Costain Group H2 2024 Earnings Call Transcript

There are 6 speakers on the call.

Operator

Well, good morning and thank you for joining us this morning for Costayne's full year results for 2024. I'm Alex Vaughan, Chief Executive of Costayne and I'm going to sort of take you through the sort of highlights of today's results and also give you an operational overview. And then Helen Willis, our group CFO, is going to take you through the financial details of the results. And then I'll come back just to sort of take you through, give you an update on the strategy for the business and the outlook as we see it moving forward. Look, I'm really delighted to be able to report another strong set of financial results for the business that demonstrate the strong operating performance of the business and the robust financial position that Cosdane finds itself in and how we're capitalizing on the very clear strategy that we've got as a business.

Operator

As you'll have seen in the results, the adjusted operating profits have increased by 7.5% to $43,100,000 and operating margins are at 3.4% and we're achieving the targets that we set out and announced two years ago. We've also had an increase in adjusted EPS up 19.7% to 14.6p. And free cash flow remains a real strength of the business. It's part of how we perform as a business and that's we've got a net cash position at the end of the year at $158,000,000 And it benefits from the way we select the contracts that we want to do and the way that we deliver our contracts. Really positively on the back of the strong performance, we've also delivered a record increase in the forward work for the business up by billion to billion.

Operator

That's over four times the annual revenue of the business. And we continue to be incredibly busy bidding further work and we look forward to securing further work throughout the year. Our strategy that we've been implementing is clearly delivering growth and the positive outlook as a result of the markets that we're focused on where essential infrastructure is being delivered and is being invested to meet some of the real critical national needs that our country has. We're successfully building a broader customer base, which has been one of the priorities for us that brings long term resilience to the business, but we're also continuing to develop and broaden the range of services that we provide. Today being a leading construction business, but also a growing and meaningful consultancy business for our customers.

Operator

And as a result of the business being in good financial health and the outlook being very positive for us, we're very we're pleased to have been able to announce today a doubling of the dividend to our shareholders. So in summary, we've delivered a really strong financial performance. We've grown the amount of forward work that we've got in the business and we're in a really strong financial health all on the back of a very clear strategy. Now if I move to the operational sort of overview for you, A really strong performance in transportation. As expected, we've seen a small reduction in revenues and that was a result of a number of highway contracts coming to an end and the completion of our Gatwick Airport contract.

Operator

But the roads business has continued to perform strongly. We're completing a number of contracts for national highways as we speak, but also we're now moving through the design phase on the new M60 contract and we hope to be able to get that to start next year. And our Area 14 Highway maintenance contract is going very well and we're actively pursuing further work on the roads market. In rail, our activities on HS2 are progressing well and to plan. And I've got to say when I go around and I visit so many of the sites, the 21 sites that we've got, I'm blown away by just the leading edge way that we are delivering this major critical infrastructure program.

Operator

But we obviously announced two further wins on the HS2. So we got two large systems contracts, one being an HP Power contract for the whole of HS2 in partnership with Siemens Mobility and the other being the M and E fit out contract. And we expect those to start towards the end of the year and into next year. We've also completed the Gatwick Airport contract, station contract, But we are securing greater volumes of consultancy work for Network Rail, really helping them think about some of the master planning. And that includes work that we're doing for the Department of Transport in thinking around some of the big decisions around the integrated rail plan.

Operator

And we're pretty busy growing the pipeline of work in rail, which gives us a lot of positivity. Integrated transport has

Speaker 1

given us growth within the year as we've got additional contracts coming through. Really good growth on our five year program

Operator

of work with Heathrow Airport. And you can see obviously there's significant investment that Heathrow and Gatwick and Manchester Airports Group will be making. And the good news is that we've got contracts with those people with those customers to work with them. And clearly, we're also growing our investment with Transport for London, upgrading some of their major transport facilities. So we see aviation, ports and devolved government as being a real strength market for us and for us to grow.

Operator

From a natural resources point of view, it continues to perform strongly, right, with growth right across all of the sectors that we're in. Revenue, profits and margins have grown right across the across the division as a result of real operational improvements that have been made, the quality of the contracts that we're writing and winning and the consultancy volume increases that have come through. Our water programs for six water companies, large water companies in AMP seven continue to grow as we get towards the end of the AMP and are operating well. Tideway, you'll have seen is now connected and and will make a sustainable difference to the River Thames, but also will unlock the growth for London to be a more resilient city. And that's now connected to the London network and we look forward to that completing this year.

Operator

And as you'll have seen, we've continued to secure extensions to a number of contracts including for United Utilities where we're providing the maintenance services for them, seven Trent Water and Thames Water. And then we've won a number of new programs that we've previously announced for Northumbrian Water, United Utilities and Southern Water. Many of those contracts for another twelve years, which really gives us an opportunity to make a real difference for those customers. Our energy activities are predominantly consultancy and we're seeing increased demand for our services and the leading position that we have in the energy transition. The first U.

