the midpoint of our expected total revenue and we expect it to range between 875 $1,000,000 $910,000,000 with the Electricity segment revenues between $710,000,000 $720,000,000 product segment revenues between $130,000,000 $145,000,000 and energy storage revenue between $35,000,000 $45,000,000 As a result of increased profitability in all of our segments, we increased our expected adjusted EBITDA midpoint and expect the range to be between $520,000,000 $550,000,000 We expect annual adjusted EBITDA attributable to minority interest to be approximately $20,000,000 I will end our prepared remarks on Slide 24. To summarize, we are proud of what we have been able accomplish during the first half of the year as we continue to execute against our long term growth targets, while also delivering strong financial results. Speaker 200:26:59Encouragingly, these results have been driven by our premium geothermal and energy storage solution, our strong business development track record and our ability to drive improved project return through higher PPA pricing and tolling agreement. Furthermore, with favorable PTC and ITC benefits and the cash flow from our operations, we have the unique ability to reach self funding of our future growth through cash flow generation as OMA continues to progress along its growth trajectory. As we look ahead, we continue to see strong industry tailwinds for both geothermal and energy storage that will help drive increased profitability for OMA as the demand for electricity continues to grow with the rise of data center. With all this combined, we believe that we are on the right path forward to drive significant stakeholders value in 2024 and beyond. This concludes our prepared remarks. Speaker 200:28:08Now I would like to open the call for questions. Operator, please. Operator00:28:17Thank you. We will now begin the question and answer session. We'll take our first question from Noah Kaye at Oppenheimer. Speaker 400:28:36Thanks for taking the questions. First on storage, just wanted to put a finer point on the expected timing for bottleneck to come online. I think you mentioned that would be this quarter. Just give us a sense of where you're at in the process, any kind of puts and takes towards getting this to final completion? And then it seems like just better merchant prices and some of the better pricing under Pomona is helping offset any delay in contribution from bottleneck in the full year guide. Speaker 400:29:13Is that the right way to think about it? Speaker 200:29:16I know. Thank you. So regarding bottleneck, we are in the final stages of commissioning any commissioning the facility. Following that, we have some commissioning test with SCE and Kaiser and the off taker. So we expect the project to come online by the end of September. Speaker 200:29:42We did expect it to come a few weeks earlier, so there was a delay, but that's obviously included in our numbers that we've issued. Speaker 400:29:55Right. And as far as the potential offset in terms of just better economics on the rest portfolio, is that the right way to think about it? Because obviously, bottleneck is a pretty substantial project. Speaker 200:30:06Yes, yes, definitely. We've seen better pricing, I believe, across all of our fleet in the more in PGM, but also Texas had better pricing, and California also had not bad pricing. So we had the larger fleet today, so we can cover up for this few weeks delay. Speaker 400:30:31Okay. Very helpful. And then you talked at Investor Day and gave some specific numbers on where pricing has trended on the geothermal side and it's very encouraging. As we look at the developments, the portfolio development that you've got listed on Slide 19, all of these have PPAs. I guess, can you help us think through where there may be upside to the current portfolio with respect to either recontracting or additional capacity that can be contracted out more favorably? Speaker 400:31:09How should we dimension that? Speaker 200:31:13I would say that as you know, we did sign 2 portfolio PPAs with CC Power and with NV Energy. I would say that all the contracts that are going to be re contracted with these 2 PPAs will have better pricing than what they are today. The pricing the PPA that we're negotiating today relates to the following period after 2028. And over that, we see the pricing in the area of 100 plus minus, depends on the specific location. So on these projects that you do, you see here on the list, most of them will come online before the end in the PPA. Speaker 200:32:03The one thing that is very interesting is Cofort that we acquired from Enel earlier this year. We released the 3 expansions and we are also looking at the COFO II. We originally forecasted it to be in 2029 at around 20 to 25 megawatts. Today, we believe it can be in 2027 and maybe even at a higher capacity. Finalizing it, but it might be up to 35 megawatts and we're on it now. Speaker 200:32:39We're negotiating with Salt River Power a PPA for this expansion. Speaker 400:32:46That's very encouraging. I'll turn it over. Thank you. Speaker 300:32:51Thank you. Operator00:32:54We'll move next to Justin Clare at ROTH Capital. Speaker 500:32:58Hi, good morning. So wanted to start off on your Ocaria project in Kenya. So it sounds like you had a successful capacity test up to 148 Megawatts here. I was wondering where that plant is operating on average and then what the potential is to kind of move that capacity upward toward the 148 or potentially up to the 150 where your PPA is? Could we see that by the end of the year? Speaker 500:33:27Or how do you see the kind of average stable capacity trending ahead here? Speaker 300:33:35As we discussed in Q4 and also in Q1, we were able to have a very successful drilling campaign in Kenya. And right now, the plant is can generate 148 megawatts, and that's the capacity that we are charging our customer. We don't see a reason why this number will come down. We should stay at that amount in the foreseeable future. We also have a plan in the next few months to recalibrate and the way the wells are flowing into the facility in order to make sure we can keep it at a very high capacity. Speaker 300:34:18I will say though that we are experiencing curtailment in Kenya. Year to date, including July, we probably lost $7,000,000 to $8,000,000 as a result of the curtailment. So the plant is running at lower capacity, but it's available to run close to capacity, which is 150. I don't think there is a big difference between 148 and 150, but this is where we are today. So we may get to 150, but we're very satisfied with the successful outcome of the drilling campaign. Speaker 300:34:50You asked about Kenya, I will just add that we continue to see positive cash flow payments from KPLC on one hand. And in addition, as Doron mentioned, we did had $80,000,000 almost a tax investigation claim that we got from the KRA during late Q1, early Q2. And that was fully resolved with 0 settlement. So we basically resolved all of it. So I would say in general, most of the issues in Kenya are behind us. Speaker 300:35:25Now we are trying to work with KPLC to try and reduce the impact of the curtailment. Speaker 500:35:32Okay, great. That's helpful. And maybe you could just elaborate on the reason that you are seeing the curtailment and what you anticipate ahead here. Is there potential for that to be reduced or where you won't see curtailment going forward? Speaker 300:35:51We do know that there is some interconnection issues and capacity on the lines and there are other developers in Kenya that are developing projects, maybe KPLC have some tech or pays that they are required to fill before they buy the geothermal. With that being said, our energy price is pretty low. It's at $0.035 per kilowatt, and we believe that over time, it will be very attractive for KPLC to buy this amount more energy from us. In addition to that, we did pick up production very quickly from 110, 115 to 148. So maybe they also need to adjust to the change, but now the plant is much larger. Speaker 300:36:35So I don't have any direct knowledge of when this thing will be adjusted back, but we are planning to meet with KPLC over the next few months to try and bring the reduce the curtailment impact. Speaker 500:36:51Okay, got it. And maybe just shifting over to your battery storage business, I was wondering if you could talk about your ability to secure the domestic content adder for your battery projects in 2025 or 2026. It sounds like there are suppliers that are offering different approaches to qualifying for domestic content. So just wanted to see if that was a possibility in the coming years here. Speaker 200:37:24We are discussing with all battery suppliers. We know that some of them claim that in 2024 they are able to meet the domestic content. We