Operator

K. At scale industrial cluster is up at Teesside and Costayne has done the design for the carbon capture network. We're now overseeing the program delivery of that. And we've also won the hydrogen network design, which we're doing at the moment. And we're also looking to grow our services around that place and helping a number of our energy customers upgrade their existing infrastructure and repurpose it.

Operator

And also we are targeting the energy grid upgrade as part of the future. Defense and nuclear energy also continues to grow in line with our plan and the opportunities are numerous in that area. In defense, the work that we do is associated with the continuous at sea defense for the submarine program. And then obviously the work in nuclear is about extending the life of the existing nuclear fleet and then starting to bring on new nuclear energy. And our bidding in this area is incredibly busy at the moment.

Operator

So overall, I'm really pleased with the strong operational performance of the business. The growth in profits, margins and securing a high volume of work are testament to an amazing team and the focus that we've got in the delivery of our strategy. And we expect to see further progress on the back of a very busy bidding period. And I'm now going to hand over to Helen. Good

Speaker 1

morning. So it's great to be able to deliver another set of strong results. We've been talking about momentum in the business and I think that you can really see it coming through in the numbers now. So building the operating profit, the margin is going up, the forward work is there and that strong cash generation is backing everything up. So it's actually a delight to be here to be able to talk through the results.

Speaker 1

So first of all, we'll go through the headline financial results. So revenue, CHF 1,250,000,000.00 this year, slightly down from last year. And as Alex has just said, that was as expected with the runoff of certain contracts. Adjusted operating profit up 7.5% to CHF 43,100,000.0 and that's at the upper end of expectations and reported operating profit up as well. We saw continued margin improvement with adjusted operating margin increase of 40 basis points, up to 3.4% and that's against 3% last year.

Speaker 1

And we delivered an operating margin of 4.4% in the second half of the year and we remain on track importantly to deliver the adjusted operating margin run rate of 4.5% in FY 2025 with our ambition to reach 5% in the future. Adjusted basic earnings per share for FY 2024 was up 19.7% at 14.6p not supported by net finance income and an adjusted effective tax rate of 18.3%. And as Alex said, we've been delighted to double our full year dividend to 2.4. Net cash at the end of the year was in line with expectations at million and that's after investment in the business and a share buyback in the year. And of course, we delivered a record increase of billion in that high quality forward work at billion.

Speaker 1

So turning to revenue, just take you through the divisional highlights. So revenue produced 6.1% over last year as expected. In Transportation, we saw reductions in road volumes as we've just been mentioning due to the completion and delays of certain projects and in rail due to the completion of our main works at Gatwick Station. And then in Integrated Transport, we do have an increase with the growth in H7 at Heathrow and new contracts

Speaker 2

at

Speaker 1

TfL. Natural Resources revenue increased by 4.2%, so it's reflecting growth in Defence and Nuclear Energy and in Water and stable revenues in Energy. Water increased by 2.5% as the industry moves from AMP7 to AMP8. And we've got good visibility across our ongoing five year AMP7 programs through to this year and our AMP8 projects for the period twenty five to thirty. We expect to see strong growth.

Speaker 1

Our work for Tideway as Alex just mentioned is connected for operations in February 2025 and work is ongoing there as we're responsible for the Eastern Section. Energy revenue increased by 1.3% on the prior year and we expect significant long term growth in this sector given the requirement for energy infrastructure investment to support economic growth, tackle climate change and enhance the natural environment. Defence and Nuclear Energy supports several public and private sector organisations in a variety of customer side delivery partnership roles. We saw revenue increase there 9.8%. We deliver a mix of services and expertise with engineering and construction solutions on major capital programs representing a majority of the revenue.

Speaker 1

In addition, we're building a meaningful consultancy service and this represents 12% of revenue. And Alex will cover this a little bit more later in the presentation. Moving now to the operating profit walk. The adjusted operating profit grew by 7.5% to million driven by margin improvement in both divisions. We've seen 12.7% compound annual growth in our adjusted operating profit since 'twenty one.

Speaker 1

Margin improved with an adjusted operating margin increase of 40 basis points to 3.4% and that's compared to 3% in 2023, that's 0.8% higher than 2021. I'll cover the adjusting items on the far left and far right of the chart on the next slide. Profit in transportation increased by million to million and that's due to improved operating performance margins across our newer contracts, giving an operating margin of 3.5%, up 50 basis points versus last year. Natural Resources was up million, bringing the divisional operating profit to million. The operating margin for this division increased 30 basis points on the prior year to 5.9%.

Speaker 1

Central costs increased by 0.9% on the prior year and that's driven by cost and wage inflation. But it's important to note that the total administrative costs across the group decreased by 5,800,000 on last year from 78,000,000 to 72,200,000.0 and 4,500,000.0 of that decrease has been driven by the transformation net of cost and wage inflation and after incremental investment in the business. Moving on to the adjusting items. During the year, we incurred million in respect to the final year of our transformation program, down from million the previous year. And during the year, we also settled a claim related to the design and build of a residential development completed in 02/2001.