know that they are looking at ways how to get to domestic content in 2025. And obviously, the IRS guidelines are becoming more and more strict as the years pass. So we are looking at it. Speaker 200:37:50Our project is listed on our presentation, most of them are 40%. We don't see today one of these projects that we released getting 50%, but future project every project before we release it, we discussed with foreign manufacturers and local manufacturers in order to see if we can get local content. And on top of that, whether or not the higher pricing for the local content is getting basically paid back by the ITC or you basically pay the same and the entire benefit goes to the domestic content or the local manufacturer. Speaker 500:38:31Got it. Okay. Appreciate it. Thank you. Speaker 100:38:34Thank you. Operator00:38:37We'll move next to Derek Podhazer at Barclays. Speaker 600:38:42Hey, good morning. Just wanted to ask about the margin outlook for both product and energy storage. I know product, you previously guided us to 15%, 20%. We're still below that right now. So maybe can you help us bridge us to where you are today to get into that 15% to 20% range? Speaker 600:38:58And then on the energy storage, similar, I know bottleneck seems like it's got pushed out to the end of the Q3. And just thinking about a margin inflection there that you guys previously talked about. So just the overall margin outlook for Product and Energy Storage? Speaker 200:39:14Look, on the Product segment, 15% to 20%, this is our target. Although this quarter, we were 13.7%, which is a bit below this target. We do see on the project that we're working on and signing margins within the range that we guided. And obviously in specific quarter it might be a bit lower, but this is the target that we have. Speaker 300:39:46On the storage front, when we look at Q4 with the expectation of the operation of Bottleneck, we do expect double digits anywhere from 10% to 15% margin. And that not assuming any weather events. Initially, I will say that bottleneck, a lot of the income is coming in Q3. And right now, it looks like Q3 will not include the bottleneck for the most of the quarter. So the margin environment should be closer to what we've seen this quarter. Speaker 600:40:22Okay, got it. That's helpful. And just back on product, any primary drivers for margins at that 13.5% range? Speaker 300:40:32I think that the overall market is very competitive. Some of our projects that we signed are have a big portion of construction part, which is part of the EPC that we're doing for mostly in our New Zealand customers. Those projects that we do in New Zealand has a big portion of that construction. And usually, the margin on it is around 10%, which is different than the margin that we are getting by selling a pure equipment. I will say that Dominica that is a BOT project that we are now recording it as a 3rd party project does carry close to 22% margin and that should improve margin as we go towards the next year. Speaker 600:41:19Got it. Okay. That's helpful. Operator00:41:21And then I guess just following up on the Speaker 600:41:24selling of the pure equipment, so this is more of a bigger picture question. But could you help frame for us just the dollar per megawatt exposure you have on the product side from that growing unconventional geothermal players or startup communities, whether you want to call it EGS or AGS? Just maybe how you think about how you could be a partner with those guys as they look to build and construct power plants using their new designs. Just help us frame what kind of an opportunity that could be for you, if you can give it on a dollar per megawatt basis, I would assume it's going to be coming out of the product side. Speaker 200:41:58Look, I would say if the EGS technology will be successful and people will be able to use water fracking and generate hot water or steam. This could be for the product segment a very big upside because we will suddenly see many more potential geothermal projects coming online. So we definitely look forward to see it. I can tell you that internally in Ormat, we're also looking at EGS since we are also a developer of projects. And if this technology will be successful and I will tell you that DoMat has a patent on these technologies from 18 years ago already, We will definitely be happy to use the same technology to develop new projects. Speaker 200:42:49So we are looking at these startups that are coming. We see this as a very nice and potential upside. However, it's not something that we believe will be in the short term, hopefully in the midterm, but quite a lot of technology challenges that they still need to overcome in order for this technology to be economical and bankable. Speaker 600:43:19All right, great. Appreciate all the color. I'll turn it back. Speaker 100:43:23Thank you. Operator00:43:26Next, we'll move to John Wyndham at UBS Financial. Speaker 700:43:31Hi. Good morning and thank you for taking the questions. I would be very interested in just getting your high level thoughts about, particularly the PJM capacity auction and how you maybe think about future battery storage projects in that region? I know you mostly been focused on the development in California and Texas, but whether you think PJM is sort of an opportunity moving forward for the storage business? Thanks. Speaker 200:44:00On the PGM capacity market, it was focusing mainly on generating assets and 4 hours batteries, not the kind of batteries that we are operating. The actual dollar amount that was there, although it was 10 times better than the previous year, the capacity payment is not a very high capacity payment. Today, we have about 100 megawatts and 100 megawatt hour in PGM. This is basically the size of our operations in PGM. We have one more project that is coming online beginning of next year. Speaker 200:44:38So we see this as a very nice market. We enjoyed it last year on the pricing. We enjoyed this year on the higher pricing. And we are looking very closely at this market. We hope that pricing will go up and the PGM market usually has higher prices in the winter versus Texas that has higher prices in the summer. Speaker 200:45:00That's kind of the balance that we have. So we see this as a nice upside, although not directly impacting our assets. Speaker 800:45:12Appreciate that. Be well. Operator00:45:17We'll go next to Ryan Levine at Citi. Speaker 100:45:21Good morning. Speaker 900:45:24Good afternoon. Is there any update to the Reno and Nevada data center growth opportunity? And what are the current expectations or outlook for your business there? Speaker 200:45:39Yes. Definitely, there is a potential and upside. We are negotiating actually changing term shift with 1 of the data center that is operating in Nevada that is looking to be to buy from us geothermal energy. It is a bilateral discussion with them and it is actually competing between them versus NV Energy and other and another utility in California that we are negotiating. At the end of the day, when we look at it, we're fine to sell to the utility and the utility you can sell to the data center as long as we get the right pricing for it. Speaker 200:46:30It's not that we need a direct relationship or contract with the data center. But today we are negotiating with all of them. And once we will move forward with either one of them, we will obviously update the market. Speaker 900:46:46Okay. And what's your what's the company's current exposure to the Chinese battery suppliers? And has that exposure changed with some of your recent contracting activity with one of your counterparties? Speaker 200:47:06I would say that most of the battery manufacturer are from China, even if you go and buy from U. S. Battery suppliers, they buy the sales from China. So we are working with the Chinese battery manufacturers. They are delivering and supplying the batteries. Speaker 200:47:31So this is something that we are definitely working on. We did already order the batteries for most of our projects that are listed on the slide, on Slide 21. Obviously, not for the last one that we just released, Luisa, which is a new project that we just released. But we have already contracts for the other projects. Speaker 900:47:59Okay. And then in terms of your ERCOT battery opportunities, it looks like you added a project this quarter. Given the forward curves and the dynamic nature of that market, are you seeing an acceleration of opportunity or an increase in opportunity versus previous quarters? Or any color you could share around the development opportunities you're seeing in the aircraft market? Speaker 200:48:27Look, what we're seeing basically is better returns. We see the market pricing a bit higher than what it is. We see PPAs. So today we do see similar