Speaker 1

A detailed review has identified one other potential related obligation and a provision has been created for this liability. Both the settlement and the provision have been treated with adjusting items, reflecting that the costs have not relate do not relate to Costayne's normal course of business. Adjusting items in 2023 also included million relating to an impairment of intangible asset following the repositioning of our digital services. Finance income for FY '20 '20 '4 increased by five point sorry to million as compared to million in the previous year and is driven by interest income from bank deposits higher than the previous year on increased cash placed on deposit and higher rates. We also incurred million of banking facility fees, which was lower than the previous year, firstly on the reduction of the facility and secondly from lower amortization fees arrangement fees.

Speaker 1

The interest income on the net assets of the pension scheme was lower than the previous year at million due to lower pension scheme asset position over the year. Interest expense on lease liabilities was million higher than FY23 due to higher charges on new property leases entered into during the year. The balance sheet continues to strengthen with net assets increasing from million as at the 12/31/2023 to million at thirty first December twenty twenty four. Non current assets have increased from the prior year end position driven by an increase in the retirement benefit assets and that's due to a change in discount rate assumptions. And we've also seen an increase driven by the capital investment undertaken during 2024.

Speaker 1

Trade receivables and other current assets balance have decreased on the prior year, driven by a decrease in trade receivables. And trade payables and other liabilities have decreased largely due to a reduction in contract liabilities. I'll walk you through this chart from left to right. So the red bar at the left hand side of the chart shows cash flow on adjusting items of million, which is principally payments relating to the transformation program in the year. Adjusted free cash flow of million is shown next in the boxed area.

Speaker 1

2024 was lower than FY 2023, principally reflecting the timing driven working capital flows around the year end. And we also incurred higher capital expenditure payments of million as we have begun to invest in new systems and offices. In the year, we've made cash contribution payments to the pension scheme of million in line with the agreed reduced deficit contribution plan with the trustee of the group's defined benefit scheme. An assessment of the scheme's funding position was carried out at thirty one March twenty twenty four and as the funding level was more than 101%, period should the scheme level have been less than funding level would have been less than 101%. We saw net interest receipts of 2,200,000.0 in the year.

Speaker 1

It's worth noting that operating lease expenditure is shown separately from cash from operations and this was 11,300,000.0 for the year. With million costs from the share buyback in the year, our dividend payments totaled million and we also acquired million of treasury shares during the year. We expect our FY 2025 year end cash position to be in line with current market expectations of around 180,000,000. And finally, I'm happy to announce that we have been reconfirmed as one of the top fastest paying lead contractors in construction, paying 98 percent of invoices within sixty days. Caspersus cash position for 2024 cost and cash balances of million, cash held in joint operations million and borrowings of nil.

Speaker 1

We've introduced average month end and average weekend measures. And during the year, the group's average month end cash balance was CHF169.8 million and the average weekend net cash balance was CHF 164.3 million as compared to CHF141 million in FY 2023. This continued growth in our net cash balance is a clear illustration of our continued strong underlying cash flows. Utilization of the total bonding facilities as of thirty one December twenty twenty four was million. Our facility agreements run to September 2026 and they comprise an million sustainability linked revolving credit facility and surety and bank bonds totaling million.

Speaker 1

This is backed by a group of four banks and five sureties. For the year end thirty December twenty twenty four, the group has changed the presentation of amounts held in trust bank accounts on behalf of certain customers and designated for future payments to suppliers. These were previously recognized in the group's balance sheet as a trade receivable. This is shown in the bottom left table with a balance of million. The group has represented these accounts as cash and cash equivalents with restrictions and restated the comparative as at December 2023 resulting in no net impact on the statement of financial position and no impact on profit and loss.

Speaker 1

As we've mentioned a couple of times, we're obviously very proud of it. There was a record increase in our full water work position. It's at billion at the end of the year, an increase in billion and that's from billion at the December 2023. The contract wins across all sectors and significant growth in water and rail. The full position is a combination of the order book and preferred bidder book.

Speaker 1

Our order book stood at billion at the period end, up from billion at the end of twenty twenty three. The order book evolves as contracts progress and new contracts are added at periods aligned to our customers' strategic procurement windows, which are typically every five years. The order book does not therefore provide a complete picture of the group's potential future revenue expectations. We've seen a continuing shift towards a preferred bidder book away from the order book as we continue to secure long term five to ten year framework positions with our customers, especially in the water sector, providing a reliable and long term stream of future work. The preferred bidder book increased to billion at period end, up from billion at the end of 'twenty three and includes contracts in all sectors.

Speaker 1

It comprises contracts for which we've been selected on frameworks where further works order is required prior to the work's commencing. Importantly, the quality of this forward work reflects long term programs with no single stage lump sum contracts and is predominated by target cost contracts where the scope of work, design and cost are developed and agreed with the client. This together with growth on existing frameworks gives us increasing visibility and confidence on delivering progress in FY 2025 and 2026 with a step change in performance in FY 2027 and beyond. We've shown you this chart a few times and I think it's important to reinforce that we continue to monitor and manage the business really tightly with an approach to risk that pervades everything that we do. So we transformed our business in terms of assured delivery, lower risk contracts in our forward works, improved operational effectiveness, cost control and a broader business mix.

Speaker 1

We've invested in how we procure, invested in our gating and governance and our building activities and we've invested in how we monitor performance. A key part of transformation has been to build risk and assurance skills and processes right across the business. This focus drives the path to higher margins as demonstrated by our continued margin progression over the prior period. We've delivered a further year of margin improvement up 40 basis points to 3.4% in the second half sorry 3.4% with a second half of 4.4%. We remain on track to deliver adjusted operating profit margin of 4.5% during FY 2025 by improving margins within complex program delivery, further efficiencies from our transformation program and increasing the mix of higher margin contracts.

Speaker 1

Costayne continues to perform well against its strategic targets and expects to deliver long term sustainable value for its stakeholders. The group's capital allocation priorities are investing for growth, a progressive dividend, selective M and A and returning surplus capital. The group's transformation program which simplifies and increases efficiencies within the business was largely completed during FY 2024. We invested around million in upgrading our HR system to increase efficiencies within the business and have also invested in office moves. Costayne will continue disciplined investment in the coming years in key areas such as systems and digitization that will accelerate its business improvement.

Speaker 1

The board recognizes the importance of dividends for shareholders and dividend payments taking into account the cash flow generated in the period, but also the potential impact of the dividend parity arrangement relating to the dividend defined benefits pension scheme, which continues until thirty one March twenty twenty seven. Over time, the Board expects to target dividend cover of around three times adjusted earnings. Dividend payments were resumed in FY 2023 with a year dividend of 1.2p per share for the year, in line with the pension payments level and the dividend parity arrangements. The Board has proposed a final dividend of 2p per share for FY 2024, an increase of 150% for the final FY 2024 dividend and an increase of 100% for the year. I mentioned in an earlier slide that pension contributions were stopped for the year as the funding level of the scheme at thirty one March twenty twenty four was more than 101%.

Speaker 1

This also means that dividend parity with the pension scheme was suspended for a year during July 24 to June 2025. A further annual valuation will be carried out as of thirty one March twenty twenty five, which will enable the board to review future capital allocations. We continue to review options for restructuring the defined pension scheme with the sole trustee of the scheme. In August 24, having reviewed the group's strong cash performance and ongoing capital requirements, we announced a non market share buyback program of million which completed in November 2024. So the successful execution of our strategy has delivered a record increase of our forward work position of billion to billion.

Speaker 1

This together with growth on existing frameworks gives us increasing visibility and confidence on delivering progress in FY 2025 and 2026 with a step change in performance in 2027 and beyond. We've already approximately 80% of our forecast revenue for FY 2025 secured at the end of twenty twenty four and our current levels of bidding activity remain high. Having successfully completed our transformation program and delivered a robust 4.4% adjusted operating margin in the second half of twenty twenty four, we remain on track for our targets for 2025. Balance sheet strength, strong cash generation and forward visibility of good quality forward work has allowed us to invest in the company to return surplus share capital surplus capital sorry to shareholders with a share buyback in the second half of twenty twenty four and to return to dividend payments doubling for the full year to 2.4p. So with that, I'll hand back to Alex.

Operator

Thanks, Helen. A really good set of numbers nicely presented. A lot of detail in there. Right. I'm now going to give you an update on the sort of strategy and our view of the sort of outlook for the business.

Operator

So as a business, we've got a very clear strategy all on one slide and it's about a business growing as we create a sustainable future for The UK. We're a purpose led organization, but we're a business where together with our customers, government and stakeholders and partners, we're going to create a sustainable future for The UK. It's about building a more prosperous UK, a more resilient UK and a decarbonized UK. We're going to grow by delivering this sustainable future because these are the challenges that The UK faces and these are the opportunities available to us, where the government has now focused its missions on. There is a clear need and drive to deliver regionally spread national growth across the business.

Operator

There is a clear need to be able to address climate change, both to mitigate future damage, but also for us to adapt to the climate that we experience today. There is a need for us to safeguard the very future of our water supply and for us to look after our environment in how we treat water. And there's also a growing need for us to preserve our national security in a world that faces increasing challenging international issues. Therefore, as a business, we're focusing on growing our business in what are growing markets and are set out there the strategic focus for the business. So the first one is for us to grow in what are growing markets for us and for us to be increasingly recognized for our predictable best in class delivery by clients and where we're further extending and growing the resilient customer base that we've been building over the last few years and growing a meaningful consultancy business for us.

Operator

And as a result of all of that, we will become an increasingly admired and growing company. And this is through our focus on markets where we believe and we can see that there is critical long term investment needed and it is being made to ensure The UK has that essential infrastructure to meet the national needs I talked about earlier. This is all aligned, as I said, to the current government's growth missions. And if you look at the second national infrastructure assessment put together by the National Infrastructure Commission that is due to be launched as an infrastructure strategy in June, you can see the volume of essential infrastructure investment that's made to meet exactly the challenges I said earlier. In these markets, we work with Tier one customers in strategic long term partnerships where we are offering an increasingly broader range of expertise and services to those customers.