to California PPAs or tolling agreement being signed in Texas. And we are also negotiating to some of our projects like in Berndog and Lo Rio. Speaker 200:48:59And on top of that, we have the 40% ITC. So actually, we see better returns than what we originally anticipated. Thanks to the 40% and the PPAs that we are negotiating. And once they will be finalized, we'll update the market, of course. Speaker 100:49:17Thank you for the time. Operator00:49:22We'll go next to Julien Dumoulin Smith at Jefferies. Speaker 800:49:27Hey, good morning team. Thank you guys so much. Appreciate it. Look, I just want to come back, same vein as some of the last questions. In as much as you think about scaling up the opportunities, you guys obviously rolled forward the outlook from 26 to 28 with more megawatts. Speaker 800:49:41But given the commentary across the West, given your commentary about evaluating portfolio agreements, how do you think about scaling your opportunities further and investing in kind of early stage permitting to bring up those total megawatt targets further here. Just thinking about rising and having the ability and land positions to meet the growing demand in the West, especially as you say you're specifically in conversations on some portfolio wide arrangements with several utilities. Just thinking about how big that could be in terms of incremental megawatts, not just recontracting existing assets? Speaker 200:50:21So we gave the 28 target for the growth. And since you are Julien following us for quite a long time, when we give targets, usually we have a path how to reach them. We definitely when we see this demand both in geothermal and in energy storage, we are increasing our efforts to develop more projects. I also mentioned the legislation on permitting that we hope will be finalized next year. So we do believe there's an option for upside on both the geothermal and the storage area. Speaker 200:51:07And as we move forward, we will update it similar to the 26 numbers that we increased them during the term. That's hopefully what we will be able to do if all goes well for the 28 numbers as well. Speaker 800:51:24Got it. And then related, how do you think about ERCOT here? I mean, I see further assets being announced there. How do you think about balancing the risks on ancillary pricing and there's some concerns about saturation out there in that market at a certain point? Again, obviously, lots of opportunities in the West here. Speaker 800:51:39But again, as it stands today, pricing seems quite attractive in Texas in the here and now. Speaker 200:51:46Yes. So that's an excellent question, Julien. That's why we are negotiating today for both Buildog and Lower Rio tolling agreements. And once we'll be able to sign them, we'll have a much better balanced portfolio, be able to release more projects in Texas. At the end of the day, we are targeting roughly overall the portfolio about 50%, 50% merchant versus contracted. Speaker 200:52:12And once we are able to contract projects in Texas, it will allow us on one hand to reduce the risk of pricing going down in Texas. But on the other hand, we do want merchant projects in Texas because we do see some potential upside on specific days in the year or specific months. So we are trying to balance between the 2. And that's how we are releasing projects. Speaker 800:52:47All right. Fair enough, guys. Thank you very much. Good luck with all the efforts. Thank you. Speaker 100:52:51Thank you. Speaker 300:52:52Good luck here, Jefferies. Operator00:52:56And we'll take our final question from Jeff Osborne at TD Cowen. Speaker 1000:53:01Hey, good morning. Just one question on my side. Asi, I was wondering on the ICC cash benefits, how we should think about that benefit in the 3rd Q4? I think you said 125 for the year. I assume Q3 is a big number just with bottleneck coming online, but any thoughts on how we should be modeling that? Speaker 300:53:20From a cash flow perspective, at the Q4, we expect to utilize and sell the ITC of Battle Neck, which is equivalent to $35,000,000 in addition to utilizing the to do basically a tax equity transaction for a Heber plant, which is around €75,000,000 So that will be the majority of that. The remaining dollars are PTC that we plan to sell between September October. Roughly, we have $25,000,000 of PTCs that are part of the PTC transfer program and those will be sold between September October. These are the 2023 PTCs and the 20 24 PTCs. Under the new law, we can sell them to a 3rd party. Speaker 300:54:07And right now, we're negotiating final steps of that agreement. Speaker 1000:54:12Got it. And just to be clear, the 75 from Heber is also in 4Q? Speaker 900:54:17Yes. Perfect. That's all I had. Thank you. Speaker 100:54:21You're welcome. Thank you. Thank you, Operator00:54:24Jess. And that concludes our Q and A session. I will now turn the conference back over to Doran Blacher for closing remarks. Speaker 200:54:33Thank you. Thank you all for joining us today. This was a very good quarter for us and we are continuing to work and be focused on growth and profitability. I would like to thank you for your support and look forward to speaking with you again next quarter. Thank you. Operator00:54:51And this concludes today's conference call. Thank you for your participation. You may now disconnect.Read morePowered by Conference Call Audio Live Call not available Earnings Conference CallOrmat Technologies Q2 202400:00 / 00:00Speed:1x1.25x1.5x2x Earnings DocumentsSlide DeckPress Release(8-K)Quarterly report(10-Q) Ormat Technologies Earnings HeadlinesAnalysts Set Ormat Technologies, Inc. (NYSE:ORA) PT at $83.56April 10, 2025 | americanbankingnews.comIs Ormat Technologies, Inc. (NYSE:ORA) Among the Best Geothermal Stocks to Buy According to Hedge Funds?April 9, 2025 | insidermonkey.com$2 Trillion Disappears Because of Fed's Secretive New Move$2 trillion has disappeared from the US government's books. The reason why is a new, secretive move being carried out by the Fed that has nothing to do with lowering or raising interest rates... but could soon have an enormous impact on your wealth.April 18, 2025 | Stansberry Research (Ad)Is Ormat Technologies, Inc. (NYSE:ORA) Among the Best Geothermal Stocks to Buy According to Hedge Funds?April 9, 2025 | msn.comOrmat Technologies, Inc. to Host Conference Call Announcing First Quarter 2025 Financial ResultsApril 9, 2025 | globenewswire.comOrmat Technologies, Inc. to Host Conference Call Announcing First Quarter 2025 Financial ResultsApril 9, 2025 | globenewswire.comSee More Ormat Technologies Headlines Get Earnings Announcements in your inboxWant to stay updated on the latest earnings announcements and upcoming reports for companies like Ormat Technologies? Sign up for Earnings360's daily newsletter to receive timely earnings updates on Ormat Technologies and other key companies, straight to your email. Email Address About Ormat TechnologiesOrmat Technologies (NYSE:ORA) engages in the geothermal and recovered energy power business in the United States, Indonesia, Kenya, Turkey, Chile, Guatemala, Guadeloupe, New Zealand, Honduras, and internationally. It operates in three segments: Electricity, Product, and Energy Storage. The Electricity segment develops, builds, owns, and operates geothermal, solar photovoltaic, and recovered energy-based power plants; and sells electricity. The Product segment designs, manufactures, and sells equipment for geothermal and recovered energy-based electricity generation; and provides services relating to the engineering, procurement, construction, operation, and maintenance of geothermal and recovered energy-based power plants. This segment serves contractors; and owners and operators of interstate natural gas pipelines, gas processing plants, and cement plants, as well as companies in other energy-intensive industrial processes. The Energy Storage segment offers battery energy storage systems and related services. Ormat Technologies, Inc. was founded in 1965 and is headquartered in Reno, Nevada.View Ormat Technologies ProfileRead more More Earnings Resources from MarketBeat Earnings Tools Today's Earnings Tomorrow's Earnings Next Week's Earnings Upcoming Earnings Calls Earnings Newsletter Earnings Call Transcripts Earnings Beats & Misses Corporate Guidance Earnings Screener Earnings By Country U.S. Earnings Reports Canadian Earnings Reports U.K. Earnings Reports Latest Articles Archer Aviation Unveils NYC Network Ahead of Key Earnings Report3 Reasons to Like the Look of Amazon Ahead of EarningsTesla Stock Eyes Breakout With Earnings on DeckJohnson & Johnson Earnings Were More Good Than Bad—Time to Buy? Why Analysts Boosted United Airlines Stock Ahead of EarningsLamb Weston Stock Rises, Earnings Provide Calm Amidst ChaosIntuitive Machines Gains After Earnings Beat, NASA