Operator

Now our chosen Tier one customers in our markets predominantly operate through long term five year programs of work, underwritten by their business plans and regulatory commitments. Now importantly, Costayne has a tremendous track record of being able to secure positions on these investment programs. We have done for quite some time where we're able to work with our customers in creating, shaping and then delivering solutions to meet their wider business needs. These markets and these and our customers' committed spending programs give us the opportunity for us to broaden our service. So as we work with the customer, whether it be for five years or some of the water companies now for twelve years, we're really able to become part of their DNA.

Operator

And that allows us to really use our expertise and that is what helps us really drive the broadening of the offer in Costayne. So for example, we can talk about the water industry that's now embarked upon the biggest ever investment in the water industry over the next five years. What's more frightening is the five years after that is going to be even more investment. That is the scale of the challenge that we're facing up to and the opportunity for us. We've seen a lot of media coverage recently about aviation and our customers in the aviation space under their five year regulatory program are investing significant capital in upgrading and enhancing the capacity that they've got to meet increasing levels of travel.

Operator

And we also see companies like National Highways who are progressing with the delivery of their RIZ2 program and are currently working on their RIZ3 program. All long term five year programs. That's what when we talk about the quality of the forward work position for the business, it's the fact that we have five year visibility that we're able to work with our customers, help them develop the solutions, agree a price for those solutions and then deliver them in that long term framework. And as I've said, we've got a proven track record of securing strong positions with our customers through these cycles, building and maintaining long term relationships, many of whom we've worked consistently with for over twenty five years. The depth, strength and strategic nature of the relationships we have with our customers are a key enabler as again for us to be able to broaden the services that we have set out in our strategy.

Operator

We bring together through Costayne a unique mix of experts who have a broad range of solutioning and delivery expertise, where depending on our customers' individual approach, we act as either a construction partner or as a consulting partner. We're a business today that shapes and creates the solutions for the future for our customers. Today, we are the design partner for 12 of our customers and we also deliver a number of innovation projects for them step changing the way the future solutions are going to be delivered. We design infrastructure solutions and improvements for network rail, for the Department of Transport, for National Highways, for Transport London, for most of our water companies and for the energy companies. And we also do project controls to be able to oversee and help our customers manage their big infrastructure programs.

Operator

We also support the capital delivery of major programs for our customers, primarily

Speaker 1

as

Operator

a leading contractor, but also increasingly as a delivery partner program manager overseeing some of their big capital programs as their partner. And we also operate, optimize and repurpose existing infrastructure because capital programs in a five year period only touched 2% of the asset base for our customers. Therefore, we are increasingly growing our role in helping them optimize, repurpose and redevelop their existing infrastructure. And I've said before, for example, working with EDF, where we've got 170 people helping them extend the life of their existing nuclear fleet, but also where we're working with companies like United Utilities managing all of their asset maintenance over their five year program. We're uniquely focused around our customers' whole ecosystem and we look at our customers for their whole broad needs and how best through the expertise and strengths and capability of Costayne, we can support them transform their business performance.

Operator

As I've said, today, we are a leading construction company delivering major programs of work for our customers, but we're a meaningful consultancy business transforming their business performance as a valued partner. Now as I've said, we are we support many of our customers as a construction partner. And a few examples here, the Tideway major scheme that we're getting to a completion, very complex, very challenging program right in the heart of London. The highway schemes that we're delivering in Cornwall and the Northeast for National Highways and in The Midlands on the M6. The HS2 program where we're doing the section from the M25 through to Houston in joint venture and the M8 programs Heathrow, the baggage handling upgrade that we're doing Heathrow Airport for Terminal 2 and then the work we're doing keeping London's traffic flowing by upgrading their critical national infrastructure.

Operator

But we are growing a meaningful consultancy service. It's been a core part of our strategy. And as Helen said, it now represents 12% of our revenue and we expect that part of the business to grow. The largest area is where we're the delivery partner for our customers. This is where customers have made a decision that they want someone to work with them to oversee their capital program.

Operator

And this is where we bring to bear our team's amazing capability at coming up with fantastic solutions with a delivery expertise, so that we can deliver them predictably. And you can see that we're doing that for customer in defense. We're overseeing Cadence whole investment program for the East Of England. We've got the Devonport program, the big upgrade, twenty year upgrade to that facility. Heathrow Airport's program and then BP, where we're now overseeing the delivery of the carbon capture network.

Operator

As I've said, we're also a growing engineering and design business coming up with leading capital solutions. And I think what differentiates us is those solutions are driven by what is the most predictable way and best way you could deliver that infrastructure in a holistic design. But I'm blessed to work with truly amazing people, which is why the advisory and digital services part of the business is also growing. We have extensive capability through program management, program controls that we're able to help our customers in managing some of their wider business needs in that space. And as a result of our amazing people and the services we provide to the customers and the growth in the markets that we operate in, we've been able to grow our forward work position to $5,400,000,000 I think this map just shows the scale of the opportunities and where we're working with our customers right across The UK.

Operator

We're very proud of the increase that we've made to the forward work position, but we've got more that we want to do and we're very busy bidding further work. We've got very strong positions with our Tier one customers right across all of our sectors with an increasing broad service line. The quality of our forward work position, which Helen talked about, is a result of the robust approach we have to select in the contracts that we want to work on. And trust me, we don't want to work on all of them. And the expertise that we have in those key markets, but it's also about the fact that we're working with someone for five years.

Operator

And that's a partnership and we're able to work with them to develop the solution to agree the price and then to help them deliver that program. And in addition to this strong secured position, our work winning teams are absolutely flat out bidding further work this year and we have a very significant pipeline very similar to the level we had last year. Now we're steadfast in our commitment to ESG, right? This is really important to us. Our people, planet and society credentials are a clear point of differentiation for this business with our customers and wider stakeholders and support the delivery of the group's performance that we've been able to announce this morning.

Operator

Our customers expect us to be able to support them in meeting their commitments and therefore having these capabilities is really important to them in choosing their partner, especially if you're choosing someone for twelve years. Our performance and expertise supports us winning this work. Our approach around EDI ensures that we have the best team that come up with the best ideas and therefore we offer our customers the best solutions. It's fundamental to how we deliver business. And by working with our communities proactively, those that we live and work in, we can build strong relationships with them.

Operator

And as a valued partner, it will help us deliver infrastructure effectively. And we're committed to living our core values as a business in meeting our purpose of improving people's lives. And we've got a snapshot of some of the performance in 2024 across a broad range of areas. It's strong, it's going to get stronger and we will continue to drive further progress in this area, not because we just want to, but because it's absolutely a business imperative for us. So in final summary, you'll be pleased to hear.

Operator

I'm very proud of the continued strong operational and financial performance of an amazing team. The growth of operating profits, margins and we're on track to meet those margin targets that we set out previously. We've built a very strong financial position for the business, robust, resilient, allowing us to invest that's allowed us to increase our final dividend. As we said we would, we've won the work that unlocks the future for this business, a high quality forward work position built on long term customer relationships, amazing expertise within our team and a broader offer linked to meeting our customers' growing needs. Our strategy is very clear.

Operator

It's a focus on essential infrastructure that will deliver a sustainable future for The UK as we meet those national needs. And we're very confident in the future and the growth through 2025 and 2026, and we see a step change in our performance coming through in 2027 as a result of the positions that we've secured. We're very ambitious and I look forward to updating you further on our further progress. So thank you and we'll now take your questions.

Speaker 3

Just two from me. It's Andy Lambert from Investec. Just on the you talked about the step change in performance you expect from 2017. Just a bit more color around that. Is that just the contracts coming through?

Speaker 3

So is it volume, margin or a bit of both? And what would be the kind of key challenges for the group to meet that step changing performance? Is it people, resources? How confident are you in the capability to deliver that? And then secondly, just on capital allocation, obviously, quite a lot.

Speaker 3

You've got million share buyback done. I'm just interested to hear your kind of priorities around share buybacks, maybe some investment for growth you mentioned and the dividends for the next year or two?

Operator

If I do the first one, you do the second one? I'll have a go at the first one. So the step change really comes in, if we look at the volume of work that we secured in water and what we're seeing the sort of timing of that and when we see Ampeight beginning to reach its sort of high levels, that is going to come through in sort of 2027. So we're already working on design phase of some of those schemes that will probably continue going forward. But the real scale of water will really come through in 2027.

Operator

Also if we look at some of the transport infrastructure that we're at the design phase on, we'd see those opportunities coming through at that phase. So it's really just looking at the sort of cycles of that area. And the margins will be fairly similar. The operating margins of our construction activities are now at a good sort of predictable level, which is great. And then our consultancy margins, we're winning work at the margins we'd expect to be able to make, which are in line with sort of normal market levels for our peers.

Operator

And we would see those coming through. Challenges, obviously, the people agenda is a big challenge. So we're recruiting 180 graduates and apprentices this year. We're investing a huge amount in developing the skills and capabilities of our team. Helen leads our frontline supervisor program and we're driving that.

Operator

So look, skills capability is going to be a key thing. So we're working really hard on building that capability up. Anything I missed?

Speaker 1

No, thanks. So yes, capital allocation. So we've been investing in the business. That's been absolute priority number one. Investing through the transformation.

Speaker 1

We've talked about the investment in systems that have started now and creating our environment to attract those good people into the business as well. So I think priorities going forward will remain that investment business. So there's more for us to do from a systems perspective that's going to bring real efficiency and a differentiator I think for us in our markets. So that's really important. We're off on that already.