Missions Ahead Upcoming Earnings Tesla (4/22/2025)Intuitive Surgical (4/22/2025)Verizon Communications (4/22/2025)Canadian National Railway (4/22/2025)Novartis (4/22/2025)RTX (4/22/2025)3M (4/22/2025)Capital One Financial (4/22/2025)General Electric (4/22/2025)Danaher (4/22/2025) Get 30 Days of MarketBeat All Access for Free Sign up for MarketBeat All Access to gain access to MarketBeat's full suite of research tools. Start Your 30-Day Trial MarketBeat All Access Features Best-in-Class Portfolio Monitoring Get personalized stock ideas. Compare portfolio to indices. Check stock news, ratings, SEC filings, and more. Stock Ideas and Recommendations See daily stock ideas from top analysts. Receive short-term trading ideas from MarketBeat. Identify trending stocks on social media. Advanced Stock Screeners and Research Tools Use our seven stock screeners to find suitable stocks. Stay informed with MarketBeat's real-time news. Export data to Excel for personal analysis. Sign in to your free account to enjoy these benefits In-depth profiles and analysis for 20,000 public companies. Real-time analyst ratings, insider transactions, earnings data, and more. Our daily ratings and market update email newsletter. Sign in to your free account to enjoy all that MarketBeat has to offer. Sign In Create Account Your Email Address: Email Address Required Your Password: Password Required Log In or Sign in with Facebook Sign in with Google Forgot your password? Your Email Address: Please enter your email address. Please enter a valid email address Choose a Password: Please enter your password. Your password must be at least 8 characters long and contain at least 1 number, 1 letter, and 1 special character. Create My Account (Free) or Sign in with Facebook Sign in with Google By creating a free account, you agree to our terms of service. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
There are 11 speakers on the call. Operator00:00:00Good morning, and welcome to the Ormat Technologies Second Quarter 20 24 Earnings Conference Call. All participants will be in listen only mode. After today's presentation, there will be an opportunity to ask questions. Please note that this event is being recorded. I would now like to turn the conference over to Josh Carroll with Alpha IR. Operator00:00:30Please go ahead. Speaker 100:00:33Thank you, operator. Hosting the call today are Doron Bouchar, Chief Executive Officer Ozzie Ginzburg, Chief Financial Officer and Smadar Laveed, Vice President of Investor Relations and ESG Planning Reporting. Before beginning, we would like to remind you that the information provided during this call may contain forward looking statements relating to the current expectations, estimates, forecasts and projections of future events that are forward looking as defined in the Private Securities Litigation Reform Act of 1995. These forward looking statements generally relate to the company's plans, objectives and expectations for future operations and are based on management's current estimates and projections, future results or trends. Actual future results may differ materially from those projected as a result of certain risks and uncertainties. Speaker 100:01:20For a discussion of such risks and uncertainties, please see Risk Factors as described in Ormat Technologies' Annual Report on Form 10 ks and core reports on Form 10 Q that are filed with the SEC. In addition, during the call, the company will present non GAAP financial measures such as adjusted EBITDA. Reconciliations to the most directly comparable GAAP measures and management reasons for presenting such information is set forth in the press release that was issued last night, follows in the slides posted on the website. Because these measures are not calculated in accordance with GAAP, they should not be considered in isolation from the financial statements prepared in accordance with GAAP. Before I turn the call over to management, I would like to remind everyone that a slide presentation accompanying this call may be accessed on the company's website atormap.com under the presentation link that's found on the Investor Relations tab. Speaker 100:02:11With all that said, I would now like to turn the call over to Doron Bouchard. Doron, the call is yours. Speaker 200:02:16Thank you, Josh, and good morning, everyone. Thank you for joining us today. During the Q2, Romati again delivered strong financial results driven by our consistent improvement across all our operating segments and our focus on continued profitable growth. The 2nd quarter had a 9.3% increase in total revenues and 25% increase in adjusted EBITDA when compared to the Q2 of last year. This improved performance and results were primarily led by the expansion of our capacity generating portfolio and improved operating performance which has translated into solid retail. Speaker 200:03:01Within our Electricity segment, we continued to drive consistent growth during the quarter largely driven by the addition of the Enel assets that were acquired at the beginning of the year. We have also benefited from the continued improvement at our Puna facility and from the contribution of a full quarter of performance at our Hibo 1 facility which resumed operations in last year's Q2. The performance of our Energy Storage segment has continued to stabilize and deliver improved results in the period with the segment exhibiting strong revenue growth versus the prior year as a result of the contribution from the 83 megawatts of new projects that came online in the last 12 months. Additionally, we continue to make progress on our goal of transitioning our energy storage business towards a more balanced portfolio through a mix of RA contracts, tolling agreements and merchant projects with a focus on stability, high returns and improved margin. This effort is highlighted by recent 15 year RA agreement with the City of Riverside for our shared storage facility, which we expect will be eligible for approximately 40% ITC benefit and the release for construction of Louisa, a new storage facility of 100 Megawatts, 200 Megawatts Hour in Texas, which we also expect to be eligible for 40% ITC benefit. Speaker 200:04:39With the first half of the year now behind us, our generating capacity portfolio stands at 14 20 Megawatts as the demand for renewable energy and 0 emission power generation solution continues to increase. The increase in growing demand we see strengthens our confidence that we are progressing well towards our long term goals which directly align with the global trend of reducing carbon emissions from power production. Additionally, our growing Energy Storage segment is showing a strong and improved trajectory not only for revenue growth, but for enhanced returns and earnings contribution. Now before I provide further updates on our operation and plans, I will turn the call over to Assi to review the financial results for the quarter. Assi? Speaker 300:05:33Thank you, Doron. Let me start my review of our financial highlights on Slide 5. Total revenue for the 2nd quarter was $213,000,000 marking growth of more than 9% year over year. Our consolidated top line expansion was driven by growth across all of our MAX operating segments, which serves as a testament to our continued track record of executing profitable growth. Our March 2nd quarter 2024 gross profit was $61,400,000 up 24% versus $49,500,000 in the Q2 of 2023, resulting in a consolidated gross margin of 28.8 percent versus 25.4 percent last year. Speaker 300:06:32The increase was driven by solid margin expansion across all three operating segments. Net income attributable to the company's stockholders was $22,200,000 or $0.37 per diluted share in the quarter compared to $24,200,000 or $0.40 per diluted share in the Q2 of the prior year. Adjusted net income attributable to the company's stockholder increased by 0.3 percent to $24,300,000 Adjusted diluted EPS was $0.40 similar to the Q2 last year. Net income was adjusted to exclude write offs mainly related to the decommissioning of Orec IV, a 4 Megawatt RAG facility as well as unsuccessful exploration activities. 