Speaker 1

HR system done and working into sort of the delivery space now. So it's exciting times. It is. I'm very nerdy about this stuff. And then into dividends.

Speaker 1

So we've been sort of governed by the dividend parity with the pension scheme. We I talked about the March check that we did last year. We have to do a March check this year. My hope is that we're in a similar place, but we don't know until we've done the check at the March. We hear about that in June and that hopefully gives us optionality for July 25 to June 24.

Speaker 1

But as sort of underlying everything is we are firmly committed to moving towards that three times dividend and hence you see the increase in the full year dividend this year. We are now in a position, I think, with the cash balance where it is in the strength of the balance sheet to also think about M and A. It's not a priority for us, but actually we will look. We're interested. There might be things that bridge capability gaps for example is something we might consider.

Speaker 1

But priority to invest in that growth and get back to dividend three times.

Speaker 4

I've got the mic, so I'll just go ahead. It's Jonny Cooper, Deutsche on U. S. Can I I think you answered it there, Alex? But in terms of the Natural Resources margin tracking at a strong 6%, Should we take it there that you expect Ampeight to be at that margin level as well?

Operator

Well, I think that margin so that margin sort of reflects the sort of mix of work in Natural Resources at the moment. So there's a high volume of consultancy work in there. I would expect that margin to come off a bit as we grow in AMP eight. Naturally, we want to be growing our consultancy, but I think the volume increase in construction work that will come through Ampey will end up bringing that margin down a bit. That's what we would expect just as that mix changes.

Operator

But that doesn't mean we're not driving hard to grow our consultancy. It's just that the scale of capital delivery work will be pretty significant in that area. And I think

Speaker 1

as that volume comes through, obviously, we're going to we're helped by operating leverage there on our cost base of one contract to the other.

Speaker 4

And just one follow-up there. As the transformation program ends, do you think that volume growth can come through without any of those costs going back in?

Speaker 1

Absolutely. We've won the work. We can see the pipeline. We set ourselves up with our core skills to deliver it well. It's just about the timing of those contracts coming through.

Speaker 1

So I think we're set for that growth.

Operator

Yes. Thank you.

Speaker 2

Andrew Nussey from Peel Hunt. A couple of questions as well. As you sort of said, consultancy based revenues sort of around 12% of the group. When you look at those three segments, can you just give a feel for sort of the contract structures? Is it straight fee based?

Speaker 2

Is there an incentive mechanism there? Are you taking any risk on your delivery partners beneath you? And just in terms of the margin journey and the sort of the 4.5% run rate for the second half of this year, how much of the tailwind is there still from transformation? Or are we still are we more reliant now on mix and operational delivery?

Operator

Should I do the first one or you do the second one? Yes. So just thanks, Andrew. Just so on consultancy, so the biggest one so of the three elements, the biggest one is the delivery partner contract. And essentially there, we've got teams that are fully allocated to that work for a long period of time.

Operator

So we don't have utilization issues to manage. We've got long term structure and it's we're paid on a people per day rate. So the fee is based on people. There are some KPIs around performance alignment that can come through, but not that exposes us to risk, but more gives us an upside incentive. And we don't take the risk on any of the deliveries.

Operator

So we oversee the partners that are delivering that program. If If I look at the engineering and design very clearly that is a utilization model. So we have we've actually just brought in a new leader to lead that as it's a growing business and something that we're pushing hard. But there we are we manage the utilization of our teams and we bid for that work and that. And again, we sort of earn a fee on each of those people working on there.

Operator

And then advisory and the advisory piece is a mixture of the two. So for example, where we're working with EDF, that's 170 people fully co located with EDF around the country, supporting them extend the life of that, whereas some of it will be some of our P3M expertise will be on a sort of people hour basis supporting some of our major customers in driving project management change in their organization. So it's quite different. But the risk is not really on the downside. It's more on the upside linked to performance.

Speaker 1

So target margin, so 4.5% during FY 2025. So think about that as the second half versus the 4.4% that we've delivered in 2024. So it really is about the improving, if I can just call it the health of the portfolio. So as we've the portfolio is more full of work. We've gone more recently with better T's and C's managed in a much tighter way.

Speaker 1

That's really what's driving the majority of that margin increase. It's not cost out programs driving this next push and a little bit of mix coming in. But as we talk about, it's relatively small compared to the key volume of the construction work. So really it's about improving portfolio, I would say.

Operator

Thank you.

Speaker 5

Fantastic. Thank you. Most of the questions have been asked. But if would you like them one at a time or individually?

Operator

Well, whatever you want to work with.

Speaker 5

Okay. Maybe just to start off with the dividend. If you get a good actuarial review in June, how quickly do you think you could bring that dividend cover down to three times? And secondly, on the pension, you alluded to kind of options for pension. I can imagine what those options are, but would love to hear your view of how you think you can manage the pension risk going forward?

Speaker 5

And finally, on the non underlying items, two of the problem contracts were in fire safety. Could you explain kind of is that a coincidence or is that related to the Building Service Act?

Operator

I'll do the first two.

Speaker 1

I'll do the first two. So, Dibele, yes, we'll do the check as at the March. We hear about it during June. As things stand, I would hope that that would be over 101%. Let's see.

Speaker 1

It's not done until it's done. And that gives us optionality for July 25 to June 24. I think we have an ambition to return to three times, but we will do it gradually. And if indeed we do have that dividend parity removed for the year, then we will consider other options as well as we have done in this past year. Pension options, we sort of talked about the restructuring.

Speaker 1

So we're going into the triennial review now due to be completed during the middle of next year. We'd hope to do it pretty quickly. Key things there are keeping cash contributions to a minimum dividend parity. Removal would be great to do, but we'll see where we go. And of course, there's always the option to take it off the balance sheet, which is becoming more and more feasible with where interest rates are and so on.

Speaker 1

So we are actively looking at that. But those are all things that we'll consider during the fairly lengthy valuation process that we'll go through during 2025.

Operator

Yes. I think the fire the two fire safety matters relate to what you said in your question there, Joe. These are small two cases where there's been a need for some remediation to the fire proofing on two buildings. So following our review though, that's the work. One of them has been completed and the other one is in the process of just being finalized.

Speaker 5

Thank you. So it does relate to the building services. Thank you. And just following up on the dividend parity, could that be removed permanently?

Speaker 1

I don't know. That's what it could be.

Operator

Yes. That's the hope.

Speaker 1

That's the

Speaker 2

hope. It's Ed Press for Berenberg. Just a couple please. Firstly on cash, what do you view as an optimal cash balance? And how do you think of that?

Speaker 2

Is it kind of a percentage of revenue? Or do you look for an absolute level? And secondly, there's much talk at the moment. The market's become more rational. Margins have improved.

Speaker 2

Particularly in Natural Resources, you've got 5.9%. Is that bringing new players into the game? Or are you sufficiently protected by your expertise, by your relationships?

Speaker 1

Yes. So cash, no, I don't think about it as a percentage of revenue. The working capital flows are fairly steady. I think about it more as an absolute level. And we've talked in the past to sort of use the phrase more than enough cash.

Speaker 1

Clearly, with the commitments we've made and the investment that we've made in the likes of CapEx, the decision to do a share buyback, you can see that we think the levels that we've been at during 2024 are sufficient for us to be making those sorts of levels of payout. All of our plans say that cash generation will continue in a similar fashion and therefore the cash balance will grow. And I think that leaves us with the same sort of optionality.

Operator

I think coming to your second bit, I think the market is a lot more sensible and rational. I think competitive behaviors, everyone now knows that what risks you can take in a contract, what risks you can't take, and everyone's probably more sensible around the margins that we need. We've all got the same investors, the listed businesses. So that is good. So you're able to win a work at a good margin.

Operator

And I think probably the lessons of some of the historical failures have driven that, which is great. And yes, look, we win work on our expertise. So if I look at the water work that we've won, it's a result of the relationships we have with those customers and the expertise that we've got in being able to work in that environment and provide solutions and deliver predictable. And it's exactly the same if I look at the two systems contracts that we've won in transportation. The fact that we delivered that work expertly during Crossrail is probably one of the big reasons why we were probably the perfect choice for that work.

Operator

So it does come back to your reputation and the relationships that you've got and the experts that you've got in your team to win that work. So we're not seeing that many new entrants. I mean clearly, we've had the big Europeans come in during HS2, but that was a requirement when HS2 procured the program that they wanted a European in every joint venture. But no, we're not. But it's still very competitive as much as I'd like it not to be.

Operator

It's still a very competitive market, but you tend to be selected on quality rather than cost. Any other questions?

Speaker 3

Max Hayes from Cavendish. Yes, I think it's just a follow on from a couple of questions we already had. So just given that the mixture of revenue is going to change, particularly from water, Just wondering how that sort of impacts your 5% margin target?

Operator

Yes. Look, I think we've clearly got a plan and a sort of business plan of where we want to get to over the next over the medium term. And that's all fit our margin targets that we set out reflect that. So I think my comment was more natural resources at the moment is trading a very good margin, which I'd like it to be more. I'm just looking at the MD, I'd like it to be more.

Operator

But it just reflects that the mix of work will change. So we expect our margin to be a combination of number one, just predictable best in class delivery, which we're increasingly seeing and that's giving us a really good underpin to a solid margin. Absolutely, the growth of consultancy as a whole. So when we look at the significant increase that we could see in that and the margin we can earn from that, what that will give us. And then as Helen muted, we've got the economies of scale as we become a bigger business.

Operator

We don't need two chief execs hopefully. And we'll just have the economies of scale and that's what's going to get us to those margin targets as we grow the business.

Speaker 3

Great. Thank you very much.

Operator

Okay. All right. Let me just well, thanks very much for your time. And we're around if you want to chat to any of us any further. And as I said, very excited about the direction of travel that we've got and the future that we've got and look forward to updating you again soon.

Operator

So thanks very much. Keep safe.