2nd quarter adjusted EBITDA was $126,100,000 increase of 25% in the 2nd quarter, compared to the $100,900,000 generated in the prior year period. Speaker 300:07:54The strong year over year increase in adjusted EBITDA was driven by higher revenues and improved gross margin across all three business segments, which in turn drove higher operating income. Our improved gross profit in the quarter was driven mainly by the new acquired portfolio assets in early 2024, the improved operation at our Puna power plant and the contribution from the Himba complex repowering. On slide 6, we break down the revenue performance at the segment level. Electricity segment revenue increased by 7% to $166,200,000 2nd quarter revenue growth was driven by the factors that I previously mentioned. This revenue growth was partially offset by weaker performance at Dixie Valley due to an unplanned outage, which Doron will touch on later in the call. Speaker 300:08:59In the product segment, revenues marked a substantial increase growing by 13.1% to $37,800,000 The growth in our product segment was supported by a stronger backlog and the timing of revenue recognition. The current product segment backlog stands at approximately $165,000,000 end of August 5, 2024 and includes the EPC of the Dominica BOT project with a state owned utility. Energy Storage segment revenue increased by 48.1% to $8,900,000 in the 2nd quarter. This strong growth was driven by the 83 megawatts that came online in the past 12 months including the 20 megawatt, 20 Megawatt Hour East Flemingsome project that started operation in the first quarter of this year and the addition of the Pomona II tolling agreement, energy storage revenues also benefited from improved pricing mainly at PGM. Moving to slide 7. Speaker 300:10:13Gross margin for the electricity segment was 33.5% in the 2nd quarter, up from 29.6% from the previous year. The margin expansion was driven primarily by the improved year over year generation performance at Puna and the Hebrick complex as well as the reduction in our power plant O and M cost. In the product segment, gross margin was 13.7% in the 2nd quarter, up from 10 0.4% in the Q2 of 2023. Margins increased due to improved profitability on our contract. Within the Energy Storage segment, gross margin during the Q2 was 5.7% compared to 1.9% in the prior year. Speaker 300:11:05Energy storage gross margin benefited from higher profitability from our Pomona 2 new tolling agreement and improved merchant prices at PGM. Breaking down adjusted EBITDA at the segment level on Slide 8. The Electricity segment generated 91% of Orbat's total consolidated adjusted EBITDA in the 2nd quarter. The Product segment contributed 5% and the Energy Storage segment accounted for 4% of total adjusted EBITDA. Reconciliation of EBITDA and adjusted EBITDA are provided in the appendix slide in the back of the presentation. Speaker 300:11:49Moving to Slide 9. In the Q2, we recorded $15,800,000 in income related to tax benefit compared to $15,000,000 last year. The increase is primarily related to the North Valley Tax Equity Transaction entered into in October 2023 and to higher transferable PTCs offset by lower generation of PTCs by other tax equity transactions. Also, in the Q2, we recorded a $6,200,000 ITC benefit in the income tax line related to the 2 storage facilities is Flemington that came online in the Q1 of the year and Battle Neck that is expected to come online towards the end of Q3 this year. We anticipate that we will receive up to $125,000,000 in cash proceeds related to the PTC and ITC benefits in 2024. Speaker 300:12:57This process will effectively reduce our capital need, expanding our ability to not only fund our growth, but to do so with strength profitability across our base of generating assets and ultimately lowering the capital intensity of our growth effort. Looking at Slide 10. Our net debt as of June 30, 2024 was approximately $2,200,000,000 equivalent to 4.2 times net debt to adjusted EBITDA. Cash and cash equivalents and restricted cash and cash equivalents as of June 30, 2024 was approximately $164,000,000 compared to $288,000,000 at the end of 2020. 2. Speaker 300:13:50Slide 10 breaks down our use of cash for the 6 months illustrating our math ability to reinvest in the business, service our debt obligation, while also consistently returning capital to our shareholders, all while growing our business. Our total debt as of June 30, 2024 was approximately $2,400,000,000 Net of deferred financing costs is presented on Slide 29 in the appendix, which outline the payment schedule. The average cost of our debt for the company stands at 4.63%. We reiterate that the majority of our debt liabilities are at fixed interest rates, which we believe will help maintain Ormat's competitive edge in the current elevated and volatile global interest rate environment. Moving to Slide 11. Speaker 300:14:49We have approximately $654,000,000 of total available liquidity. After the quarter ended, we issued $45,500,000 under the 2022 2.5 percent convertible bond to refinance debt. Please note that the bond itself cannot be converted to equity. If the convert is in the money, we will pay additional interest only. We will be able to make the additional payment in either cash or shares based on our decision. Speaker 300:15:24Our total expected capital expenditure for the remainder of 2024 is approximately $292,000,000 as detailed in Slide 30 in the appendix. We plan to invest approximately 138,000,000 dollars in the electricity segment for construction, exploration, drilling and maintenance CapEx. We'd also plan to spend $140,000,000 for the construction of our storage assets in the remaining of 2024. Our market balance sheet and capital resource position as well for the continued execution of our growth plan and earnings accretive capital deployment. As we continue to progress with executing on our growth plans, We are consistently increasing our cash generation, which combined with the expected cash from utilizing the tax benefit will fund our CapEx. Speaker 300:16:20We continue to maintain excellent liquidity and have ample access to additional capital as needed. On August 6, our Board of Directors declared, approved and authorized payment of quarterly dividend of $0.12 per share payable on September 3, 2024 to shareholders of record as of August 20, 2024. We expect to maintain this dividend level for the next quarter as well. That concludes my financial overview. I would now like to turn the call over to Doron to discuss some of our recent developments. Speaker 200:17:00Thank you, Assi. Turning to slide 13 for a look at our electricity segment operating portfolio. Portfolio growth during the quarter was positively supported by the recently completed COD for Biyawi repowering. Actual generation in the quarter increased due to the positive contribution of our recently acquired Enel assets and Hebea-one. Our Puna facility showed continued improvement during the Q2 running at approximately 31 megawatts. Speaker 200:17:34Turning to Slide 14 for an update on our operating footprint. At our Olkaria power plant in Kenya, we achieved a significant milestone by successfully conducting capacity tests that reached approximately 148 megawatts. This achievement resulted in higher capacity revenues during the quarter. These higher capacity revenues were offset by forced curtailment, which reduced our revenues and generation output. On Olkaria, I would also update that the tax preliminary investigation we reported in the Q1 10 Q was closed and the initial demand for $79,000,000 was reduced to 0. Speaker 200:18:23Our recently acquired Enel assets continued positively impact our results with the asset generating revenue and EBITDA of $8,600,000 $6,100,000 respectively. As discussed on our Q1 earnings call, we have started the enhancement of the 3 acquired geothermal assets that we expect will translate into expanded returns through improved performance. We are also evaluating options to build a new up to 35 Megawatt power plant, Cofort 2 in Utah by the end of 2027, which was initially planned to be completed in 2029 at lower capacity. And as we noted previously, we experienced an unplanned outage during the Q2 at our Dixie Valley facility resulting in lower electricity generation, which negatively impacted revenues and EBITDA by approximately $4,500,000 The plant has resumed partial operation and we expect to resume full operation in the Q4 after a 30 day shutdown in October. On an annual basis, we anticipate the impact from Dixie Valley will result in a reduction of $9,600,000 in revenues and $8,200,000 in EBITDA. Speaker 200:19:56This reduction was taken into account in our revised guidance. Turning to Slide 15. Our product segment backlog stands at $165,000,000 which is up 38% when compared to the Q2 of 2023 27% compared to Q1 2024. This increase is mainly related to the inclusion of the EPC of the Dominica DOT project that we expect will be online by the end of 2025. We continue to remain encouraged by the growing demand for geothermal which should allow us to maintain a strong backlog. Speaker 200:20:42Moving to Slide 16. The Storage segment continues to show signs of solid incremental growth on a sequential basis, which is highlighted by the strong second quarter and first half growth that the segment delivered. The results during the quarter were largely supported by the new projects launched in 2023 and the East Flemington facility that came online during the Q1. Moving to Slide 18. As we announced at our recent Investor Day, we are now targeting our portfolio capacity to reach between 2.6 to 2.8 gigawatts by year end 2028. Speaker 200:21:28As such targets suggest, we currently expect we will see an annual growth rate between 15% to 17% with the majority of this growth focused in the U. S. While we see plenty of promising opportunities internationally, The U. S. Has become a much larger focus for our growth efforts given the rapidly increasing opportunities in the region for both our electricity and storage segment. Speaker 200:21:59As I noted at the beginning of the call, our consistently strong performance over the last few quarters has positioned us well in our efforts to achieve our long term capacity target and translate that strategic growth into return. Due to our increased focus on the U. S. Market, we increased our business development efforts to secure long term agreements for the electricity segment both with traditional utilities and with tech companies. At our RiverOne facility, we have re contracted the project with the same parties and are awaiting final approval for a PPA that carries a price level as discussed in our Investor Day. Speaker 200:22:46In addition, we are discussing portfolio PPAs with utilities in Nevada, California and Oregon and with one of the tech companies driven by the increased demand for renewable energy as a result of AI energy needs. All the PPAs are negotiated at the price ranges similar to what we presented at our recent Investor Day. Turning now to Slides 1920, which displays our geothermal and hybrid solar PV project that we currently have underway. We're currently on track to complete the Igen project in Indonesia by the end of 2024. Zuni in Guatemala is planned to be completed in 2025. Speaker 200:23:36Additionally, in our solar PV portfolio, we anticipate that we will complete our CODs for the Biowi solar project by the end of this year. Moving now to slide 21 and 22 to discuss the 3rd layer of our growth plan, our Energy Storage segment. At our bottlenecks facility in California, we're currently wrapping up the commissioning stage and we now anticipate that the 80 Megawatt, 3 20 Megawatt Hour storage facility will begin operating by the end of Q3 of this year. In total, we currently have 7 different storage projects under development that we expect to achieve COD by the end of 2026, which should add a total of 4 35 Megawatts, 12 40 Megawatt Hour to our storage portfolio. As discussed during our Investor Day, our strategy calls for a balanced split between tolling agreement and merchant market pricing. Speaker 200:24:46Before I move on to discuss our guidance, I would like to mention the recent positive development in the permitting front. A few weeks ago, the U. S. Senate introduced the Energy Terminating Reform Act, which seeks to ease the environmental review for solar, wind and geothermal project in ways the oil and gas industry has long enjoyed. This is an exciting development for Orman. Speaker 200:25:12If this bid is passed, it will serve as a positive advancement in our strategic growth plan as it should accelerate the timeline for the necessary permitting to advance our geothermal exploration and solar projects. In turn, this development would put us in an even stronger position to reach and exceed our long term operating capacity goals. Please turn to Slide 23 for a discussion of our 2024 guidance. We narrowed and increased the midpoint of our expected total revenue and we expect it to range between 875 $1,000,000 $910,000,000 with the Electricity segment revenues between $710,000,000 $720,000,000 product segment revenues between $130,000,000 $145,000,000 and energy storage revenue between $35,000,000 $45,000,000 As a result of increased profitability in all of our segments, we increased our expected adjusted EBITDA midpoint and expect the range to be between $520,000,000 $550,000,000 We expect annual adjusted EBITDA attributable to minority interest to be approximately $20,000,000 I will end our prepared remarks on Slide 24. To summarize, we are proud of what we have been able accomplish during the first half of the year as we continue to execute against our long term growth targets, while also delivering strong financial results. Speaker 200:26:59Encouragingly, these results have been driven by our premium geothermal and energy storage solution, our strong business development track record and our ability to drive improved project return through higher PPA pricing and tolling agreement. Furthermore, with favorable PTC and ITC benefits and the cash flow from our operations, we have the unique ability to reach self funding of our future growth through cash flow generation as OMA continues to progress along its growth trajectory. As we look ahead, we continue to see strong industry tailwinds for both geothermal and energy storage that will help drive increased profitability for OMA as the demand for electricity continues to grow with the rise of data center. With all this combined, we believe that we are on the right path forward to drive significant stakeholders value in 2024 and beyond. This concludes our prepared remarks. Speaker 200:28:08Now I would like to open the call for questions. Operator, please. Operator00:28:17Thank you. We will now begin the question and answer session. We'll take our first question from Noah Kaye at Oppenheimer. Speaker 400:28:36Thanks for taking the questions. First on storage, just wanted to put a finer point on the expected timing for bottleneck to come online. I think you mentioned that would be this quarter. Just give us a sense of where you're at in the process, any kind of puts and takes towards getting this to final completion? And then it seems like just better merchant prices and some of the better pricing under Pomona is helping offset any delay in contribution from bottleneck in the full year guide. Speaker 400:29:13Is that the right way to think about it? Speaker 200:29:16I know. Thank you. So regarding bottleneck, we are in the final stages of commissioning any commissioning the facility. Following that, we have some commissioning test with SCE and Kaiser and the off taker. So we expect the project to come online by the end of September. Speaker 200:29:42We did expect it to come a few weeks earlier, so there was a delay, but that's obviously included in our numbers that we've issued. Speaker 400:29:55Right. And as far as the potential offset in terms of just better economics on the rest portfolio, is that the right way to think about it? Because obviously, bottleneck is a pretty substantial project. Speaker 200:30:06Yes, yes, definitely. We've seen better pricing, I believe, across all of our fleet in the more in PGM, but also Texas had better pricing, and California also had not bad pricing. So we had the larger fleet today, so we can cover up for this few weeks delay. Speaker 400:30:31Okay. Very helpful. And then you talked at Investor Day and gave some specific numbers on where pricing has trended on the geothermal side and it's very encouraging. As we look at the developments, the portfolio development that you've got listed on Slide 19, all of these have PPAs. I guess, can you help us think through where there may be upside to the current portfolio with respect to either recontracting or additional capacity that can be contracted out more favorably? Speaker 400:31:09How should we dimension that? Speaker 200:31:13I would say that as you know, we did sign 2 portfolio PPAs with CC Power and with NV Energy. I would say that all the contracts that are going to be re contracted with these 2 PPAs will have better pricing than what they are today. The pricing the PPA that we're negotiating today relates to the following period after 2028. And over that, we see the pricing in the area of 100 plus minus, depends on the specific location. So on these projects that you do, you see here on the list, most of them will come online before the end in the PPA. Speaker 200:32:03The one thing that is very interesting is Cofort that we acquired from Enel earlier this year. We released the 3 expansions and we are also looking at the COFO II. We originally forecasted it to be in 2029 at around 20 to 25 megawatts. Today, we believe it can be in 2027 and maybe even at a higher capacity. Finalizing it, but it might be up to 35 megawatts and we're on it now. Speaker 200:32:39We're negotiating with Salt River Power a PPA for this expansion. Speaker 400:32:46That's very encouraging. I'll turn it over. Thank you. Speaker 300:32:51Thank you. Operator00:32:54We'll move next to Justin Clare at ROTH Capital. Speaker 500:32:58Hi, good morning. So wanted to start off on your Ocaria project in Kenya. So it sounds like you had a successful capacity test up to 148 Megawatts here. I was wondering where that plant is operating on average and then what the potential is to kind of move that capacity upward toward the 148 or potentially up to the 150 where your PPA is? Could we see that by the end of the year? Speaker 500:33:27Or how do you see the kind of average stable capacity trending ahead here? Speaker 300:33:35As we discussed in Q4 and also in Q1, we were able to have a very successful drilling campaign in Kenya. And right now, the plant is can generate 148 megawatts, and that's the capacity that we are charging our customer. We don't see a reason why this number will come down. We should stay at that amount in the foreseeable future. We also have a plan in the next few months to recalibrate and the way the wells are flowing into the facility in order to make sure we can keep it at a very high capacity. Speaker 300:34:18I will say though that we are experiencing curtailment in Kenya. Year to date, including July, we probably lost $7,000,000 to $8,000,000 as a result of the curtailment. So the plant is running at lower capacity, but it's available to run close to capacity, which is 150. I don't think there is a big difference between 148 and 150, but this is where we are today. So we may get to 150, but we're very satisfied with the successful outcome of the drilling campaign. Speaker 300:34:50You asked about Kenya, I will just add that we continue to see positive cash flow payments from KPLC on one hand. And in addition, as Doron mentioned, we did had $80,000,000 almost a tax investigation claim that we got from the KRA during late Q1, early Q2. And that was fully resolved with 0 settlement. So we basically resolved all of it. So I would say in general, most of the issues in Kenya are behind us. Speaker 300:35:25Now we are trying to work with KPLC to try and reduce the impact of the curtailment. Speaker 500:35:32Okay, great. That's helpful. And maybe you could just elaborate on the reason that you are seeing the curtailment and what you anticipate ahead here. Is there potential for that to be reduced or where you won't see curtailment going forward? Speaker 300:35:51We do know that there is some interconnection issues and capacity on the lines and there are other developers in Kenya that are developing projects, maybe KPLC have some tech or pays that they are required to fill before they buy the geothermal. With that being said, our energy price is pretty low. It's at $0.035 per kilowatt, and we believe that over time, it will be very attractive for KPLC to buy this amount more energy from us. In addition to that, we did pick up production very quickly from 110, 115 to 148. So maybe they also need to adjust to the change, but now the plant is much larger. Speaker 300:36:35So I don't have any direct knowledge of when this thing will be adjusted back, but we are planning to meet with KPLC over the next few months to try and bring the reduce the curtailment impact. Speaker 500:36:51Okay, got it. And maybe just shifting over to your battery storage business, I was wondering if you could talk about your ability to secure the domestic content adder for your battery projects in 2025 or 2026. It sounds like there are suppliers that are offering different approaches to qualifying for domestic content. So just wanted to see if that was a possibility in the coming years here. Speaker 200:37:24We are discussing with all battery suppliers. We know that some of them claim that in 2024 they are able to meet the domestic content. We know that they are looking at ways how to get to domestic content in 2025. And obviously, the IRS guidelines are becoming more and more strict as the years pass. So we are looking at it. Speaker 200:37:50Our project is listed on our presentation, most of them are 40%. We don't see today one of these projects that we released getting 50%, but future project every project before we release it, we discussed with foreign manufacturers and local manufacturers in order to see if we can get local content. And on top of that, whether or not the higher pricing for the local content is getting basically paid back by the ITC or you basically pay the same and the entire benefit goes to the domestic content or the local manufacturer. Speaker 500:38:31Got it. Okay. Appreciate it. Thank you. Speaker 100:38:34Thank you. Operator00:38:37We'll move next to Derek Podhazer at Barclays. Speaker 600:38:42Hey, good morning. Just wanted to ask about the margin outlook for both product and energy storage. I know product, you previously guided us to 15%, 20%. We're still below that right now. So maybe can you help us bridge us to where you are today to get into that 15% to 20% range? Speaker 600:38:58And then on the energy storage, similar, I know bottleneck seems like it's got pushed out to the end of the Q3. And just thinking about a margin inflection there that you guys previously talked about. So just the overall margin outlook for Product and Energy Storage? Speaker 200:39:14Look, on the Product segment, 15% to 20%, this is our target. Although this quarter, we were 13.7%, which is a bit below this target. We do see on the project that we're working on and signing margins within the range that we guided. And obviously in specific quarter it might be a bit lower, but this is the target that we have. Speaker 300:39:46On the storage front, when we look at Q4 with the expectation of the operation of Bottleneck, we do expect double digits anywhere from 10% to 15% margin. And that not assuming any weather events. Initially, I will say that bottleneck, a lot of the income is coming in Q3. And right now, it looks like Q3 will not include the bottleneck for the most of the quarter. So the margin environment should be closer to what we've seen this quarter. Speaker 600:40:22Okay, got it. That's helpful. And just back on product, any primary drivers for margins at that 13.5% range? Speaker 300:40:32I think that the overall market is very competitive. Some of our projects that we signed are have a big portion of construction part, which is part of the EPC that we're doing for mostly in our New Zealand customers. Those projects that we do in New Zealand has a big portion of that construction. And usually, the margin on it is around 10%, which is different than the margin that we are getting by selling a pure equipment. I will say that Dominica that is a BOT project that we are now recording it as a 3rd party project does carry close to 22% margin and that should improve margin as we go towards the next year. Speaker 600:41:19Got it. Okay. That's helpful. Operator00:41:21And then I guess just following up on the Speaker 600:41:24selling of the pure equipment, so this is more of a bigger picture question. But could you help frame for us just the dollar per megawatt exposure you have on the product side from that growing unconventional geothermal players or startup communities, whether you want to call it EGS or AGS? Just maybe how you think about how you could be a partner with those guys as they look to build and construct power plants using their new designs. Just help us frame what kind of an opportunity that could be for you, if you can give it on a dollar per megawatt basis, I would assume it's going to be coming out of the product side. Speaker 200:41:58Look, I would say if the EGS technology will be successful and people will be able to use water fracking and generate hot water or steam. This could be for the product segment a very big upside because we will suddenly see many more potential geothermal projects coming online. So we definitely look forward to see it. I can tell you that internally in Ormat, we're also looking at EGS since we are also a developer of projects. And if this technology will be successful and I will tell you that DoMat has a patent on these technologies from 18 years ago already, We will definitely be happy to use the same technology to develop new projects. Speaker 200:42:49So we are looking at these startups that are coming. We see this as a very nice and potential upside. However, it's not something that we believe will be in the short term, hopefully in the midterm, but quite a lot of technology challenges that they still need to overcome in order for this technology to be economical and bankable. Speaker 600:43:19All right, great. Appreciate all the color. I'll turn it back. Speaker 100:43:23Thank you. Operator00:43:26Next, we'll move to John Wyndham at UBS Financial. Speaker 700:43:31Hi. Good morning and thank you for taking the questions. I would be very interested in just getting your high level thoughts about, particularly the PJM capacity auction and how you maybe think about future battery storage projects in that region? I know you mostly been focused on the development in California and Texas, but whether you think PJM is sort of an opportunity moving forward for the storage business? Thanks. Speaker 200:44:00On the PGM capacity market, it was focusing mainly on generating assets and 4 hours batteries, not the kind of batteries that we are operating. The actual dollar amount that was there, although it was 10 times better than the previous year, the capacity payment is not a very high capacity payment. Today, we have about 100 megawatts and 100 megawatt hour in PGM. This is basically the size of our operations in PGM. We have one more project that is coming online beginning of next year. Speaker 200:44:38So we see this as a very nice market. We enjoyed it last year on the pricing. We enjoyed this year on the higher pricing. And we are looking very closely at this market. We hope that pricing will go up and the PGM market usually has higher prices in the winter versus Texas that has higher prices in the summer. Speaker 200:45:00That's kind of the balance that we have. So we see this as a nice upside, although not directly impacting our assets. Speaker 800:45:12Appreciate that. Be well. Operator00:45:17We'll go next to Ryan Levine at Citi. Speaker 100:45:21Good morning. Speaker 900:45:24Good afternoon. Is there any update to the Reno and Nevada data center growth opportunity? And what are the current expectations or outlook for your business there? Speaker 200:45:39Yes. Definitely, there is a potential and upside. We are negotiating actually changing term shift with 1 of the data center that is operating in Nevada that is looking to be to buy from us geothermal energy. It is a bilateral discussion with them and it is actually competing between them versus NV Energy and other and another utility in California that we are negotiating. At the end of the day, when we look at it, we're fine to sell to the utility and the utility you can sell to the data center as long as we get the right pricing for it. Speaker 200:46:30It's not that we need a direct relationship or contract with the data center. But today we are negotiating with all of them. And once we will move forward with either one of them, we will obviously update the market. Speaker 900:46:46Okay. And what's your what's the company's current exposure to the Chinese battery suppliers? And has that exposure changed with some of your recent contracting activity with one of your counterparties? Speaker 200:47:06I would say that most of the battery manufacturer are from China, even if you go and buy from U. S. Battery suppliers, they buy the sales from China. So we are working with the Chinese battery manufacturers. They are delivering and supplying the batteries. Speaker 200:47:31So this is something that we are definitely working on. We did already order the batteries for most of our projects that are listed on the slide, on Slide 21. Obviously, not for the last one that we just released, Luisa, which is a new project that we just released. But we have already contracts for the other projects. Speaker 900:47:59Okay. And then in terms of your ERCOT battery opportunities, it looks like you added a project this quarter. Given the forward curves and the dynamic nature of that market, are you seeing an acceleration of opportunity or an increase in opportunity versus previous quarters? Or any color you could share around the development opportunities you're seeing in the aircraft market? Speaker 200:48:27Look, what we're seeing basically is better returns. We see the market pricing a bit higher than what it is. We see PPAs. So today we do see similar to California PPAs or tolling agreement being signed in Texas. And we are also negotiating to some of our projects like in Berndog and Lo Rio. Speaker 200:48:59And on top of that, we have the 40% ITC. So actually, we see better returns than what we originally anticipated. Thanks to the 40% and the PPAs that we are negotiating. And once they will be finalized, we'll update the market, of course. Speaker 100:49:17Thank you for the time. Operator00:49:22We'll go next to Julien Dumoulin Smith at Jefferies. Speaker 800:49:27Hey, good morning team. Thank you guys so much. Appreciate it. Look, I just want to come back, same vein as some of the last questions. In as much as you think about scaling up the opportunities, you guys obviously rolled forward the outlook from 26 to 28 with more megawatts. Speaker 800:49:41But given the commentary across the West, given your commentary about evaluating portfolio agreements, how do you think about scaling your opportunities further and investing in kind of early stage permitting to bring up those total megawatt targets further here. Just thinking about rising and having the ability and land positions to meet the growing demand in the West, especially as you say you're specifically in conversations on some portfolio wide arrangements with several utilities. Just thinking about how big that could be in terms of incremental megawatts, not just recontracting existing assets? Speaker 200:50:21So we gave the 28 target for the growth. And since you are Julien following us for quite a long time, when we give targets, usually we have a path how to reach them. We definitely when we see this demand both in geothermal and in energy storage, we are increasing our efforts to develop more projects. I also mentioned the legislation on permitting that we hope will be finalized next year. So we do believe there's an option for upside on both the geothermal and the storage area. Speaker 200:51:07And as we move forward, we will update it similar to the 26 numbers that we increased them during the term. That's hopefully what we will be able to do if all goes well for the 28 numbers as well. Speaker 800:51:24Got it. And then related, how do you think about ERCOT here? I mean, I see further assets being announced there. How do you think about balancing the risks on ancillary pricing and there's some concerns about saturation out there in that market at a certain point? Again, obviously, lots of opportunities in the West here. Speaker 800:51:39But again, as it stands today, pricing seems quite attractive in Texas in the here and now. Speaker 200:51:46Yes. So that's an excellent question, Julien. That's why we are negotiating today for both Buildog and Lower Rio tolling agreements. And once we'll be able to sign them, we'll have a much better balanced portfolio, be able to release more projects in Texas. At the end of the day, we are targeting roughly overall the portfolio about 50%, 50% merchant versus contracted. Speaker 200:52:12And once we are able to contract projects in Texas, it will allow us on one hand to reduce the risk of pricing going down in Texas. But on the other hand, we do want merchant projects in Texas because we do see some potential upside on specific days in the year or specific months. So we are trying to balance between the 2. And that's how we are releasing projects. Speaker 800:52:47All right. Fair enough, guys. Thank you very much. Good luck with all the efforts. Thank you. Speaker 100:52:51Thank you. Speaker 300:52:52Good luck here, Jefferies. Operator00:52:56And we'll take our final question from Jeff Osborne at TD Cowen. Speaker 1000:53:01Hey, good morning. Just one question on my side. Asi, I was wondering on the ICC cash benefits, how we should think about that benefit in the 3rd Q4? I think you said 125 for the year. I assume Q3 is a big number just with bottleneck coming online, but any thoughts on how we should be modeling that? Speaker 300:53:20From a cash flow perspective, at the Q4, we expect to utilize and sell the ITC of Battle Neck, which is equivalent to $35,000,000 in addition to utilizing the to do basically a tax equity transaction for a Heber plant, which is around €75,000,000 So that will be the majority of that. The remaining dollars are PTC that we plan to sell between September October. Roughly, we have $25,000,000 of PTCs that are part of the PTC transfer program and those will be sold between September October. These are the 2023 PTCs and the 20 24 PTCs. Under the new law, we can sell them to a 3rd party. Speaker 300:54:07And right now, we're negotiating final steps of that agreement. Speaker 1000:54:12Got it. And just to be clear, the 75 from Heber is also in 4Q? Speaker 900:54:17Yes. Perfect. That's all I had. Thank you. Speaker 100:54:21You're welcome. Thank you. Thank you, Operator00:54:24Jess. And that concludes our Q and A session. I will now turn the conference back over to Doran Blacher for closing remarks. Speaker 200:54:33Thank you. Thank you all for joining us today. This was a very good quarter for us and we are continuing to work and be focused on growth and profitability. I would like to thank you for your support and look forward to speaking with you again next quarter. Thank you. Operator00:54:51And this concludes today's conference call. Thank you for your participation. You may now disconnect.Read morePowered by